Permission for retention for change of use of ground floor of existing dwelling and outside area to after school care facility and outdoor play areas and permission for retention of side canopy and play frame all as constructed.Decision record indexed
Permission for the construction of 43 no. dwelling houses and all ancillary site development works. The proposed development consists of the construction of 5 no. 4 bedroom detached dwelling houses, 4 no. 4 bedroom semi-detached dwelling houses, 26 no. 3 bedroom semi-detached dwelling houses, 4 no. 3 bedroom townhouses and 4 no. 2 bedroom townhouses. Ancillary site works include landscaping, public open spaces and servicing proposals. Access to the proposed development will be provided via the existing estate entrance and internal road network of the Sliabh Álainn residential development.Decision record indexed
(a) Construction of an extension to the rear of the creche, (b) internal alterations to the existing baby room, (c) minor alterations to the existing west elevation and all associated site works.Decision record indexed
The construction of a new dwellinghouse, detached domestic use garage, a waste-water treatment system, a new splayed vehicular access to the site and all other associated site works.Decision record indexed
Permission to construct new two storey and single storey extension at rear of dwelling house, extend first floor over existing single storey extension at rear (north east facing), new single storey extension at side (south east facing) and all associated site worksDecision record indexed
Palm Grove Mulberry Road Brigown Mitchelstown, Co. Cork
The construction of a single storey extension with first floor attic storage and rooflights, to the rear of the existing dwellinghouse, refurbishment and alterations of existing dwellinghouse, construction of detached domestic garage, improvements to existing vehicular entrance and all associated site works.Decision record indexed
The Beeches Mulberry Road, Brigown Mitchelstown Co.Cork
Permission for alterations to our existing bungalow. The alterations will consist of modifications to the existing windows throughout, replacement of concrete tile roof finish with modern black slate finish, replacement of uPVC fascia/soffit & guttering with aluminum fixings, the addition of a new fully external concrete & metal faced porch to the front of the property, demolition of the 2 no. existing chimney's, internal alterations with associated site drainage hard & soft landscaping and ancillary worksDecision record indexed
The construction of a dwelling house, garage, waste water treatment system, alterations to existing site entrance, boundary treatments, connection to public mains water supply and all associated landscaping and site works to site.Decision record indexed
Permission for retention of two cubicle houses, feed passage and agricultural store and Permission for construction of a loose house, cattle holding pen, polytunnel and associated works.Decision record indexed
Demolish a derelict dwelling upgrade existing entrance and to construct a single storey dwelling, garage, septic tank and percolation area and ancillary works.Decision record indexed
Retention of dwelling house as constructed, alteration to site boundaries, revised location of septic tank and percolation area, vehicular entrance and detached garage as constructed.Decision record indexed
Retention for a single storey extension to front of dwelling, dormer roof with first floor attic storage space and 2no. first floor windows over attached garage.Decision record indexed
Corracunna and Garryleagh near Mitchelstown Co. Cork
The demolition of existing agricultural structures and construction of a Central Gas Injection Facility within a site area of ca. 1.8ha, comprising of; a concrete apron; 16 no. truck bays, a welfare/office facility; Medium Voltage substation; 8 no. pressure reduction skid units; 2 no. boiler units; network entry facility unit; flare unit; odorant injection unit; propane storage; compressed natural gas refuelling area, electrical and instrumentation kiosk; generator kiosk; transformer kiosk; 8 no. compressor container units; 4 no. gas chromatograph units; covered shelter for storage of gas bottles; compressed natural gas dispenser; compressor building; on site drainage; underground pipework; 1 no. new site entrance from the N73 and associated drainage to serve the proposed facility nad adjacent existing Corracunna Above Ground Installation facility and the removal of the existing Corracunna Above Ground Installation entrance and; all associated site development works. The Major Accident Regulations apply to this development; it is a lower tier development. Permission is sought for a period of 10 years.Decision record indexed
Demolish existing dwelling and out building and construct new dwelling, domestic shed, new site entrance and all associated site works.Decision record indexed
The replacement of approximately 346m of existing 2.4m high chainlink fencing and associated access/emergency gates with 346m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing above ground natural gas installation.Decision record indexed
To demolish existing attached garage to side of dwelling and construct living room extension in its palace and associated site works.Decision record indexed
Permission for retention for extension to rear of dwelling and conversion of part of garage to utility room. Works include the addition of a window to the dwelling side elevation and the replacement of the front garage door with 2 no. windowsDecision record indexed
Permission for 1) Demolition of existing single-storey dwelling and adjoining shed, 2) Construction of single-storey replacement dwelling, 3) New waste water treatment system and percolation area, 4) All necessary services and site works.Decision record indexed
Alterations and construction of two number extensions, a) ground floor extension to rear of dwelling and b) first floor extension to side of dwelling and associated site works.Decision record indexed
Permission to (a) extend and upgrade existing clubhouse; (b) provide paved terrace area to upgraded clubhouse; (c) extend and improve existing car park; (d) widen existing pedestrian entrance; (e) upgrade existing access to rear of site for Astroturf pitch; (f) re-align and improve existing football pitches, including full upgrade of main pitch to the rear to all weather facility and including high quality 18m floodlighting; (g)construct 6m high backstop net to either end of main pitch; (h) construct 3.5m high fence and 1.2m railing along periphery of main pitch; (i) construct viewing area at main pitch; (j) construct a 1.2m railing along periphery of front pitch; (k) re-locate existing storage shed, dugout structures and container; (l) construct compacted gravel path alongside re-aligned pitches; (m) provide generator to rear of re-located container and all associated site works.Decision record indexed
To alter and to extend dwelling incorporating the following works, a) demolish existing flat roofed domestic rear extension circa 11.0 sq.m, b) construct a single storey domestic extension on the northern side elevation, c) construct a single storey domestic extension on the western rear elevation, d) construct a detached domestic shed/garage and all ancillary siteworks.Decision record indexed
A) retention permission for 3 number shipping containers (used for storage of furniture for donation to people in need, on a charitable basis), parking/loading area for an articulated trailer & b) planning permission for a proposed commercial entrance, and a "portable" waste disposal skipGrounds not yet categorised
19 Captain Keane's Grove Brigown Mitchelstown Co.Cork
Permission for alterations to existing dwelling to include installation of two windows to the rear of dwelling wall and permission for retention of change of use of two storey side extension to a separate dwelling unitDecision record indexed
Retention of single storey extension to the southern rear elevation and additional single storey extension to the western side of the dwelling.Decision record indexed
Permission to construct a two storey dwelling, entrance, detached single storey garage, waste water treatment system and all associated site worksGrounds not yet categorised
The Former Presentation Convent Convent Hill, Brigown Mitchelstown Co.Cork
The residential development will consist of 32 no. new dwelling units in the grounds of protected structure 00109 The Former Presentation Convent & Gate Lodge and the Entrance Gates to church, Convent Hill, Mitchelstown including the conversion of the Convent building to 6 no. dwellings as well as existing chapel use. The development comprises of 9 no. new detached dwellings, 6 no. new semi-detached dwellings, 11 no. new terrace dwellings with 4 no. dwellings and 2 no. apartments in the existing convent buildings, 5 no. new garages, provision for internal roads, access from local road, landscaping, car parking, substation kiosk, alterations to site entrance, demolition of ancillary buildings, associated site works and additional alterations, repair, restoration and consolidation of the convent buildings including the demolition of the former convent nursing home wing. Extension of Duration to Permission granted under Planning Ref. No. 18/5485Decision record indexed
The Former Presentation Convent Convent Hill Brigown, Mitchelstown Co.Cork
Permission for modifications and amendment to development permitted under planning permission 18/5485 (extended under 24/4659). The proposed development will include 6 additional residential units from that previously permitted and modification to 16 residential units previously permitted. The development comprises of the addition of 6 residential units (2 no. dwelling houses and 4 no. apartments, the apartments are located within the Convent Building) and the modification of 16 number residential units (12 no. dwellings and 4 no. apartments, the apartments are located within the Convent Building) along with ancillary site works including landscaping, retaining walls, provision of bin storage, bicycle parking, surface car parking and site services. Permission for retention is also sought for retention of retaining wall structure, completion of retaining wall and associated site works. The works are within the grounds of and to former Presentation Convent and Gate Lodge which are Protected Structures.Decision record indexed
Tesco Shopping Centre Brigown Road Mitchelstown Co. Cork
Permission and permission for retention for development at this c.0.013 ha site in the carpark of Tesco shopping centre. The development will consist of/consists of: (i) retention permission for ‘’click and collect’’ signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c.50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated ‘’click and collect’’ spaces for the existing Tesco store, a pedestrian crossing and all associated site development works.Decision record indexed
Mitchelstown Leisure Centre Brigown Road, Brigown Mitchelstown Co.Cork
Permission for the construction of a new single storey extension and covered area to provide additional W.C. facilities on the northern side of the existing gym and associated site works, and the construction of a new single storey extension to provide a new glazed entrance lobby to the leisure centre on the south side of the building and associated site worksDecision record indexed
Permission for the construction of a new single storey dwelling, single storey garage, site entrance, waste water treatment system and all associated site worksDecision record indexed
Ballinwillin House Ballinwillin Mitchelstown Co. Cork
Permission for the following works: a) partial demolition of the existing dwelling house b) construction of a single-storey extension to the side of the existing dwelling c) construction of a swimming pool enclosure and ancillary accommodation, including a gym, around the existing swimming pool for domestic use and d) renovation of existing out-building for domestic use and all ancillary site works. Protected structure: Ballinwillin House, Ballinwillin, Mitchelstown, Co. Cork, RPS No. 00104.Decision record indexed
The replacement of approximately 32m of existing 2.4m high chainlink fencing and associated gates with 32m of new 2.4m high green palisade security fencing/gates and all associated works at an existing Above Ground Natural Gas InstallationDecision record indexed
34 Upper Cork Street Brigown Mitchelstown Co. Cork
1) The construction of a new part single storey part two storey extension to the rear elevation; 2) changes to the existing northern gable elevation; 3) the construction of a new site entrance at the eastern boundary of the site; 4) all associated site works; all to the existing two storey semi-detached dwelling.Decision record indexed
The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of Corracunna and is surrounded by agricultural lands to the North and East, with the N73 national route to the south, and the L90813 local road to the west. The site takes in lands at Coolnanave and Garrane, on the western side of the L90813, to the west and north west of the main site area, to provide woodland planting and an underground drainage pipe and outfall. The proposed development comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured) and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,419.5 sq.m. Permission for the; (1) Demolition of existing single storey disused agricultural buildings, silos, and tank within the western portion of the site (total demolition gross floor area (GFA) of c. 1,781 sq.m). One single storey agricultural building (with GFA of c. 87.8 sq.m and height of c. 5.1m) will be stabilised and retained as a biodiversity building. (2) Construction of 3 no. digesters (c.15.6m in height), 2 no. digestates storage structures (c. 15.5m and 11m in height), 2 no. liquid storage tanks (c.12.2m in height) and a liquid feed tank (c. 8m in height), located in the southeast portion of the site. (3) 3 no. pasteurisation tanks (each c. 6m in height), a post-pasteurisation cooling tank (c.12.2m in height) and pre fertiliser manufacturing tank (c.12.2m in height), located in the centre of the site. (4) part single-storey and part two-storey reception hall (with a GFA of c. 2,112.6 sq.m and an overall height of c. 15.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site, to the north of the digesters. (5) a single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and a overall height of c.12.4 in height) will be located to the west of the reception hall, in the central portion of the site. (6) Odour abatement plant (with a maximum height of c. 6m in height) and equipment, a digestate offtake area, and a fuel tank (c. 1.6 in height) will be provided to the north of the solid digestate storage and nutrient recovery building. (7) Construction of an ESB substation (c. 3.4m in height) 2 no. CO2 tanks and a CO2 loading pump (c. 14.5m in height), along with associated plant structures including CO2 auxiliaries, CO2 liqueufactor, a CO2 compressor and a CO2 pre-treatment skid (with an overall height of c. 6.7m), located in the southwest portion of the site. (8) Construction of a biogas treatment skid, a biogas compression system, a biogas upgrading module (with an overall height of c. 5.1m) and a grid injection unit within a fenced compound (c. 2.8m in height), located within the southwestern portion of the site. (9) Construction of an emergency biogas flare (c. 11.3m in height) 2 no. propane tanks (c. 1.3m in height) and a grid off take skid, located further to the west of the site. (10) Construction of O2 generation unit (c. 2.6m in height), a biomethane boiler (c. 5.6m to top of flue stack), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 6m to top of flue), 2 no. pump houses (c. 2.6m in height, each with a GFA of c. 29sq.m) located in the southwestern portion of the site, south of biogas upgrading structures. (11) Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.6m and GFA of c. 271.5 sq.m), located within the western portion of the site, adjacent to the main site entrance. (12) A discharge pipe route extending to the northwest of the main anaerobic digestion facility site, crossing the L90813 and through agricultural lands to the River Funshion. (13) Alterations to theDecision record indexed