Erection of 30 no. PV modules, including all electrical and mounting equipment, on south facing slope of existing roof of dwellingDecision record indexed
Increase of the roof pitch and ridge height of the existing single-storey side annex of dwelling to accommodate new bathroom at first-floor level, make modifications to existing dwelling and all associated site development worksDecision record indexed
Poppyfield Retail Park, Cahir Rd Ballingarrane, Clonmel Co. Tipperary
An Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary worksDecision record indexed
Abbey Farm in the townlands of Inishlounaght and Ballingarrane South, to the south of Cahir Road (R707) and to the west of the Gort Na Manach estate, Clonmel
Development which will consist of the following on a site with a total area of c.3.13ha: a) 96 no. (semi-detached, detached, and terraced) houses comprising 7 no. 2-bed houses, 53 no. 3-bed houses and 36 no. 4-bed houses; b) a two-storey childcare facility with a total gross floor area of c. 369 sq.m and an associated outdoor play area of c. 257 sq.m; c) the provision of public open space comprising 3 no. spaces including play equipment, and the provision of private open space for the proposed houses; d) a total of 206 no. car parking spaces comprising 185. no. residential spaces, 8. no. visitor spaces, 6 no. creche staff parking spaces and 7 no. creche drop off spaces; e) vehicular site access to the northeast of the site to the north of the existing residential area of Gort na Manach, and a pedestrian connectivity link along the eastern boundary to the existing residential area of Gort na Manach. Provision for 2 no. potential future access links on the southeastern and western boundaries; f) the proposed development also includes all associated landscaping and planting, boundary treatments, road and cycle infrastructure, bicycle parking for residents, visitors, and the childcare facility, scooter parking, EV parking and ducting, public lighting, drainage works, SuDS features and all associated and ancillary site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning applicationDecision record indexed
The construction of an extension to the rear of the dwelling house and for additional roof windows on the existing roof elevation, all with associated site works. RETENTION PERMISSION for (1) the attic conversion including roof windows; (2) the location of the dwelling, the septic tank and percolation area; (3) the as constructed garage (all from that previously granted planning permission under planning reference number 00/400) with all associated site worksDecision record indexed
Demolition of an existing flat roof extension, and construction of a new extension, to the rear of the existing dwelling, and alterations and repairs to the existing dwelling and associated works. The property is listed as a Protected Structure (Reference Number TRPS1698) and is within an Architectural Conservation Area (Marlfield)Decision record indexed
The single-storey porch to the side of the dwelling, pedestrian gateway on western boundary and associated works. The property is named a Protected Structure R.P.S. Ref: S1047 / N.I.A.H Ref. 22112005Decision record indexed
A) the changes to the elevations of the house, b) an increase in the floor area of the house, c) the location of the wastewater treatment system, d) the entrance as constructed, and e) the landscaping treatments and site layout as constructedDecision record indexed
(a) 2 No. single storey extensions to the rear of the house (dining room extension with a stove and external flue & a utility room extension and toilet); (b) 2 No. Free-Standing sheds (one to the side of the dining room extension and one in the north west corner of the back garden)Decision record indexed
Construction of a single storey extension to the rear of existing dwelling, alterations to elevations and associated site boundary and site develoment works. Retention Permission of existing single storey extension to the side of the dwellingDecision record indexed
The construction of a single storey extension to the rear and side of the existing building together with all associated site worksDecision record indexed
Construction of 49 no. residential units, new vehicular and pedestrian entrance, together with all roads, footpaths, underground services, connection to public services, surface water detention basin, car-parking, pedestrian and cycle connection to Mountain View estate, public open space, public lighting and associated site boundary and site development worksDecision record indexed
Ard Gaoithe Business Park, Lawlesstown Clonmel, Co. Tipperary
The alterations to previously granted permission (PD. Ref: 22689), incorporating the amalgamation of units 1 and 2 and for the change of use from light industrial to warehouse and storage use, together with all associated site development worksDecision record indexed
Parklands Estate, Glenconnor Td Clonmel, Co Tipperary
1) 52 No. dwelling houses, (4 No. 4 Bed detached, 26 No. 4 bed semi-detached, 16 No. 3 bed semi-detached, 4 No. 3 bed end of terrace and 2 No 2 bed mid terrace), 2) construct all roads, footpaths, green areas and associated services, 3) connect to existing services on site, 4) carry out all ancillary site works. A Natura Impact Statement will be submitted with the applicationDecision record indexed
The construction of a light industrial Unit which will be sub-divided into 3no units each incorporating two-storey office space. The proposed development will include an access road off the existing Ard Gaoithe Business Park road, roads, yards, carpark area, site fencing, site lighting and all associated siteworks including connection to all existing site servicesDecision record indexed
The construction of a single storey extension to the north facing gable of my dwellinghouse along with all ancillary site development worksDecision record indexed
The as constructed 2 storey extension to gable of existing dwelling house along with domestic shed to rear of existing house and any necessary site worksDecision record indexed
The changes to previously approved permission (Ref no. 2260698) comprising of alterations to houses No. 1 and No. 2 including increase of floor area and changes to elevationsDecision record indexed
Construction of a single storey extension to the rear (south) of existing dwelling house, conversion of garage to living space including modifications to front and rear elevations, new velux window to east side roof and all associated site development worksDecision record indexed
The construction of a wholesale warehouse including all associated site development works such as yards, carparking areas, fencing, lighting, drainage and access from the existing Ard Gaoithe Business Park roadDecision record indexed
A) Construction of a retirement village with 50 no. residential units, consisting of 28 no. 2 bed units, 22 no. one bed units, and 1no. facility building. B) Construction of all roads, footpaths, underground services, public open space and public lighting C) Connection to existing foul sewer network, and existing surface water drainage network. D) All associated site boundary and site development works, including partial demolition of existing boundary wall to create a new pedestrian and vehicular entrance from Glenview CloseGrounds not yet categorised
Construction of a first-floor extension over the existing single-storey rear annex of our dwelling, make minor modifications to existing dwelling and all associated site development worksDecision record indexed
Construction of 46 residential units in 8 no. 1.5, 2 and 2.5 storey blocks comprising of: 14 no. 1 bedroom apartments, 6 no. 2 bedroom apartments, 12 no. 2 bedroom houses, 12 no. 3 bedroom houses and 2 no. 4 bedroom houses. New vehicular and pedestrian entrance from Wheatfields, access roadways, footpaths, lighting and associated site services and all associated site boundary and site development works, including connections to public drainage on Glenconnor RoadGrounds not yet categorised
Alter the proposed house type on Site No. 2 from that grant under Permission Reference No. 18600482, the alterations will include changes to window positions and sizes and alterations to layout internallyDecision record indexed
1) to remove existing foundation to section of site boundary, 2) development of gabion baskets, 3) new boundary treatment, 4) and associated drainage management. This proposal is an amendment to that permitted under Planning permission ref 20/1609Decision record indexed
1) demolish existing rear extension and garage/shed area, 2) construct new extension and carport area, 3) raise the roof of the existing house, 4) amend existing entrance and all associated site worksDecision record indexed
The decommissioning of an existing septic tank and the proposed installation of a new wastewater treatment system & percolation area and all associated site worksDecision record indexed
The construction of a dwelling house with its own entrance from the road with a garage and associated site works (previous planning reference no. 18600482)Decision record indexed
Unit 3a Ard Gaoithe Business Park, Clonmel, Co. Tipperary
The construction of a boundary wall to existing parking area consisting of a 900 mm rendered blockwork wall including concrete cap with 1000mm decorative palisade type railing fixed on top, and the erection of a new security gate at existing property entrance and assoicated site worksDecision record indexed
The proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited is to apply for a change of use for the existing 100 square metre cottage, which is a protected structure on the development from domestic to office use. Existing outbuildings and sheds are proposed to be demolished.Decision record indexed
Demolish and remove existing garage and shed and for permission to construct a new two bedroom house (including one bedroom partly within the roof space), linked to the existing house and all associated site worksDecision record indexed
Lawlesstown and Parknascaddane, Cashel Road Clonmel, Co. Tipperary
A) the construction of a single-storey (eaves height 8.255m) Central Utilities Building in the service yard to the rear of the existing building to accommodate plant and equipment, and all associated site services and site development works.Decision record indexed
Lawlesstown and Parknascaddane, Cashel Road Clonmel, Co. Tipperary
A) Single-storey shed on the Western boundary of the rear service yard and all associated site services and site development worksDecision record indexed
A proposed single storey extension to the west of the existing facility, alterations to the roof plant screening enclosure and to include all associated site works, drainage, alterations to existing site levels and ancillary site development works, all access to the site will be by way of the existing access roads off Cashel RoadDecision record indexed
The elevational changes to the garage as granted under 06/115 and also retain indefinitely the change of use of part of the domestic garage to use as dog grooming parlourDecision record indexed
(a)demolition of existing single-storey structure. (b)development of a single- storey extension to the rear of the existing building to provide work shop and equipment maintenance facilities (c) all associated site services and site development worksDecision record indexed