The development consists of the retention of a single story pavilion structure (floor area 203 sq.m) and will consist of two proposed acoustic lobbies (floor area 11.6 sq.m) at the rear of the existing premises. The use of the pavilion structure is ancillary to the existing bar and restaurant use on the site. Permanent permission is being sought for the pavilion structure.
Planning permission for the variation of Condition No. 2 of planning permission (An Coimisiún Pleanála Ref. ABP-320719-24, Planning Authority Ref. SD24A/0147W) at The Black Lion Public House (a Protected Structure),The application seeks permission for the controlled use of amplified sound, including live music, within the existing pavilion structure, while retaining its approved use as a beer garden ancillary to the existing public house/restaurant. The application is accompanied by an Acoustic Consultant's Report.
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of c. 5 m; Provision of a single storey over basement level powertrunk building (with a GFA of 932 sq.m and an overall height of c. 4.1 m) to the southeast of the proposed energy centre. Provision of a 3-storey over basement medium voltage / low voltage building (with a GFA of 3,161 sq.m and an overall height of c. 16.3 m) to the southwest of the proposed energy centre. Provision of 2 no. transformers adjacent to the substation constructed under Reg. Ref.: SD18A/0068, as amended by Reg. Ref.: SD19A/0185 (located to the southwest of the proposed energy centre). Provision of a guard hut with a GFA of 21 sq.m and with a height of c. 3.2m, to the west of the medium voltage / low voltage building. Provision of a Gas AGI (above-ground installation) to the southwest of the subject site within a fenced compound, accommodating a single storey control room building with a GFA of 10 sq.m and overall height of c. 3 m, a plant kiosk with a GFA of 17 sq.m and an overall height of c. 3 m, and a boiler house with a GFA of 13 sq.m and an overall height of c. 3m. Reorientation of permitted ICT Facility Building No. 4 to accommodate the revised energy centre layout (with no other change to this permitted building). Associated and ancillary alterations to the site layout relating to landscaping, parking (including 18 no. car parking spaces, and bicycle parking within a covered bicycle shelter to serve the energy centre) and roads layouts, lighting and services, boundary treatments, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development.
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
The Development will consist of a single storey extension (totalling 10.1 sqm) located in the rear garden of the existing house and will include minor modifications to the existing ground floor kitchen to facilitate access to the proposed extension. The development will also include associated site works with hard and soft landscaping to the rear garden to accommodate the extension.
(i) provision of a single-story extension (2.4m x 8.92m) to the front of the structure; (ii) internal works as follows: (a) plastering of internal walls with insulated lime plaster, (b) build-up of existing front window opes internally only on 1st floor level (maintaining window slats), and (c) internal layout revisions including the omission of existing partition walls/doors and provision of new partition walls at ground and first floor levels; (iii) restoration of roof slates with replacement where required. (iv) change of use of the structure from an ancillary storage building to guesthouse use to provide for 2 no. additional guesthouse suites, each inclusive of 1 no. bedroom, 1 no. living area and 1 no. bathroom; (v) The development includes all ancillary site works, inclusive of landscaping, tree-removal and drainage, necessary to facilitate the development. The proposed guesthouse will form part of the existing guesthouse use within Towerville and will result in a total of 9 no. guesthouse bedrooms provided on site. The subject building is within the curtilage of Towerville, a protected structure.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.
Change of use and amalgamation of Unit 24A with Dunnes Stores Cafe (units 25/26) to increase the cafe's size from 257sqm to 368sqm, including an extended mall seating area and all other associated site works/services
Semi-detached two storey private dwelling adjoining existing two storey family home with all ancillary works.
Construction of dormer extension to the rear; the rising of a section of the original roof by 600mm; 2 new windows to rear of existing roof; construction of a porch at the existing entrance to the house; installation of 10 Solar PV Panels (20sq.m) to the front of existing pitched roof.
Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
The development consists of a two storey rear extension with tiled roof, 2 bedrooms bathroom, roof lights, open plan ground floor living area with internal alterations and all associated site works.
Permission is sought for extension, conversion and alteration works comprising of a new single storey extension to the rear adjoining the existing garage, which is to be converted into habitable space accommodating a new living room, guest bedroom and ensuite; the upgrade and raising of the flat roof and parapet to the south, east and along the north facing shared side boundary wall, which looks to include 3 no. rooflights; including a new ramped entrance canopy to the front with a new external door and window replacing the existing garage door; including all associated internal alteration, removal, and ancillary works
Retention of raised illuminated signage to existing shopfront, and projecting illuminated signage. The property is within an Architectural Conservation Area.
Retention for change of use of existing ground floor hairdressing/beauty salon to retail unit
Single storey porch and enlargement of games room to front of house; Single storey kitchen extension to rear of house; Attic conversion for study room with projecting dormer window to rear of house and all associated site works.
Proposed material alterations/change of use of office accommodation to part of existing first floor level to (1) extension of existing medical centre (previously granted permission ref. no. SD15a/0327), (2) a new four bedroom self-contained apartment with own door access via existing office entrance door at ground floor level. The works will utilise existing connections to foul and surface water drainage but will include the provision of a new water supply to serve the proposed apartment and all site works associated with the proposals at Tower Road Shopping Centre, Tower Road, Clondalkin, Dublin 22.
Proposed material alterations of existing shop units known as unit 1 and unit 2, the proposed alterations will include for removal of the existing party wall between the units to create a single shop unit, together with replacement of the existing shop front to unit 2, provision of new signage and all associated works.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.
Change of use of existing 20 sq./m garage to habitable space and construction of a 27.7 sq./m single storey extension to the rear of existing dwelling.
Demolition of the existing dwelling known as 'San Guida' (225sq.m), ancillary garage (25sq.m), outbuilding (31sq.m) and garden walls; construction of a part 3 to part 4 storey apartment development (1,837sq.m) comprising 21 units (6 one bedroom and 15 two bedroom apartments) all with associated balconies/terraces; widening of the existing vehicular entrance along 'New Road'; 21 car parking spaces; bicycle parking; bin store, boundary treatments; hard and soft landscaping; plant; green roof; sub-station; lighting; solar photovoltaic panels and all other associated site works above and below ground.
Retention of the single storey garage / shed with flat roof in the rear garden of the existing dwelling and all ancillary works necessary to facilitate the development.
The Development will consist/consists of the construction of new single story flat roof porch to the front of the existing house and a single story roof extension to the side and rear of the house and garage to include new kitchen, Living dining space along with utility and WC. The application is to include internal alterations and upgrades and all ancillary site works drainage and landscaping as required.
Full demolition of existing two storey 463sq.m building to make way for future development, subject to future separate planning application.
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
Planning Permission sought for proposed two storey pitched roof extension to side (floor area = 12.17sq.m) with a proposed ridge height of 6.935m high, complete with first floor bedroom window to side/N.West elevation & 2no. 'velux' roof lights to front/S.West elevation together with associated site works
Attic conversion with projecting dormer window to rear roof and 2 no. velux windows to front roof, new study / storage facility, and all associated site works.
Replacement of 1 existing sign on the front elevation with individually mounted internally illuminated letters (sign A: 1855mm x 7250mm), the provision of a new signage panel (sign B: 1200mm x 6355mm); and the provision of a new fascia sign (sign C: 370mm x 4235mm) at the shared entrance/exit; the removal of the existing entrance lobby and reconfiguration of the existing exit lobby to provide for an enlarged internal entrance/exit; other minor elevational changes including the provision a new cladding treatment to the exiting parapet wall and a new glazed MOE door and all ancillary site services and site development works.
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Parking area to the front with dropped kerb for access; new folding wrought iron gates in keeping with the existing.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
Retention for Click and Collect signage in the existing Tesco car park; construction of a sheltered canopy (c. 35sq.m) in the existing car park for the purpose of providing 2 dedicated Click and Collect spaces for the existing Tesco store and all associated site development works.
Partial demolition and reconstruction of a 2 storey, corner extension to the rear; provision of a new flat roof with rooflight to this extension; demolition of the two storey extension at the centre of the back (east) of the house; construction of a new flat roofed two storey extension with roof lights; repairs to windows with replacements where necessary or appropriate; construction of single storey bay extension with pitched roof to the south elevation at lower ground floor/basement level; minor internal alterations, general refurbishment, provision of maintenance access to centre valley, addition of photovoltaic panels, repairs to plasterwork, increase in height of rear garden boundary wall to the north; outbuilding to the rear, internal alterations, roof repairs, new doors and window and general refurbishment; minor hard and soft landscaping works including parking area to the northeast; all ancillary site works above and below ground.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Social housing development consisting of 10 one bed units in a two to three storey apartment building, associated car parking and bicycle parking, bin store, water pump house, new vehicular access onto Old Nangor Road, new pedestrian access onto Old Nangor Road, landscaping, boundary treatments, public lighting and all associated site and engineering works necessary.
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
A social housing development comprising of 10 one bed units in a three storey apartment building, associated car parking and bicycle parking, bin store, new vehicular access onto Old Nangor Road, new pedestrian access to replace existing vehicular entrance, landscaping, boundary treatments and all associated site and engineering works necessary to facilitate the development.
Widening of driveway entrance. Rear flat roof ground floor extension and associated internal alterations. Flat roof front porch to integrate partial conversion to garage.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, transformers, and associated electrical equipment and plant. The primary fuel for the proposed back-up generators will be Hydrogenated Vegetable Oil (HVO). Permission for associated works including services connections, boundary treatments, lighting, and all ancillary works. Permission for reconfiguration of car parking spaces and the retention of 10 no. car parking spaces to the west of ICT Facility 3, resulting in an overall reduction of 8 no. car parking spaces. Retention permission for 4 no. existing water tanks with a total height of c.9.2m and an existing water processing building with a total height of c. 5.1m, located between ICT Facility 2 and ICT Facility 3. Retention permission for 1 no. sprinkler tank with an overall height of c. 8.1m and a single storey pump room with a total height of c. 3.2m to the north of ICT Facility 3. An EPA-Industrial Emissions Directive (IE) license is required to facilitate the operation of the proposed development.
Demolition of single storey detached shed to side and /rear and erection of a new 2 storey extension to side single storey extension to rear with internal modifications and associated site works.
Replace existing 18 metre telecommunications support structure (monopole design) previously granted under planning Ref. SD18A/0418 with a new 24 metre high structure (lattice structure design) carrying telecommunications equipment and ground level equipment cabin and fencing.
Construction of a New 3-bedroom bungalow to the rear of existing dwelling and all associated siteworks.
Retention permission for new sectional door; 5m high by 3.9m wide; to the south-east elevation of an existing building.
Change of use from offices at first floor level to residential one bedroom apartment; reconfiguration of an existing layout to accommodate new apartment and a new private open space with 1.8m high timber screen on existing flat roof at first floor level and a new window and terrace door to the rear and side and all associated site development works.