Extension at first floor level to front and (south) side elevations for a new bedroom ensuite bathroom including the extension of rear bedroom to the south side elevation. Construction of new gable wall at first floor level and alterations to the existing roof ridgeline to facilitate the new extension to include the demolition of the attic dormer structure. In addition to new roof windows to the south side and east rear elevations for the conversion of the attic space for a second floor level bedroom and home office space and all associated site works.
Extend the existing tiled roof & ridge tiles to form a new 'Dutch' type roof structure, extend existing gable wall up to soffit level with 3 new windows, new rooflight in existing front tiled roof, new single storey extension to the side of the existing two storey, semi-detached dwelling, new two storey extension to the rear, convert existing attic area into a non-habitable area, internal alterations, external finishes to match existing & associate site works.
Development consisting of extensions & alterations to existing semi-detached two storey dwelling house to include single storey flat & slopping roofed extensions to front, side and rear of dwelling, single storey extension to front to include extended front porch & new bay window to living room with new flat roof canopy over. Extension to side and rear to comprise new master bedroom, dressing room & ensuite to front & side, new utility & WC to rear, extended kitchen, dining & living area to rear and new covered external patio/deck area to rear. Works to include associated minor internal & external alterations to facilitate development including minor alterations and widening of existing front vehicular entrance to the site, associated drainage & landscaping works etc.
Double storey extension to gable end of house with single storey element to front of house; removal of existing chimney and jerkinhead roof and construction of an apex roof, to include the conversion of existing loft area incorporating new loft area, with velux windows to rear roof profile also all associated site works.
The development consists of adding a layer of external insulation to the elevations of the existing dwelling including brick slip finishes to match the existing brick finish on the dwelling. This is all together with associated site works.
Demolition of a one storey warehouse building (c.1,051.2sq.m) and site boundary wall and the construction of 11 three storey residential units; 11 three bed units ranging in size from c. 105.9 - 112.2sq.m all with associated private back gardens, balconies and terrace areas; vehicular and pedestrian access is proposed off the Lower Lucan Road via two entrance points; 17 car parking spaces (including 1 disabled); sheltered bicycle storage and bin storage at surface level; a central public open space area of c. 282sq.m with all boundary treatment and landscaping works as well as all associated site development works on an overall site of c. 0.242Ha.
Remove existing porch and replace with a new single storey garage to front of house; relocate front entrance door to side of new build and all associated site works.
Revisions to the previously granted planning application File Register Reference SD24b/0177 The omission of the previously granted attic dormer to the side of the property at attic level and the revision of the main roof configuration to provide for a new gable ended configuration. Revisions to the previously granted attic dormer to the rear of the property at attic level. All associated fenestration revisions and roof lights to the side and rear of the property, drainage and associated site works.
The development will consist of a) An attic conversion of the existing internal roof space. b) The provision of two new dormer windows and rooflights to the rear and side of the house respectively. C) All associated site works and internal revisions
The construction of a connecting passageway between the existing house and garage, the partial conversion of the existing garage, and the non-construction of parts of the design granted permission under planning Ref. SD02B/0490.
Attached garage converted to habitable space, to include new front window, modified window on side elevation and new door on side elevation
Retention for single storey extension to the right side and rear of our property.
To construct a single storey extension to the right side and rear of our property
The development will consist of an extension to the front of an existing house
Demolition of an existing storey detached dwelling (162sq.m) and associated out-buildings on site, and the construction of 8 2-storey (plus dormer level), 5 bedroom, detached houses, on a site area of 0.3ha. The proposed development also provides for all associated site development works, car parking, open spaces and landscaping. Proposed access to the development will be via the existing vehicular entrance gate on the Lucan-Newlands Road/Esker Hill at a site known as 'Clonbrone' on Lucan Newlands Road/ Esker Hill, Lucan.
Demolition of an existing two storey detached dwelling (162sq.m) and associated out-buildings on site and the construction of 7 two storey (plus dormer level); 5 bedroom houses comprised of 3 detached houses and 4 semi-detached houses on a site area of c. 0.3ha; all associated site development works, car parking, open spaces and landscaping etc; proposed access to the development will by via the existing vehicular entrance on the Lucan-Newlands Road / Esker Hill.
Attic conversion to non-habitable storage space with conversion of hip roof to gable to accommodate stairs to attic, roof windows to front roof, additional window to gable side with ancillary works.
The Development will consist of Demolition of the existing single storey extension to the rear. Construction of a part pitched part flat roof single storey to the rear including roof lights. Alterations to the windows openings to the rear 1st floors. All associated internal, site drainage, landscape and ancillary alterations.
The development will consist of the material change of use from office/storage unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, the removal of the existing mezzanine floor, the removal of 4nr existing windows and infilling to match existing cladding to the front and rear elevations at first floor level, the installation of 3nr new window openings to the rear elevation at ground floor level the infilling of existing structural opening to the front elevation with glazing and spandrel panelling, while retaining the existing internal roller shutter unit, the repositioning and widening of the main entrance door and the installation of a full-height fixed glazed unit to the front elevation, installation of manifestation signage to the front elevation door and glazing, the widening and lowering of the existing rear exit door and all associated site works.
The development will consist of the material change of use from office/storage to a unit for day services use, to enable the provision of services to people with intellectual disabilities. The removal of the existing mezzanine floor and the removal of the existing roller shutter unit and installation of new windows to the front and rear elevation, (d) the widening of the existing doors to the front and rear elevation. Removal and infilling of existing windows at high level to the front and rear elevation with the installation of manifestation signage to the front window and (g) all associated site works.
Attic conversion including a dormer window to the rear and change of side roof profile from hip roof to half 'Dutch' hip with raised side gable wall.
Permission is sought for proposed attic conversion and dormer window to the rear of the property to include bedroom, ensuite and all other associated site works
(a) Formation of a new vehicular, cycle and pedestrian entrance off Hermitage Gardens to the west of the site and two pedestrian/cycle entrances to the north of the site off the N4; (b) construction of a semi-basemen/full basement car park for 97 cars, bin and bicycle storage and plantrooms, with two-way access ramp; (c) construction of a 1.2m high (approximately) raised podium over the car park area; (d) a four-storey above podium apartment block containing 15 apartments; (e) a three-storey apartment block (A) containing 21 apartments and a 15.12sq.m substation at ground floor; (f) a three-storey apartment block (B) containing 21 apartments; (g) a twenty storey above podium apartment building containing 104 apartments, entrance lobby, communal facilities including work stations, meeting rooms, laundry and office and external podium level terrace; (h) 328 bicycle parking places dispersed throughout, underground rainwater retention tanks; hard and soft landscaping, including planted communal gardens and play areas; pedestrian and cycle access/egress only will be retained off the N4; the mix of the apartments will be as follows: 37 studio apartments, 42 1-bed apartments, 8 2-bedroom (3 person) apartments, 70 2-bedroom (4 person) apartments, 4 3-bed apartments; total number of apartments proposed is 161; 67% of the apartments will be dual aspect and all will have balconies or private open space; all buildings will have roof plantrooms, green roofs and photovoltaic panels.
Construction of a) a metal clad single-storey warehouse, of 3072 sq.m, 13.58m high to parapet at front and part of the sides, and 10.4m high to eaves and 12.9m high to the ridge at part of sides and rear; b) a single storey 2.9m high ESB substation of 14sqm; c) the widening of the existing vehicular/cycle entrance to The Fox hunter Public House, and the forming of a new vehicular/cycle exit to the north west corner of the site; d) the formation of pedestrian/cycle gate to Hermitage Gardens and pedestrian gate to Lucan Road, e) internal roads and pathways and all associated hard and soft landscaping, f) foul and surface drainage, including attenuation tanks; g) 18 carparking spaces and 16 bicycle spaces.
Attic conversion to bedroom with en-suite incorporating new dormer roof and windows to rear; single storey ground floor extension to rear and all associated site works.
The installation of new external steel racking to the existing materials yard (the racking is to be mounted on top of the existing concrete hard standings) and all associated site works
The Development will consist of the demolition of existing garage and the erection of one and a half story dwelling to the side of the existing Dwelling and all associated site works
Two storey extension (floor area 199sq.m) containing 1 classroom at ground floor level; 1 classroom and an assisted shower room at first floor level to the rear of existing two storey school building (floor area 2,767sq.m); new roof window to existing roof surface of adjacent stairwell, together with all associated site works.
Subdivision of an existing dwelling with family flat to form two independent dwellings; subdivision of the existing rear garden space; a porch extension and direct external access to front of newly created dwelling and associated site works.
Subdivision of site & existing dwelling (with an ancillary family flat) to form two independent dwellings (No. 11: a 4-bed two-storey dwelling with 2no. off-street car park spaces, and No. 11A: a single-bedroom single-storey dwelling with 1no. off-street car park space), involving internal and external alterations, landscaping and boundary treatments, a new vehicular entrance, together with a single-storey extension to front of No. 11A and all associated site development works.
A new two storey extension linked to the existing primary school consisting of a new 2 Classbase Special Educational Needs facility with ancillary accommodation on ground floor and additional teaching rooms to first floor. (total area 842sq.m); Associated ancillary siteworks to include revised carparking layout (total no. 31), the demolition of existing external & bin store with new external & bin store to be located near main entrance gate (total area 25.5sq.m), existing bicycle shelter to be relocated next to new external store with provision for additional bicycle spaces to be included and any accompanying landscaping works; The provision of 12sq.m of photovoltaic panels to extension roof.
Attic conversion Incorporating dormer extension to rear all associated site works.
Planning permission is sought for 1) conversion of existing attic to non-habitable study/storage space, 2) dormer window to rear, 3) change from hip to gable roof to the side with attic level obscure window, and 4) roof light to front slope of roof, and all associated site works.
Retention permission for a detached structure at rear of site, that includes within the structure a gym/utility area, laundry room, shower room and sensory room, with connection to existing services and all associated site works.
Provision of 4 new ground floor level windows in western side elevation.
Change of use of the existing light industrial/warehouse unit to a Chartered physiotherapist-led rehabilitation and gym facility. The proposed use will include one-to-one and small group physiotherapy-led rehabilitation and exercise services. No external alterations to the structure are proposed. All services will operate within the existing unit footprint and use existing parking and access arrangements.
Works to position a modular unit for habitable use, as ancillary accommodation, to the rear together with all associated site works.
Planning permission is sought for attic conversion, raising of gable end to change roof profile with dormer projecting window to rear, new study / storage room and all associated site works
Demolition of the existing side concrete shed and chimney stack; Construction of a double storey side extension & a single storey extension at rear and a dormer extension for storage; and rooflights at the front; widening the existing vehicular access; internal alterations & all associated site works.
The development will consist of demolition of existing shed, walls and ancillary structures, and construction of a new two storey dwelling and all associated site works
Two storey, three bedroom end of terrace house to side of existing house including alterations to existing boundaries for creation of a new vehicular access gate; adjustments to existing vehicular access gate and associated site works.
Planning Permission is sought for alteration/extension of the existing two-storey end of terrace house, comprising demolition of the existing rear bay window, and construction of a new single storey flat roof rear extension, with rooflights, and a new two-storey side extension, with Dutch-hipped pitched roof, modifications to the existing fenestration, plus associated internal alterations and site development, including provision of a new vehicular access gate from the roadway to the rear garden.
3 storey 6 apartment unit, 1 semi-detached unit and 1 detached unit including car and bicycle parking facilities, bins and landscaping with new entrance gate.
Shopfront alterations which comprise of fitting of new branded signage (after removal of existing signage/ or over existing signage) onto existing shopfront, replacement of existing ATM with new ATM (location retained); minor internal alterations to existing front banking hall to consist of new internal SSBM/ ATMs within new room.
Change of use from furniture shop and window shop/showroom to a multi-functional space to include a place of worship and community centre (with ancillary office space);Minor internal alterations to layouts and alterations to the elevations to facilitate the change of use; The provision of car parking spaces and bicycle spaces and; All associated landscaping and site development works. The subject site includes a Protected Structure (Steward's Crafts - Record No. 020).
The overall site includes a Protected Structure (Steward's Crafts - Record No. 020), Units 39-40, Hills Industrial Estates, Lower Lucan Road, Co. Dublin. The proposed development will consist of:- Change of use from gym to wholesale outlet and local shop;- Minor alterations to the elevations to facilitate the change of use;- The provision of car parking spaces, bicycle spaces and a loading bay for deliveries and;- All associated site development works.
Extended area to existing single storey extension to rear incorporating new playroom and extended kitchen; two new bedrooms over the first floor with internal alterations to house and all associated site and drainage works.
Erection of Solar Panels to the front and rear of the main pitched roof to the main house at 8 Larkfield Green, Ballyowen, Lucan, Co Dublin.
This development will consist of retention planning permission for domestic garage and all associated siteworks
Tá cead pleanála á lorg ag Coláiste Cols Life do chomharta saorsheasaimh ag an mbealach isteach chuig Coláiste Cois Life, Gleann an Ghrifín, Co Atha Cliath. Permission sought for a free standing sign at entrance to Coláiste Cois Life, Griffeen Glen Lucan Co Dublin