Change of use of the existing single storey double bay garage and store building to be used as a one bedroom dwelling with modifications to the front and side of the building to include new solar panels, windows and doors, communal pedestrian access and parking shared with the existing dwelling, reinstatement of boundary walls and pillars and all associated site works.
Remove section of existing grass margin and replace with a concrete apron, install accessible kerb and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath 21.0 metres east of existing bus stop pole with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
The development will consist of: • Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the northwestern side of the unit, a height restrictor / entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, • Provision of associated signage consisting of 2 no. directional signage, 1 no. order station, and 3 no. menu boards / advertisement signs; • Alterations to all elevations of the Costa Coffee unit, including the provision of new signage on all elevations; • Associated alterations to the existing car parking layout including the removal of 4 no. associated parking spaces, realignment of the pedestrian walkway and provision of a pedestrian crossing; • Alterations to the existing external bin storage unit • An increase of unit floor area of 8 sq.m; and • Alterations to landscaping, outdoor seating area, and all associated development.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and 'Dutch' hip and new access stairs.
Change of use of existing storage area over first floor level to ancillary office use (241 sq.m) to include revisions to front (east elevation) and side (north elevation) to provide for a new windows at second floor level and internal alterations to allow proposed second floor to be accessed.
Retention consisting of construction of a rooflight in the main roof to the front of the property; Permission consisting of construction of a dormer window in the main roof to the side of the property as well as the construction of a dormer window in the main roof to the rear of the property.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and Dutch hip, new access stairs and roof window to rear, and new quattro roof window detail to the rear of the house serving attic space.
Single storey extension to rear and side of existing dwelling.
Single storey extension to rear and side of existing dwelling.
2 four bedroom, semi-detached dormer bungalows.
Conversion of existing attic space comprising of modification of existing roof structure, side dormer with A-style roof c/w window; new access stairs and 2 roof windows to the rear.
Construction of single storey granny flat extension to the rear of existing dwelling comprising of living room, bedroom and bathroom.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
Retention of altered windows to front elevation at first floor and widened driveway, with width reduced to 3.6m
The development will consist of the change of use from a club function room and Kitchen to a restaurant with no material alterations being proposed
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Extension and refurbishment of existing two storey three bedroom semi-detached dwelling of 103sq.m consisting of: new reconfigured vehicular entrance with electric gate and additional permeable paving with new single storey ground floor front; side and rear extension of 44sq.m with lean-to pitched roof and roof lights; detached single storey home office of 11.5sq.m with new rear garden side access from Liffey Crescent with landscaping to remaining 25sq.m garden area; new internal stairs to converted attic store of 24sq.m with dormer window to gable roof and associated site works.
Extension and refurbishment to existing 2 storey, 3 bedroom semi-detached dwelling of 103sq.m; new reconfigured vehicular entrance with electric gate and additional permeable paving; new internal stairs to converted attic store of 24sq.m with dormer window to gable roof; associated site works.
To convert attic space to storage space with dormer window to the north facing roof elevation and 1 rooflight to the front west facing roof elevation and 2 rooflights to the rear elevation.
Construct dormer window to the front and rear of the existing property serving games room/domestic storage; conversion from hipped roof gable to straight roof gable and associated site works.
The development will consist of the construction of a new mezzanine floor to the warehouse area for storage use (641m2) and all associated site works.
Demolition of existing single storey dwelling, garage and sections of the north and east boundaries; Construction of a 3-storey building to accommodate 10 no. duplex apartments comprising 1 no. 1-bedroom unit, 4 no. 2-bedroom units and 5 no. 3-bedroom units, with associated terraces and balconies; New vehicular and pedestrian entrance from Newlands Road; 10 no. car parking spaces; Bicycle and bin stores; Landscaped communal and public open spaces and boundary treatments; All associated site works and services.
Kelland Homes Ltd. seeks permission for development, consisting of amendments to street design, and in compliance with condition no. 16(e) attached to planning permission Ref. SDZ22A/0010. The proposed development consists of the creation of an intimate local street/home zone and includes for all associated site development works, car parking, landscaping and public lighting etc., all on a site measuring c.0.15Ha, located at "Keepers Lock", Clonburris, Dublin 22, within the Clonburris Strategic Development Zone (SDZ). This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Conversion of attic space to play room and toilet to include construction of vertical extension to gable wall and reallignment of roof; construction of dormer to rear of dwelling; new internal stairs and associated works; all associated works required to construct the works.
Retention planning permission for single storey extension to side
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow conversion of attic as non-habitable storage space with roof window to rear roof all with associated ancillary works
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
The development will consist of altering the existing hip in the side of the main roof to a gable, the construction of a rooflight in the main roof to the front of the house and a window in the new gable at attic level.
Permission for the raising of the side gable to form a new dutch hip to the front, side and rear with a flat roof dormer also to the rear for the provision of a new attic conversion for home office/storage use to include an opaque window to the gable off the stairs located at the side
Single storey infill extension with new roof profile and a single storey detached shed with games room/gym for use as amenity space for the house to the rear.
Addition of two windows in the south facing gable elevation (one at ground floor and one at first floor level).
Planning permission for a 3 bedroom detached house, demolition of existing garage, extension to rear of existing house and all associated site development works.
Single storey rear extension plus attic conversion with dormer roof to rear roof slope plus two number Velux rooflights to front roof slope and all associated site works
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
(1) Construction of a 2 storey extension, area 63.9sq.m attached to the southwest side of the existing dwelling and projecting to the rear building line of the existing dwelling; (2) construction of a single storey porch extension to the front elevation; (3) reconfiguration and extension of the existing roof at the connection to the proposed roof to the extension; (4) reconfiguration of gable wall of existing dwelling; (5) all associated site development works.
Single storey extension to the side to allow for the provision of an additional bedroom with en-suite and home office space.
Alterations to previous approved planning application, Reg. Ref. SD15A/0105, consisting of: construction of a new single storey flat roof modular changing facilities (293sq.m) ancillary to the existing playing pitch; relocation of approved 38 carparking spaces and 2 coach parking bays from northern boundary to the eastern boundary adjacent to Cloverhill Road installation of new overhead flood lights; 3 new flag poles; continuation of previously permitted boundary wall and footpath (Reg. Ref. SD15A/010) extending along the south eastern boundary, with addition of new security fencing added to top of wall, all adjacent to Cloverhill Road; new entrance gates (accessed via the permitted entrance off Cloverhill Road); all associated boundary treatment, landscaping and ancillary works necessary to facilitate the development.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ22A0018 comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows: A) Reconfiguration of internal arrangement in Block E to allow for the replacement of 5 no. permitted 1 bedroom apartments with 5 no. 2 bedroom apartments at first floor to fifth floor levels within Block E (facing internal courtyard), and the replacement of 2 no. 1 bedroom apartments with 2 no. 2 bedroom apartments at ground floor level of Block G and H to result in an overall mix of 257 no. 1 bedroom apartments, 318 no. 2 bedroom apartments and 32 no. 3 bedroom apartments (no change to overall no. of permitted apartments) and all associated elevation changes; B) Reconfiguration and amendment to floor areas of retail/café/retail service units and associated alterations to internal podium level to result in an overall increase of c. 51 sq. m of Gross Floor Area (an overall increase from 1,150 sq. m to 1,201 sq. m), and all internal reconfigurations; C) Inclusion of green roof in place of pitched roof along portion of Block A (eastern block - no change to internal arrangements or profile fronting onto external street); D) Amendments to undercroft car parking arrangements to now provide 378 no. car parking spaces (compared to 385 no. car parking spaces permitted) and alterations to cycle parking in bike stores and surface spaces to now provide 1,620 no. cycle spaces (compared to 1,548 no. cycle spaces permitted) and all internal/external reconfigurations.
Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two room apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as follows: 1. The existing warehousing Unit 1 (existing total area 11,725m2, comprised of 8,526m2 warehouse area and 3,199m2 of two storey ancillary offices) is proposed to be subdivided into two units as follows: A. Unit 1A, 2,582m2 in total including redesigned ancillary offices on 2 floors with an overall area of 522m2 (note: existing two storey office will be reduced by the demolition of 259m2 first floor offices and change of use of part of ground floor office, 281m2, to warehousing space), with a resulting warehouse area of 2,060m2. B. Unit 1B, 8,116m2 in total including redesigned ancillary offices on 2 floors with an overall area of 568m2 (note: existing two storey office will be reduced by demolition of 768m2 first floor offices and change of use of part of ground floor office, 801m2, to warehousing space) with a resulting warehouse area of 7,548m2. Both of the above units to receive front/southern elevation upgrades and access improvements of HGV's entering the site through two improved existing entrance/exit locations, addition of 1 no. goods door to Unit 1A, addition of 4 no. dock leveller doors & 1 no. goods door to Unit 1B, removal of a disused sprinkler pumphouse/plant room & (167m2) and sprinkler tank (24m2, 7m high) to the rear of Unit 1B, associated elevational changes, drainage works including surface water swales, landscaping, rearranged car parking, provision of cycle parking and associated site development works. 2. Existing Unit 2 building area remains unaltered. 3. Existing Unit 3 with a total area of 4,995m2, proposed alterations will include existing warehouse office area (90sqm total over 3 locations) to be reduced to 42sqm by the demolition of 24m2 of first floor office and the change of use of 24sqm of part of ground floor office area to the warehousing area, and separately demolition of 147sqm of adjoined warehouse corridor resulting in 4,782m2 of warehouse area with the addition of a proposed new two storey adjoined ancillary office area extension of 358m2, with associated elevation works, ancillary cycle parking and adjusted car parking, addition of 2no. dock leveller doors & 1 no. goods door to the side/eastern elevation plus associated drainage works including surface water swales, landscaping and associated site development works.
Retention Permission for several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22. The items for which Retention Permission is sought are as follows: 1.Alterations at Unit 1, resulting in a total area of 10,153m2 (10,120m2 of warehouse area, and 33m2 of Staff Facilities Area) as follows: A.Omission of previously proposed subdivision of Unit 1 in two units (Unit 1A and Unit 1B), with no area change. B.Change of use of 276m2 of Ancillary Office Area and 236m2 of Staff Facilities Area to Warehouse Area (at Ground Floor) and removal of 545m2 of Ancillary Office and Staff Facilities Area (at First Floor) due to the omission of previously proposed 2 storey Ancillary Office for Unit 1A and Unit 1B and redesign of existing Plant Room area at North-western corner of Unit 1 to accommodate warehouse toilet block and IT room. 2.Alterations at Unit 3: change of use of 3m2 of Staff Facilities Area to Ancillary Office Area and 39m2 of Ancillary Office Area to Warehouse Area (at Ground Floor) and 3m2 of Ancillary Office Area to Staff Facilities Area (at First Floor), resulting in 5,182m2 (4,824m2 of warehouse area, 221m2 of Ancillary Office Area and 137m2 of Staff Facilities Area) due to the structural design arrangements at the Ancillary Office and demolition of 2No. existing warehouse offices. 3.Previously proposed existing internal roller door to be built up, now retained to provide a connection between Unit 1 and Unit 3. 4. Elevational changes, with no floor area changes, due to the above mentioned modifications, including: A.Addition of 3No. fire escape concrete steps and refugee area at Unit 1. B.Omission of 2No. personal doors at Unit 1. C.Relocation of 1No. level entry door at Unit 1 and, D.Omission of 1 dock leveller door due to the retention of existing level door and personnel door at Unit 3. 5.Associated site works including: A.Existing ancillary area at front elevation of Unit 1 is retained unaltered. B.Previously proposed HGV access at front elevation of Unit 1 now omitted due to the omission of the subdivision on Unit 1, HGV access is now at South-eastern corner of the site. C.Addition of fence and swinging gate for fire escape circulation at South-western corner of Unit 1 and omission of fire tender swinging gate at the rear of the site, between Unit 1 and Unit 3. D.Site works adjustments due to elevational changes. All other elements remain as per granted planning application Reg. Ref. SD24A/0015.
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window and 'Dutch' hip and new access stairs.
Detached gym and utility room with connection to all existing services.
One 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (north-facing) elevation of B&Q premises.
Permission sought for a 2.4-metre-high steel palisade fence and gate at south side of St. Oliver's Training Centre, Cloverhill Road, Dublin 22.
The installation of a 3.25 vent stack servicing the existing underground natural gas pressure reduction installation with all ancillary services and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window and 'Dutch' hip; new access stairs; 2 roof windows to the rear.
Temporary permission for the erection of 2 no. temporary advertising / information signs and 12 no. flags, on 2 no sites, both measuring 67 sq.m, located at (i) Fonthill Road (R113) roundabout, to the west of permitted development granted under Ref. SDZ22A/0010, and (ii) adjacent to the Ninth Lock Road, to the south-east of permitted development granted under Ref. SDZ22A/0010, all within the townland of Cappagh, Dublin 22. The proposed development is comprised of 2 no. advertising / information signs measuring approximately 6.0 m x 4.5 m, on metal structures of 2.4 m. in height. The 2 no. advertising / information signs will face: (i) southwest towards the Fonthill Road roundabout and, (ii) east towards the Ninth Lock Road. The 2 no. advertising / information signs will be accompanied with 12 no. advertising flags approx. 1.0 m x 3.5 m in length, supported by a 6.1 m steel flagpole. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015.
Attic conversion for storage use, including dormer windows to the front and rear; construction of a single-storey pitched roof extension with front-facing gable; and a single-storey flat roof extension to the rear.
Planning permission sought to extend the existing ridge line & roof tiles to form new dutch type roof structure; extend the existing gable structure up to soffit level with a window in the new gable structure; conversion of existing attic into a non-habitable area with ventilated rooflights in the existing rear tiled roof; internal alterations; External finishes to match existing