PROPOSED NEW DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, SEPTIC TANK TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED WORKSDecision record indexed
(i) the continued operation of the existing 80 metre meteorological mast which was erected as exempted development in accordance with Class 20A, Schedule 2, of the Planning and Development Regulations 2001 (as amended) and all ancillary infrastructure for a period of up to five yearsDecision record indexed
AMENDMENTS TO THE PERMITTED EXTENSION TO THE MOUNTLUCAS SUBSTATION WHICH INCLUDES AN EXTENSION TO THE EXISTING COMPOUND TO ACCOMMODATE A BUSBAR EXTENSION AND DEDICATED BAY (OFFALY COUNTY COUNCIL REF. 20/218). THE PROPOSED AMENDMENTS INCLUDE A 25.5 SQ.M CONTROL ROOM EXTENSION TO THE EXISTING SUBSTATION CONTROL BUILDING AND ALTERATIONS TO THE LAYOUT OF THE PERMITTED BUSBAR EXTENSION AND DEDICATED BAY. PERMISSION IS ALSO SOUGHT FOR A TEMPORARY CONSTRUCTION COMPOUND ON SITE. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED IN RESPECT OF THE PROPOSED DEVELOPMENTDecision record indexed
ALTERATIONS TO PREVIOUSLY GRANTED DWELLING HOUSE UNDER PLANNING FILE 78/578. ALTERATIONS TO INCLUDE: FIRST FLOOR, ADDITIONAL WINDOWS, AMENDMENTS TO ELEVATIONS AND REAR EXTENSION. PERMISSION IS ALSO SOUGHT TO RETAIN DOMESTIC SHED AND ALL ASSOCIATED SITE WORKSDecision record indexed
A. Construction of a new single-storey four bedroom Bungalow House B. Construction of a new single-storey Garage for domestic use only C. New septic tank and percolation area D. New vehicular entrance and all other associated site workDecision record indexed
1. REAR EXTENSION TO NORTH ELVATION, SIDE PORCH TO EAST ELEVATION AND FRONT PORCH TO SOUTH ELEVATION OF THE EXISTING SINGLE STOREY DWELLING. 2.RETENTION FOR TURF STORAGE SHED TO FRONT AND ALSO DRY STORAGE SHED TO THE REAR & ALL ASSOCIATED SITE WORKSDecision record indexed
The construction of a dwelling house, garage, installation of sewerage treatment system with percolation area and all associated site worksDecision record indexed
BRACKNAGH ARDRA MOANVANE GARRYMONA AND BALLYCHRISTAL, CO. OFFALY
ROAD / JUNCTION ACCOMMODATION WORKS TO FACILITATE TURBINE DELIVERIES ASSOCIATED WITH A PROPOSED WIND FARM DEVELOPMENT IN CO. KILDARE. A CONCURRENT PLANNING APPLICATION IS BEING LODGED TO KILDARE COUNTY COUNCIL IN RELATION TO A 10 YEAR PLANNING PERMISSION FOR A WIND FARM DEVELOPMENT WHICH CONSISTS OF 5 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 169M AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; 1 NO. ON-SITE ELECTRICAL SUBSTATION; 1 NO. TEMPORARY CONSTRUCTION COMPOUND; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE ELECTRICAL SUBSTATION; PROVISION OF NEW SITE ACCESS TRACKS AND ASSOCIATED DRAINAGE; ERECTION OF 1 NO. PERMANENT METEOROLOGICAL MAST OF UP TO 100M IN HEIGHT; AND ALL ASSOCIATED SITE DEVELOPMENT WORKS, ANCILLARY WORKS AND EQUIPMENT. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENTDecision record indexed
A new single storey dwelling and detached garage, opening of a new vehicular entrance to the site and wastewater treatment system and coco filter together with all associated site development worksDecision record indexed
Revised site boundaries, revised location of the house and Septic tank on site, PREVIOUS GRANTED UNDER PLANNING PERMISSION REF. NO. 24/60281 AND ALL ASSOCIATED SITE WORKS’Decision record indexed
The construction of (1) a running track (2) carparking facilities (3) associated lighting (4) vehicular entrance from public road (5) temporary storage cabin and (6) any associated site worksDecision record indexed
The development will consists of PROPOSED SINGLE STOREY TYPE DWELLING, NEW VEHICULAR ENTRANCE, SEPTIC TANK SEWAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.Decision record indexed
PROPOSED SINGLE STOREY TYPE DWELLING WITH DOMESTIC GARAGE, NEW VEHICULAR ENTRANCE, SEPTIC TANK WITH PERCOLATION AREA AND SECONDARY EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC GARAGE, A PROPOSED SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCEDecision record indexed
The development will consist of; THE CONSTRUCTION OF A DWELLING HOUSE, DETACHED GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS.Decision record indexed
For the construction of a dwelling house, domestic shed, new entrance, effluent treatment system, percolation area and all associated site worksDecision record indexed
Extending house, fit a new effluent treatment system and all associated site works and services.Retention permission for extension to rear of house as constructedDecision record indexed
SITE RELOCATION ON PREVIOUSLY APPROVED PLANNING REG REF 21/679 FOR BUNGALOW TYPE DWELLING & DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM & PERCOLATION AREA WITH NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
A BUNGALOW TYPE DWELLING & DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM & PERCOLATION AREA WITH NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
Construction of new two-storey extension to the front gable of existing dwelling together with all associated site works. Retention permission is also sought for existing dwelling as constructed and domestic garage to the South-East of the existing dwelling.Decision record indexed
TWO STOREY DWELLING, ENTRANCE, GARAGE, WASTEWATER TREATMENT SYSTEM WITH RAISED BED POLISHING FILTER AND ALL ASSOCIATED SITE WORKSDecision record indexed
THE CONSTRUCTION OF A PART TWO STOREY PART SINGLE STOREY DWELLING HOUSE, DETACHED GARAGE, INSTALLATION OF A SEPTIC TANK/ PERCOLATION AREA AND ANY ASSOCIATED SITE WORKSDecision record indexed
DRUMCAW OR MOUNTLUCAS, DERRYCRICKET BRACKAGH, TULLAMORE CO. OFFALY
EXISTING FREESTANDING STORAGE CONTAINERS. PERMISSION FOR (1) CONTINUANCE OF EXISTING AQUACULTURE FARM INCORPORATING FOUR FISH PONDS, AQUAPONICS POND, ALL CONNECTED USING INTERLINKING OPEN CHANNELS AND ASSOCIATED SITE DEVELOPMENT WORKS, AS PERMITTED UNDER PREVIOUS PLANNING REFERENCE 16/66. (2) CONSTRUCTION OF ELEVATED ANTI PREDATOR NETTING AND SUPPORT STRUCTURES INCLUDING ALL ASSOCIATED SITE AND INCIDENTAL WORKSDecision record indexed
CONSTRUCTION OF EXTENSION TO EXISTING SLATTED SHED WITH CONCRETE AREAS AND RETENTION PERMISSION OF EXISTING ENTRANCE, ACCESS ROAD AND ALL ANCILLARY SITE WORKSDecision record indexed
Druncaw or Mouth Lucas, Derrycricket Brackagh, Tullamore Co Offaly
1. Removal of existing container unit number 1 from North of the site and replace by 2 No. units – new innovation suite and store prefabricated building of 68m2 & welfare unit of 11m2 2. Relocation of existing 3No. container units (2,3 & 4) further to the southwest of the site and erect 2 new units - a new bio refinery prefabricated building of 36m2 and new living laboratory prefabricated building of 36m2 buildings in its place. 3. Additionally, construction of four 6m high poles for internet access points, new entrance gates, fencing and signage and new secure compound with fence and gates together with all associated site works.Decision record indexed
CONSTRUCTION OF DWELLING HOUSE, DOMESTIC GARAGE, EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA, RELOCATION OF EXISTING AGRICULTURAL ENTRANCE AND ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
NEW DORMER DWELLING HOUSE, DOMESTIC GARAGE, TREATMENT SYSTEM & PERCOLATION AREA, NEW BORED WELL, NEW SITE ENTRANCE AND ASSOCIATED SITE WORKSDecision record indexed
THE CONSTRUCTION OF A NEW SINGLE STOREY TIMBER DWELLING HOUSE, NEW VEHICULAR ENTRANCE, DOMESTIC WELL, WATER TREATMENT WITH FILTRATION AREA AND ALL ASSOCIATED ANCILLARY WORKSDecision record indexed
THE CONSTRUCTION OF A DWELLING HOUSE, GARAGE, INSTALLATION OF SEWERAGE TREATMENT TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A NEW INLET WORKS, CONSTRUCTION OF A NEW STORMWATER HOLDING TANK, CONSTRUCTION OF NEW CHEMICAL DOSING SYSTEM, CONSTRUCTION OF NEW POTABLE WATER BOOSTER STATION, CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS, CONSTRUCTION OF A NEW SLUDGE PUMPING STATION, CONSTRUCTION OF A NEW RETURN PUMPING STATION AND ALL ANCILLARY SITE DEVELOPMENT WORKS INCLUDING HARD AND SOFT LANDSCAPING.Decision record indexed
THE FOLLOWING (I) ONE NUMBER 110 SQ METRE DWELLING HOUSE AS CONSTRUCTED (II) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THIS DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE LISTED UNDER THE REF NO: 36-04 (THATCHED HOUSE)Grounds not yet categorised
DEMOLITION OF AN EXISTING FLAT ROOF EXTENSION TO THE REAR OF THE EXISTING BUILDING AND TO CONSTRUCT AN EXTENSION TO THE REAR OF EXISTING DWELLING. THE BUILDING IS ALSO A PROTECTED STRUCTURE (REFERENCE 36-04). THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED SITE-WORKS AND DRAINAGEGrounds not yet categorised
THE DEMOLITION OF AN EXISTING SINGLE STOREY EXTENSION AND OUTBUILDINGS TO THE EAST OF THE EXISTING DWELLING AND THE CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE EAST WITH AN OUTBUILDING TO THE NORTH EAST, THE BLOCKING UP OF THE EXISTING SITE ENTRANCE, AMENDMENTS TO THE EXISTING ROADSIDE BOUNDARY WITH THE CREATION OF A NEW SITE ENTRANCE, ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITEWORKS, INCLUDING A PROPOSED SEPTIC TANK AND PERCOLATION AREADecision record indexed
DERRYOUNCE LAKES AND TRAILWAYS CUSHINA, DERRYOUNCE AND DERRYVILLA PORTARLINGTON, CO. OFFALY
3 NO. "CONNEX" CONTAINER UNITS TO REPLACE FOOT BRIDGES, 9 NO. PLINTHS FOR ARTWORK / SCULPTURES, 1 NEW STEEL CONTAINER STORAGE UNIT AND ALL ASSOCIATED SITE WORKSDecision record indexed
DECOMMISSIONING OF 12 NO. EXISTING FLOODLIGHTS (9.5M HIGH) AND REPLACE WITH 12 NO. FLOODLIGHTS (16M HIGH) ON MAIN PLAYING PITCH. PERMISSION TO INSTALL 3 NO. ADDITIONAL FLOODLIGHTS (16M HIGH) TO SERVE EXISTING TRAINING PITCH. PERMISSION IS ALSO SOUGHT TO UPGRADE EXISTING ENTRANCE TO INCLUDE DISABLED ACCESS GATE TOGETHER WITH ALL ANCILLARY WORKSDecision record indexed
A STOREY AND A HALF DWELLING, ENTRANCE, GARAGE, WASTE WATER TREATMENT SYSTEM WITH POLISHING FILTER; AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A 30-METRE-HIGH MULTI-USER LATTICE TOWER TELECOMMUNICATIONS STRUCTURE WITH HEADFRAME, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4-METRE-HIGH PALISADE FENCE COMPOUND WITH ASSOCIATED GROUND EQUIPMENT AND ACCESS TRACKDecision record indexed
THE DEPOSITION OF SOIL AND STONE OVER AN AREA OF C. 5.88HA FOR THE PURPOSES OF LAND IMPROVEMENT WITH AN AGRICULTURAL END USE. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATIONDecision record indexed
National Construction Training Centre, Drumcraw or Mountlucas / Derrycricket, Daingean Co. Offaly
(A) The construction of Phase 1 of the Modern Methods of Construction (MMC) Demonstration Park consisting of 5no. demonstration structures which shall be used for training and research purposes. They shall comprise of: 1no. two storey Type A Structure; 1no. two/three/four storey Type B/C/D Structure; 1no. one/two storey Type E/F Structure; 1no. two storey Type G Structure; and 1no. two storey Type H Structure. (B) The upgrade of the existing foul water treatment plant. (C) The provision of landscaping, storm water storage swales, groundworks, service connections, roads/pathways/set down, public lighting, and all associated site development works to complete the development. A Natura Impact Statement (N.I.S.)will be submitted to the planning authority with this application.Decision record indexed
The provision of new entrance and ancillary site works and services on the R420, to future sports and community facilities which will be subject of a separate Planning applicationDecision record indexed