Replacement pitched roof over garage and courtyard; single storey utility, toilet and lobby extension to courtyard; single storey sunroom to the rear; single storey glazed porch to the front, at the Old Rectory, Belgard Road, Dublin 24
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Retention of alterations to previously approved planning application, Reg Ref No SD24B/0329 for 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch. The alterations include 1.Erect of 56.6 sqm single storey ground floor extension to the rear of the dwelling with four number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, and change the side extension window to a door with window and all associated works at 33 Tamarisk Way, kilnamanagh, Dublin 24. D24 VNX0.
The proposed development will consist of 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, 3) Erection of 16.8 sqm first floor extension to the side of the dwelling and alterations to the main roof profile, along with all associated site works.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window.
The installation of 1 no. 4.8m x 8m x 2.9m high, Garden Room to contain a Home Office/Study, A home/personal gym and shower in the rear garden finished externally in timber/metal cladding.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Construction of a new single storey extension to the front of existing dwelling comprising of living room extension and porch.
Extension, Change of Use and alterations to Kilnamanagh Shopping Centre; A two storey extension is proposed along the centre's eastern elevation (total GFA increase of 2,336sq.m); Change of Use of the first-floor retail area (last used by Dunnes Stores as textile sales space) which will be extended and subdivided to provide for two new non-retail, service units; Unit 1 will extend to c.1,411sq.m for use as a health centre and Unit 2 will extend to 790sq.m for use as a gym; Removal of condition 3 of PA Ref: SD06a/0095 to allow for the increased net sales area to allow for the increase in net comparison sales space at ground floor level; New entrance ramp and steps at the north of the extension; The southern lobby entrance into Dunnes Stores will be demolished and replaced with a new glazed lobby entrance; New walkway canopy generally on the north and south elevations; New ramped access next to existing pedestrian entrance steps on Mayberry Road; Reconfigure existing entrance to Treepark Road including revised parking layout generally around the east side of the building to allow for an adjusted, one-way, system around the centre; Car parking, as a result of the extension, will be reduced; Four electric vehicle parking spaces; Covered cycle parking; New enclosed service yard wall and gates to existing service area on the west side of the centre; New signage (including illumination) proposed to elevations including two Totem signs; Recladding on elevations. Additional landscaping treatment generally around the east side of the centre arising from the amendments to the car park. Landscaping works and all drainage works including SUDS measures; All other ancillary works to facilitate the development.
The development will consist of: 1. The change of use of part of the first floor from retail to gym use within a unit with a gross floor area of circa 790sqms; 2. Alterations to ground floor lobby entrance and steps; and 3. The installation of temporary wheelchair access ramp to the lobby entrance along the centre's eastern elevation. 4. Planning permission for a 24 hour gym; 5. Erect two new external signs, including manifestations to first floor windows. 6. Installation of bicycle parking.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.
Single storey side extension to existing two storey dwelling and all associated works.
Demolish existing single storey extension at rear; construct a single storey extension at rear; construct a receded porch for front door at garage to tie in with existing.
Construction of a single storey (staff room) extension to the front (southeast) of the school (including a rooflight); construction of a single storey classroom extension to the rear (northwest) of the school; All associated elevational changes, internal alterations, site, landscaping and ancillary works.
Attic conversion for storage with rear dormer window and a singlestorey front extension with sloped roof.
Alterations to the existing front facade of the existing industrial unit inclusive of external finishes; Proposed facade feature, new windows and new front door; Proposed internal alterations to existing floor plans; Alterations to existing parking lot to include 12 proposed parking spaces inclusive of 1 disabled parking and 2 EV charging point; Proposed new signage and freestanding signage to vehicular entrance inclusive of all associated siteworks.
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
New 2 storey detached 3 bedroom house
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
The installation of a 1.81m x 1.42m x 0.51m (H x W x D) gas pressure reduction unit with all ancillary services and associated site works.
Construction of a single storey extension to the rear of the existing dwelling to include kitchen and living areas; single storey extension of a previously approved garage conversion to align with the front wall of the dwelling and associated site works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Construction of an attic level dormer window with increased ridge height on existing house located to the rear roof plane and all associated site works.
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
Retention of change of use of existing detached single storey building to family unit. Permission for the construction of a single storey link extension from existing building to existing house, minor internal amendments to existing structure and all associated site works.
Retention of change of use of existing detached single storey building to family flat. Permission for the construction of a single storey link extension from existing building to existing house; installation of a ground floor side window in existing house; minor internal amendments to existing structure and all associated site works.
Construction of single storey garden room. Consisting of home office & gym & all associated site works.
Warehouse extension (circa 87sq.m) at rear.
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Retention of 3 first floor offices and a mezzanine floor for storage purposes; free standing detached steel framed; 7 bay open fronted shed at rear.
Divide existing dwelling into two separate houses; 1 four bedroom bungalow and 1 three bedroom, two storey dormer type house. The new house will incorporate a previously approved ground floor granny flat extension and first floor games room (Reg. Ref. SD10B/0218) and will involve raising the existing ridge/roof level by 300mm and fitting 4 'Velux' rooflights; off-street car parking to both houses will be provided by existing vehicular entrances; all at front and side.
Demolition of existing single storey garage wing; construction of a new house, No.1A adjoining the existing house with the addition of a rear extension and internal layout changes to No.1, along with an additional front driveway entrance and all associated site works.
1) the demolition of the existing single storey side garage and the construction of a single storey front, side & rear extension to the existing two storey detached dwelling, ancillary alterations to all elevations, demolition of existing chimneys and all associated site works, 2) the wrapping of the existing two storey dwelling with external insulation and ancillary alterations to all elevations 3) Widening of the existing vehicular entrance and all associated site works and 4) the increasing in height of a portion of the existing side boundary wall to 2.9m as measured from public footpath side and all associated site works
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site work.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached Dormer Bungalow in rear garden with partial 2 storey area, alterations to existing driveway, constriction of new vehicular entrance with partial dishing of kerbs & all ancillary site works
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Permission for retention for the application of external wall insulation on all facades of the dwelling, with indistinguishable rendered finish throughout all facades.