(a) Construction of a 4 storey nursing home building consisting of: (i) 106 bedrooms (with ensuite); (ii) associated residents welfare facilities; (iii) administration areas and staff facilities; (iv) multi-function space and pharmacy proposed at ground level; (b) construction of 60 one bed independent living units in 3 blocks as follows: (1) Block A, a 4 storey building comprising 11 one-bed units; (2) Block B, a part 4/part 5 storey building comprising 35 one-bed units; and (3) Block C, a 5 storey building comprising 14 one-bed unit. Each unit will be provided with a private open space in the form of a balcony terrace (6sq.m.) (c) The development will include communal open space and landscaping (including new tree planting and tree retention), 30 car park spaces (including 3 limited mobility parking spaces; 3 EV parking and 1 car sharing spaces); and 52 bicycle parking spaces (d) The development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall. Material from the removed wall will be repurposed within the landscape areas; and (e) The development includes landscaping, boundary treatments (including wells and railings to southern and western boundaries), and ESB Substation SuDs drainage, road infrastructure and all ancillary site works necessary to facilitate the development.
(a) Construction of a 5 storey nursing home building consisting of (i) 112 bedroom (with en-suite); (ii) associated resident's welfare facilities; (iii) administration areas and staff facilities; (iv) with day centre, and pharmacy proposed at ground floor level; (b) construction of a part 5/part 6 storey building consisting of (i) 108 one-bedroom/two-person independent living units for older people; (ii) social and activity areas; (iii) management office and (iv) 5 guest bedrooms, each unit will be provided with private open space in the form of a balcony/terrace (ranging from 5sq.m to 12sq.m); (c) communal open space and landscaping (including new tree planting and tree retention), 30 car parking spaces and 86 bicycle parking spaces; (d) the development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall; (e) landscaping, boundary treatments (including walls and railings to southern and western boundaries), an ESB Substation, SuDS drainage; road infrastructure and all ancillary site works necessary to facilitate the development.
Alterations to nursing home element previously approved under Reg. Ref. SD22A/0035 comprising: (i) The omission of the permitted nursing home pharmacy unit and internal void spaces to facilitate the inclusion of additional staff and IT facilities; (ii) revision of staff accommodation including additional office space; (iii) provision of Quiet Rooms on all floors; (iv) revisions to lift locations; (v) the provision of an external bin store; (vi) the 4-storey extension to the western and northern wings of the Nursing Home Building to facilitate: (a) additional staircase; (b) laundry rooms; (c) bulk storage room; (d) increase in bedroom quantum from 106 to 120 (including bariatric standard bedrooms with ensuite accommodation on all upper floors); and (e) the relocation of plant room; (vii) the addition of 2 no. EV parking spaces in lieu of 2 no. standard car parking spaces to bring the total number to 5 no. EV points (the total number of car parking spaces remains as permitted at 24 no. spaces); (viii) the increase in bicycle parking provision to 20 no. spaces to serve the nursing home; (ix) amendments to windows/glazing to correspond with internal modifications; (x) all site works and landscaping necessary to facilitate the development. No works are proposed in relation to the approved Independent Living Units.
Front entrance porch.
Proposed 18m Multi-operator Streetpole Solution and ground equipment cabinet
New 2 storey detached 3 bedroom house
(i) Conversion of existing attic to non habitable storage use; (ii) provision of dormer window to the rear and all associated site works.
Two storey side extension (ridge height 6.71 metres) which consists of a ground floor kitchen and dining area, first floor consists of two bedrooms with one ensuite; new first floor window to the front of the existing house and new ground floor window to the rear of the existing house and associated site works.
The existing single-storey extension will be demolished, and a new single-storey extension will be added to the side of the main house, linking the two buildings. Second single-storey extension to the side of the linked building. Dormer window to the rear roof area of the new extension. New single-storey porch to the front.
Erection and installation of 124 photovoltaic solar panels with an area of 235.6sq.m (with average size of 1.9sq.m per panel) on the existing roofslope and all associated alterations to existing elevations, site and ancillary works.
Front porch and two storey extension to the side and rear of existing dwelling.
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
Change of use of existing single storey library to retail use with part off-licence at the former public library; demolition of the existing projecting entrance porch and alterations to the front elevation to provide shopfront glazing and signage.
Part two storey and part single storey extension to side and rear of dwelling with subsequent sub division of dwelling into 1 two storey, three bed dwelling (floor area 91.5sq.m) and 1 two storey four bed dwelling (floor area 152.30sq.m); re-instate front boundary wall incorporating 2 new vehicular entrances and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 3no. roof windows to the side and 2no. flat roof dormers to the side.
Single storey front extension to living room and hall; new tiled roof over existing garage to match roof over living room and hall; widening of vehicular entrance and all associated site works.
Conversion of existing attic space; modifications of existing roof structure to gable, raising existing gable wall, dormer to rear and new access stairs.
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
Single storey porch and kitchen extension to the front, convert existing garage to a study, erect a single storey extension to the rear and widen the existing vehicular entrance from 2.5 metres to 4.0 metres.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
(1) Change of use of the existing ground floor (411sq.m) and first floor (401sq.m) levels from previously granted Showroom/Warehouse storage under Reg. Ref. S01A/0173 and further extended under Reg. Ref. SD02A/0514 to office use. (2) Modifications to the front facade comprising the replacement of the main entrance doors at ground floor level with glazing to match the existing, the installation of a new window to match existing at first floor level and new signage (2sq.m). (3) Modifications to the rear facade comprising the replacement of the existing roller shutter at ground floor level with fixed curtain wall glazing to match existing and the installation of new fixed louvres to match existing at first floor level.
The installation of a new external door to the rear facade & internal alterations at ground floor.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window, First-floor extension to the rear.
A single storey extension to the front of dwelling house with pitched roof over with 2 roof lights, extending the front living and kitchen rooms with a new entrance door to the front of the dwelling house.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Construction of a first floor rear extension and all associated site works.
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24
Single storey extension with tiled roof to the front & first floor extension with a tiled roof over existing rear extension to the existing two storey end of terraced dwelling with alterations to existing rear extension tiled roof; new high level window in existing gable wall structure; internal alterations & associate site.
Retention permission for: Retention of roof over main Dwelling from previously approved proposed height of 8.0M to as built height 8.25M (reference of Grant of Permission SD22B/0261) to include continuation of this ridge line over as -yet to be constructed roof over previously approved 2 storey extension at 22A Main Street Tallaght Dublin 24
The development will consist of Demolition of existing garage to side and adjoining single storey outbuildings (Total 70sqm). Construction of a two-storey extension to side (Total 63sqm) to include ancillary works to existing roof. Provision of 02No. Bay-windows to front at ground and first floor (Total 2.8sqm). Open porch to front, Single Storey extension to rear (Total 70sqm) and all associated internal modifications. 2No. Single Storey outbuildings (Pool Room & Mechanical Plant) to rear garden (Total 112sqm). Widening of existing vehicular entrance, and all associated site works for the above
Permission is sought by Cleargate Limited for (1) retention of change of use from Cafe/Restaurant to wholesale outlet (25A - unit50sqm) (2) Retention of change of use of Cafe/restaurant to wholesale outlet (unit 25B - 63smq) and (3) Permission for change of use of cafe unit (unit 25 - 61sqm) to wholesale outlet and incorporation into Unit 25B at Fashion City, Ballymount Road Upper, Ballymount Road Upper, Ballymount Dublin 24.
A porch extension to front of existing, a single storey ground floor extension to rear of existing house, 2 bedrooms at proposed 1st floor Level, with windows to front and rear with dormer windows to sides with opaque glazing roofing with standing seam with black metal finish.
(I) Change of use of ground floor (1,002 sq.m gross) from wholesale light manufacturing uses for the clothing trade to light industrial with ancillary testing area (fitting rooms, club building workshop putting and chipping greens and fitting bays) for sports equipment manufacture and an area of display of golf equipment and clothing/accessories for wholesale, together with associated/ancillary reception area, refuse storage, bicycle parking (5 no. spaces) and circulation.(ii) Provision of a new first floor of 833 sq.m gross for use as light industrial use to facilitate electric buggy repair (428 sq.m) and staff canteen (75 sq.m), together with associated/ancillary circulation (iii) Provision of a new second floor of 810 sq.m gross for use as storage, including plant. (v) Minor amendments to roof to facilitate AOV's and air extract ducts (vi) 1 no. new non-illuminated sign of 20.2 sq.m on the south-west (rear) elevation and 1 no. illuminated (blacklit) sign at fascia level to the north-east elevation 2.15 sq.m.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Retention permission for increase in area of existing porch (increase of circa 2.5sqm), alterations to part of existing flat roof to mono-pitched roof with upgraded flat roof to side/rear of existing dwelling and all associated site works at 28a Main Road Tallaght Dublin 24 D24XF4W.
Ground floor partial side/front with porch, rear extension, partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation. internal modifications and associated site works.
Revision to existing permission (SD24B/0505W) Ground floor partial side/front with porch, rear extension, partial raising of roof ridge height and build-up of walls at front and rear to create attic conversion, (revised larger size) with dormer roof windows on both side roofs, and window at attic level in front & rear elevation, new home office/store to rear garden, internal modifications and associated site works.
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.