Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
The development consists of a two storey rear extension with tiled roof, 2 bedrooms bathroom, roof lights, open plan ground floor living area with internal alterations and all associated site works.
1) Demolition of existing single story lean-to-roof extension to rear. 2) New single storey flat roof extension to the rear. 3) New dormers to the front and rear of attic. 4) All associated site and auxiliary works.
Partial demolition of existing outhouse to side to accommodate construction of ground floor kitchen/living room extension to side of existing dwelling, and associated site works.
Partial demolition and reconstruction of a 2 storey, corner extension to the rear; provision of a new flat roof with rooflight to this extension; demolition of the two storey extension at the centre of the back (east) of the house; construction of a new flat roofed two storey extension with roof lights; repairs to windows with replacements where necessary or appropriate; construction of single storey bay extension with pitched roof to the south elevation at lower ground floor/basement level; minor internal alterations, general refurbishment, provision of maintenance access to centre valley, addition of photovoltaic panels, repairs to plasterwork, increase in height of rear garden boundary wall to the north; outbuilding to the rear, internal alterations, roof repairs, new doors and window and general refurbishment; minor hard and soft landscaping works including parking area to the northeast; all ancillary site works above and below ground.
Widening of driveway entrance. Rear flat roof ground floor extension and associated internal alterations. Flat roof front porch to integrate partial conversion to garage.
Garden shed with a canopy to be used for sunroom, gym area and storage.
The removal of the original lean-to porch roof & the addition of a single storey flat roof extension of c. 9 sq.m to the front (South) of the property. All internal & elevation alterations with 3 associated roof lights. The development will also include for the alteration of the original pedestrian access to the side (West) boundary & all associated site development & ancillary works.
The construction of a concrete block boundary wall to north boundary of the front garden.
Change of use from offices at first floor level to residential one bedroom apartment; reconfiguration of an existing layout to accommodate new apartment and a new private open space with 1.8m high timber screen on existing flat roof at first floor level and a new window and terrace door to the rear and side and all associated site development works.
370sqm side and rear extension, new entrance, and new facade to front elevation.
Demolition of the existing single-storey extension to the side. New two-storey extension to the side. With a side window on the first floor. Change and raise the roof profile of the existing porch to a parapet-new first-floor extension with change of main roof profile. Four Roof windows to the main roof area. Attic conversion for storage. New front window to the attic second floor. New shed to the front garden
The provision of alternate entrance and access arrangements from Crag Avenue to serve the permitted data storage centre, energy centre and substation development permitted under Reg. Ref. SD18A/0068, as amended by Reg. Ref. SD19A/0185 including the provision of ducted services connections between the permitted substation on site (permitted under Reg. Ref. SD18A/0068 as amended by Reg. Ref. SD19A/0185) and existing services to the south of the Grand Canal. The proposed ducted services connections will exit the permitted substation compound and run southward, crossing beneath the Grand Canal by way of a horizontal directional drill, before proceeding east and west to connect to existing services located to the south of the Grand Canal. This proposed development is also located on lands within the Grand Canal Corridor to the north of the R134 Regional Road, Clondalkin, Dublin 22.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Alterations to the elevations relating to planning number SD18A/0271 and as amended by further information received on the 19th December 2018.
Construction of a New 3-bedroom bungalow to the rear of existing dwelling and all associated siteworks.
Removal of two existing prefabricated classrooms and construction of a four classroom, two storey extension to the west of the existing school buildings, together with connections to services and all associated site works.
A new single storey front, side and rear extension with roof windows comprising of a den, utility room, living area, WC and kitchen. Convert attic to bedroom with new roof windows to front & rear of existing roof and all associated site works.
Change of use of existing 20 sq./m garage to habitable space and construction of a 27.7 sq./m single storey extension to the rear of existing dwelling.
Retention sought for the removal of the ground floor internal courtyard with canopy over as per Planning Ref SD013A/0047; Works to include, external canopy above roof level removed, new storage room created at first floor level; ground floor area incorporated into lounge area; permission for reduction in size of lounge floor area; works to include new entrance doors to Lounge area within building elevation facing car park; new external fire exit door from Lounge area to open space to rear of the building; internal walls forming snug demolished complete;Floor area included within lounge area; kitchen extension within part of previous Lounge area; relocation of Off Licence into previous Lounge area; entrance doors to Off Licence are previous entrance doors to lounge area; works to include new window to Off Licence within building elevation facing car park; change of use of previous Off Licence to takeaway; internal layout changes to lounge area public toilets; remove internal doors between Lounge area and entrance.
Planning Permission sought for: Change of use of part first floor from function room to aparthotel and construction of 2 new floors over first floor complete (at second and third floor levels) to provide aparthotel and ancillary accommodation. The total no of aparthotel rooms provided is 22. Existing roof over first floor to be removed complete to facilitate this development. Other works include: (1) Reduction in size of Ground Floor Lounge floor area to provide new separate stairs and lift to serve the aparthotel rooms on the first, new second and new third floors. External entrance doors to the stairs / lift area are the previous entrance doors to the Lounge area. (2) Internal alterations at ground and first floor levels to facilitate this development. (3) Roof garden accessed via the new stairs and lift. (4) Alterations to the existing building elevations finishes and (5) Connection to all services and all ancillary site development works to facilitate this development.
Change of use of part of existing convent building (Protected Structure Ref 158) from staff accommodation ancillary to the adjacent nursing home/retirement home permitted under SD18A/0328 to geriatric daycare centre (Ageing Well Centre) with all associated ancillary accommodation; internal alterations and improvements to the interior of the convent at ground, first and second floors; external alterations to accommodate 2 stair cores (one includes a lift) within the courtyard space and alterations to 2 existing windows to form escape doors and blocking up a 2nd floor window. Permission is also sought for all ancillary site and development works associated with the above.
Change of use of part of existing convent building (Protected Structure - Ref. 158) from staff accommodation ancillary to the adjacent nursing home/retirement home permitted under Ref. SD18A/0328 (ABP-304708-19) to community geriatric daycare centre (Ageing Well Centre) with all associated ancillary accommodation (1267sq.m); Internal alterations and improvements to the interior of the convent at ground, first and second floors; External alterations to accommodate two stair cores (one includes a lift) within the courtyard space and minor alterations to existing windows and doors to facilitate new escape routes; All ancillary site and development works associated.
Removal of existing side entrance porch; new single storey flat roof front extension to consist of a living room and study; two storey flat roof side extension to consist of an entrance porch and kitchen/dining room at ground floor and an en-suite/wardrobe at first floor; single storey rear flat roof extension to consist of a utility room and wc; rear first floor flat roof extension to consist of a bedroom; internal remodel and general upgrade of the main dwelling to suit the new proposed layouts; internal remodel and upgrade plus the construction of a new entrance porch to the existing family apartment to the rear of main dwelling. All structural, drainage and associated site works to be implemented.
Upgrading works to existing detached bungalow to include: alterations to existing external window and door fenestration; new external window openings; minor demolition works; new single storey extension to rear; new canopy to rear; new flush type roof light; internal reconfiguration; external landscaping; SuDS drainage and all associated ancillary works to facilitate the development.
The development proposed will supersede the permitted ICT Facility 4 under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158. A five-year planning permission is sought in respect of this proposed development. The proposed development comprises the following: • Construction of an ICT Facility Building (ICT Facility 4), with a Gross Floor Area (GFA) of 15,744 sq.m and a parapet height of c. 21.80m (with flues located at roof level, c. 4.5m over parapet height), over 3 no. levels, located in the southern portion of the wider landholding. This ICT Facility includes an associated external plant area of c. 1,796 sq.m over two levels, accommodating 22 no. emergency generators and associated flues. • The ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas and screened plant. • Construction of ancillary structures including a guard hut, fire hydrant water storage tanks, fire hydrant pump plantroom, water mist fire protection pump plantroom and water tanks, and cold water plantroom to the west of the proposed ICT Facility 4. • Construction of a revised internal road network and circulation areas to serve ICT Facility 4, footpaths, provision of 25 no. car parking spaces (including 2 no. disabled parking bays) and 18 no. cycle parking spaces within a bike shelter. • Lighting, boundary treatments and all ancillary and associated development (including the construction of an underground foul and storm water drainage network, and utility cables). • Hard and soft landscaping and planting, lighting, screening, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables. An EPA-Industrial Emissions Directive (IE) licence will be required to facilitate the operation of the proposed development.
Demolition of existing 3.3sq.m rear kitchen lean-too and construction of new 12sq.m ground floor extension with flat roof; construction of new 4.1sq.m first floor rear extension with pitched roof; internal alterations.
Side first floor extension for an additional bedroom; raise roof of single storey extension to the rear; two windows to the side of new first floor bedroom.
The Demolition of the Existing sub-standard porch and the demolition of the existing sub-standard single storey extension at rear and the Erection of a two storey extension to the front, side and rear and a single storey extension to the rear. Also the erection of a two car garage and garden tool store at the rear and the widening of the existing vehicular entrance.
Retention permission for 2 storey extension to rear of existing house, proposal for a new window to side of existing house all with associated ancillary works
Bungalow to rear of existing dwelling and all associated site works
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land adjacent to the Skatepark at Clondalkin Leisure Centre, Old Nangor Road, Clondalkin, Co Dublin.
Conversion of the attic space to a bedroom and ensuite. This will involve the construction of a dormered extension with two windows to the rear section of the existing roof.
Semi-detached two storey private dwelling adjoining existing two storey family home with all ancillary works.
Demolition of single storey Extensions to side and rear and construction of 2 storey Extension to side and rear. Single storey extensions to front and rear and alterations to front facade to include new feature gable at first floor level and all associated site development works.
(i) A Single-storey extension to the existing kitchen annex and (ii) A flat roof attic dormer extension. All works are to the rear of the house.
Erect an end of terrace two storey dwelling to the side of the existing dwelling and connect to existing services along with a new vehicular entrance to the front and new pedestrian access to the rear to serve the existing dwelling and widen the existing vehicular entrance to serve the new dwelling along with all associated site development works.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Ground floor rear extension with pitched roof over & 2 No roof lights over & ground floor extension with pitched roof over
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
For replacement of existing playing pitch with construction of an all-weather pitch with 1800mm high perimeter fence and walking path with 3 No. 12m high floodlighting columns with 3No.floodlights on each, associated additional 6 No. carparking spaces and ancillary site works.
One bedroom, two storey semi-detached house including associated hard and soft landscaping; off-street car parking; connection to existing public main sewers and boundary walls.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Planning Permission for (1) Construction of a two storey pitched roof side extension to the existing dwelling (2) Construction of a single storey flat roof rear extension to the existing dwelling and extending for the width of the two storey extension. (3) Works to the existing house (a) Internal alterations at ground and first floor level to facilitate the new extension (b) Alterations to existing ground floor window on the front elevation (4) Increased width vehicular entrance of the public road and (5) All necessary ancillary site development works to facilitate this development
Internal modifications and single storey extension to the existing classrooms and SEN Unit at the south west corner of the campus to provide additional SEN accommodation, including a single storey Resource Room Extension in the south east corner.
Demolish part of the modern extension constructed at the southern end of the original school building in order to construct a new single storey extension to accommodate a unit for children with special needs; ancillary works will include modifications to the original classroom block and the provision of new car parking spaces in the western forecourt area.