Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
Footbridge from car park of university campus to Airton Close.
Installation of new railing to front of building including pedestrian gate; installation of new access control system to car park; 2 new standalone illuminated identity signs; revisions to landscaping and associated site development and facilitating works.
A new two storey extension to the side and single storey extensions to the rear and front of the existing dwelling
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
(I) Change of use of ground floor (1,002 sq.m gross) from wholesale light manufacturing uses for the clothing trade to light industrial with ancillary testing area (fitting rooms, club building workshop putting and chipping greens and fitting bays) for sports equipment manufacture and an area of display of golf equipment and clothing/accessories for wholesale, together with associated/ancillary reception area, refuse storage, bicycle parking (5 no. spaces) and circulation.(ii) Provision of a new first floor of 833 sq.m gross for use as light industrial use to facilitate electric buggy repair (428 sq.m) and staff canteen (75 sq.m), together with associated/ancillary circulation (iii) Provision of a new second floor of 810 sq.m gross for use as storage, including plant. (v) Minor amendments to roof to facilitate AOV's and air extract ducts (vi) 1 no. new non-illuminated sign of 20.2 sq.m on the south-west (rear) elevation and 1 no. illuminated (blacklit) sign at fascia level to the north-east elevation 2.15 sq.m.
Permission for extension works to the front (14 sqm) and rear (21 sqm) side of the existing 2 storey house Including upgrades to the existing driveway, entrance and rear garden and all associated site works.
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
Permission is sought by Cleargate Limited for (1) retention of change of use from Cafe/Restaurant to wholesale outlet (25A - unit50sqm) (2) Retention of change of use of Cafe/restaurant to wholesale outlet (unit 25B - 63smq) and (3) Permission for change of use of cafe unit (unit 25 - 61sqm) to wholesale outlet and incorporation into Unit 25B at Fashion City, Ballymount Road Upper, Ballymount Road Upper, Ballymount Dublin 24.
Attic conversion with raised gable; dormer and single storey extension to the rear; side window with new gable; Two 'Velux' windows to the front.
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
Demolition of existing extension and construction of single storey extension and dormer to the rear of existing dwelling and Velux rooflights to front of existing dwelling
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window.
Planning permission for the first floor side extension over the existing ground floor garage with associated integration to the existing dwelling, internal alterations and site works
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
Single-storey, flat-roof front extension with two rooflights and a new side door at ground level.
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conversation of the side garage to habitable space with minor alterations to the front elevation, internal layout adjustments and all associated ancillary site works at 30 Bancroft Avenue Dublin 24, D24 XWE0.
Construction of a single storey extension to the side & rear of the existing two storey dwelling and all associated site works.
Retention Planning Application to carry out the following developments to a permitted storage warehouse (Planning Reg. No.'s SD22A/0104, SD21A/0214, SD15A/0254), located at M50 Business Park beside the M50 Ballymount Interchange. The development will consist of (1) Retention Permission for as constructed extended floor area to first floor level storage area (approx. 200 sqm). (2) Retention Permission for as constructed additional stair core (Stair 05) and revised location and layout to permitted stair core (Stair 04). (3) Retention Permission for omission of solid masonry / RC wall to undercroft at north-east elevation. (4) Retention Permission for inclusion of a new pedestrian door to existing building, adjacent to main entrance door to reception area.
Construct additional floors at third and fourth floor levels internally as modifications to a recently permitted development under SD21A/0214 - extension of an existing storage warehouse building.
Retention for as constructed extended floor areas to ground floor level reception area (approx. 38sq.m) and first floor level office areas (approx. 49sq.m). Permission to construct a new extension to the north-eastern corner of a permitted storage warehouse building together with associated external signage, site development works; provide additional storage space at second floor level only (approx. 2,198sq.m) and form an undercroft to the permitted access/entrance areas.
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.
Erect 525sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Planning permission is sought for alterations and extensions mainly a box dormer and 3 pitched dormer extensions to provide 3 no bedrooms, a sensory room and an upstairs bathroom and modification to the existing ground floor to turn the existing 3bed bungalow in to a 4 bed dormer with home office. The drainage arrangements will remain as they are and the new bathroom will simply tap in to the existing private drainage, the rainwater collection will remain unchanged & all ancillary works
The development will consist of an extension to existing garage premises, of approximately 90 sq. metres.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
The development will consist of: 1. Removal of the existing rear garden single shed. 2. Removal of front wall carport facade to accommodate the construction of a single storey, pitched roof extension, to consist of an entrance porch and hallway with new stairs. 3. Construction of a new single storey pitched roof rear extension to consist of a kitchen and dining room. 4. Partial raising of the existing roof ridge, front and rear gable walls, to accommodate a new attic conversion (to consist of a bedroom with en-suite) incorporating a tiled pitched roof, with flat roof dormer windows on both side elevations, and a new front facing gable window. 5. General remodel and upgrade of the existing house at all floor levels to accommodate the proposed works 6. All drainage, structural and associated site works.
The development will consist of 1. Demolition of the existing garage/carport wall attached to the existing house. 2. Construction of a single storey flat roof front extension to consist of a porch and utility Room. 3. Construction of a two storey rear extension with gable ended roof to consist of hall, Lounge/Play room, Master bedroom walk in wardrobe and ensuite on the ground floor and two bedrooms, office and bathroom on the first floor. 4 Construction of court yard in the ground floors proposed to the rear extension and the existing house. 5. General remodel and upgrade of the existing dwelling to suit the proposed layouts. 6. All drainage, structural and associated siteworks to be implemented
Demolition of attached garage and construction of a new one and a half storey dwelling; connection to main sewer and connection to all associated services.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Attic conversion for storage. Single storey front and rear extension. Widening of front vehicular access. Two Velux windows to the front roof area. Demolition of existing shed.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Permission sought for single storey extensions at front and rear including relocating the front entrance door from the front of the house to the side of the house, the removal of the existing front sitting room window canopy and the installation of 2 Velux rooflights to new rear extension roof and 2 Velux roof lights to existing roof
Attic conversion for storage with dormer window to the rear with 2 Velux windows to the front roof area. First-floor extension to the rear. Demolition of the existing shed to the rear and replacement with new shed with a pitched roof
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Infill two storey house and all associated site works.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Single storey front & side porch extension with tiled roof over, demolition of existing concrete roof over the existing side bedroom and replaced with new tiled roof with roof lights, conversion of attic space into study with a dormer roof window extension to the side of existing hipped roof. Dishing of public footpath verge & kerb. New permeable driveway paving. Retention of 4.3m wide driveway entrance and retention of single storey 34sq.m recreation room in rear garden and all associated site works.
Two storey side extension (ridge height 6.71 metres) which consists of a ground floor kitchen and dining area, first floor consists of two bedrooms with one ensuite; new first floor window to the front of the existing house and new ground floor window to the rear of the existing house and associated site works.
Ground floor rear extension with flat roof over & 3 no. roof lights over
(a) Construction of a 4 storey nursing home building consisting of: (i) 106 bedrooms (with ensuite); (ii) associated residents welfare facilities; (iii) administration areas and staff facilities; (iv) multi-function space and pharmacy proposed at ground level; (b) construction of 60 one bed independent living units in 3 blocks as follows: (1) Block A, a 4 storey building comprising 11 one-bed units; (2) Block B, a part 4/part 5 storey building comprising 35 one-bed units; and (3) Block C, a 5 storey building comprising 14 one-bed unit. Each unit will be provided with a private open space in the form of a balcony terrace (6sq.m.) (c) The development will include communal open space and landscaping (including new tree planting and tree retention), 30 car park spaces (including 3 limited mobility parking spaces; 3 EV parking and 1 car sharing spaces); and 52 bicycle parking spaces (d) The development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall. Material from the removed wall will be repurposed within the landscape areas; and (e) The development includes landscaping, boundary treatments (including wells and railings to southern and western boundaries), and ESB Substation SuDs drainage, road infrastructure and all ancillary site works necessary to facilitate the development.
(a) Construction of a 5 storey nursing home building consisting of (i) 112 bedroom (with en-suite); (ii) associated resident's welfare facilities; (iii) administration areas and staff facilities; (iv) with day centre, and pharmacy proposed at ground floor level; (b) construction of a part 5/part 6 storey building consisting of (i) 108 one-bedroom/two-person independent living units for older people; (ii) social and activity areas; (iii) management office and (iv) 5 guest bedrooms, each unit will be provided with private open space in the form of a balcony/terrace (ranging from 5sq.m to 12sq.m); (c) communal open space and landscaping (including new tree planting and tree retention), 30 car parking spaces and 86 bicycle parking spaces; (d) the development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall; (e) landscaping, boundary treatments (including walls and railings to southern and western boundaries), an ESB Substation, SuDS drainage; road infrastructure and all ancillary site works necessary to facilitate the development.