Retemtiomn of change of use from retail to food takeaway.
Change of use from office use to use as a health centre for the provision of medical and health services and associated development and works.
Change of use of the ground floor of Unit C, Citywest Shopping Centre from its permitted Office use (permitted under South Dublin County Council Reg. Ref. SD03A/0857), to a Health Centre - specifically for the provision of support services to persons with intellectual disabilities.
We, Palm grey Limited, intend to apply for development at Crough's Pub, Cookstown Road, Tallaght, Dublin 24. The development will consists of the change of use and refurbishment of the 2nd floor existing staff accommodation to proposed 2 No. 2 Bed Apartments.
Increase the floor area of existing staff accommodation and plant room by 218sq.m on the second floor; provision of 2 additional floors to provide 9 apartments, 6 one bed units and 3 two bed units resulting in a five storey building over basement; new lift and lobby area to the rear to service all five floors; new pedestrian entrance to the eastern boundary and provision of 11 bicycle parking spaces and bin store; all ancillary works necessary to facilitate the development.
Construction of a residential scheme comprising 421 units, offices, retail units x3 and residential amenity areas x2, within 9 blocks ranging in height from 1-13 storeys. The proposal will include 289 car parking spaces along with 650 cycle parking spaces. The development will provide public and communal open spaces throughout including a public plaza adjoining Fortunestown Luas stop. Provision of vehicular, pedestrian, and cyclist accesses to the site, including pedestrian bridge to the public park (under construction) to the east. The application includes for all landscaping, ESB substations, plant areas, bin storage, surface water attenuation and all other site development works, and site services required to facilitate the proposed development. The proposed development seeks to amend SHD permission ABP-302398 -18 (under construction to the west), replacing 32 permitted duplex apartments along with associated amendments to internal roads and open spaces. The current proposal also replaces permission SD16A/0078 previously granted on this site.
Amendments to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21) and Large Scale Residential Development (SDCC Ref. LRD23A/0007) to include a single storey plant area to the rear, beside the permitted cycle stores. The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block.
Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows: (A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area. (B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey. (C) 21 duplex apartments in 2 3-storey buildings. (D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores. (E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7). (F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths. (G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive. (H) Provision of surface water and underground attenuation and all ancillary site development work. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant SDCC Development Plan.
The development will consist of amendment to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit B (c.257.2 sq.m) has permission for commercial/retail use. The proposed amendment to Unit B consists of the incorporation of an off-licence area within the permitted retail unit (c.13.3 sq.m). The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block (on lands located north of the Luas red line and Fortunestown Luas stop.
Change of use of the existing ground floor from café to restaurant, combining hot food takeaway, online home delivery and restaurant use.
Conversion of attic space to non-habitable space with dormer to side of existing dwelling and all associated site works.
6 two storey, 3 bedroom semi-detached houses and all associated site works on a 0.19 hectare site bound by Silken Park to the north, an existing office development to the south, undeveloped residential zoned lands to the east and Kingswood Road to the west.
The development will consist of a change of use of a Children's Play Facility (established under SDCC Ref. SD17A/0301) at part ground and part first floor level of the existing Citywest Shopping Centre building together with associated internal works of conversion and refurbishment and the erection of a new second floor extension with sedum roof on top to provide a public library that is arrange over three floors, as follows: (i) Ground Floor - Internal alteration and conversion of the existing ground floor lobby (approx 92 sq.m GIA). The existing light and stair access will provide access to the two upper floors that will contain the main floorspace associated with the library; (ii) First Floor - Internal alteration and conversion of existing floorspace (approximately 906 sq.m GIA) to provide public library space with ancillary staff and welfare facilities together with circulation areas. Provision is also made for additional / new external ancillary plant to the rear terrace (approximately 71 sq.m) and PV panels; and (iii) Second Floor - Construction of a new second floor extension to provide approx. 635 sq.m of public library floorspace (GIA) together with a west facing outdoor roof terrace (of approximately 117 sq.m). Associated external works include the provision of 16 no. short stay bicycle parking spaces (8 no. Sheffield stands) and 2 no. secure long stay bicycle spaces.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Amendment to Unit A of Tramway Lane (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit A has permission for commercial / retail use. The proposed amendment is for change of use to Dentist. The development will also include a single storey plant area located to the rear / north side of the premises. The proposed amendment includes all associated site services and development works required to facilitate the proposed change of use.
Construction of a detached, three bedroom dwelling at the vacant garden plot to include dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off-street parking space and all associated site works.
Detached 2 bedroom dwelling at the vacant garden plot site including dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off street parking space and all associated site works.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Mixed use residential scheme (total GFA 26,929sq.m) comprising 6 blocks with balconies/terraces to be provided on all elevations at all levels for each block, to provide 290 apartment units and associated residential amenity facilities, a childcare facility, 4 retail units and 2 café/restaurant units. A total of 153 car parking spaces (including 2 car club spaces) are proposed at surface level and existing basement level of the Citywest Shopping Centre to serve the development to include the reallocation of 37 existing surface level spaces; 67 new surface level spaces and the reallocation of 49 spaces from commercial to residential use at existing basement level of the Citywest Shopping Centre.
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
The development will consist of a single storey rear extension to existing clubhouse. The structure will be of steel frame with external insulated cladding panels and all associated site works
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
Planning permission and retention permission for a Large-scale Residential Development (LRD) consisting of amendments to a Strategic Housing Development (SHD) permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref’s SD22A/0299 and SD22A/0422 at a site at Citywest Shopping Centre, Fortunestown, Dublin 24. The proposed amendments for which permission is sought, include the following: (i) External alterations to Block F, comprising the relocation of a plant room door at ground floor level from the south elevation to the northern elevation along with the relocation of balconies at the eastern end of the building at 2nd to 6th floor levels together with a reconfiguration of the design of the balconies; (ii) Omission of 3 no. permitted on-street bin stores and replacement of same with a single consolidated bin store near the south-western corner of the shopping centre, together with a reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net loss of 1 no. on-street car parking space in this area; (iii) alterations to the design and configuration of the permitted single storey staircore structure leading to the basement level that is situated at the south-eastern corner of the shopping centre. The amendments for which retention permission is sought, include the following: (iv) Alterations to the permitted siting, design and size of the permitted ESB Substation and Switchroom at Block D together with the reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net gain of 1 no. on-street car parking space in this area; and (v) Internal and external alterations to the layout, design and configuration of the permitted single storey plant room and associated ESB substation / switch rooms at the south-eastern corner of the shopping centre, together with a slight re-siting of the reconfigured plantroom structure. In the interest of clarity, it should be noted that the proposed amendments and amendments to be retained will not result in any change to the total number of residential dwellings permitted on site, or the total number of on-street car parking spaces, as previously permitted. A dedicated website has been set up for this LRD application which can be viewed at: www. Carrigmorewoodsamendment1.ie
Amendments to the residential development permitted under An Bord Pleanála Reference ABP-305556-19 comprising of the omission of a permitted vehicular access ramp from ground to basement level of the existing Citywest Shopping Centre along the southern elevation; The permitted entrance to the ramp is proposed to be replaced at surface level with 5 car parking spaces, with associated amendments to the parking layout, pedestrian paths and landscaping in the immediate vicinity; An increase in the area of a permitted surface to basement level circulation core in the south-eastern corner of the existing Citywest Shopping Centre (to incorporate a lift and revised stairwell design), together with associated amendments to pedestrian paths and landscaping in the immediate vicinity; The relocation of permitted demountable bollards further eastwards along a permitted roadway to the south-east of the Citywest Shopping Centre; The enlargement of a permitted hammerhead circulation area to the south-east of the Citywest Shopping Centre and the provision of a standalone ESB Substation to the south-east of Block D; These amendments are provided to reprove the operational efficiency of the vehicle circulation and parking arrangement to service the permitted apartment buildings and to meet the requirements of ESB to serve the site.
The development will consist of amendments to the Strategic Housing Development permitted under An Bord Pleanála Reference TA065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. blocks, the provision of roof plant at Blocks A, B, C and D, the provision of an ESB substation at Block O that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of Block E to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of ESB to serve the site. At Block A it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At Block B it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block C it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block D it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick ESB substation with LV switch room to the southwest of the Block D, and the ancillary relocation of 1 no. car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At Block E it is proposed to provide the following; 18 no. photovoltaic panels arranged in 3 no. rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged Plant Room (117.15 sqm}, ESB substation (13.6 sqm), a Generator Room (21.82 sqm}, and a Low Voltage (L V} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At Block F it is proposed to provide 18 no. photovoltaic panels arranged in 2 no. rows. These, and all associated site works including landscaping at a site of 2.9 hectares.
Attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic as non-habitable storage space with roof windows to front all with associated ancillary works.
Single storey domestic shed/workshop and all associated site works.
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
The development will consist of internal alterations to the existing retail units to facilitate an amalgamation of the units into a single unit of approximately 234 sq.m and a change of use of the amalgamated unit from its permitted Retail use(s) (under planning Ref. SD03A/0857), to a Sports Facility (Gym).
Retention consists of the construction of a rooflight in the main roof to the front of the property.
Proposed attic roof space conversion to attic bedroom with dormer window to front part of roof and 2 rooflights to rear part of roof with all associated internal and external alterations to dwelling house.
Retention of single storey flat roof side extension.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
For development comprising of an Attic conversion including a dormer roof and window to rear of house for the purpose of storage. The addition of a window to first floor to the rear elevation. Addition of two windows on the side elevation, one at first floor level and the other at attic level. Internal alterations to first floor layout to allow for the addition of staircase serving attic level, relocation of bathroom and addition of an ensuite. Storeroom relocated from the first floor to the attic level.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
The construction of a 31m2 shed in the rear garden to be used as a gym, and all associated site development works above and below ground.
Provision of a roof dormer to the rear of aspect of the roof.
Two storey 44sq.m extension to the rear accommodating a ground floor kitchen extension and new first floor bedroom with roof to be pitched; wall and roof finishes to match existing dwelling.
Extension to the side at first floor level only comprising a staircase from the rear first floor bedroom to attic level; the enclosure to the stairs to be 1m wide external with off-white T&G effect cedral cladding finish.
Construction of three 3 storey office buildings, with a total floor area of approx. 16,732sq.m. The proposed development also provides for plant rooms at roof level, all associated site development works, landscaping, café (57sq.m), bicycle parking, car parking at surface level, basement level & a two level podium car park in the north-east corner of the site incorporating shower & changing facilities (152sq.m), ESB substations & service plant, and bin storage, all on a site area of 3.74ha. The effect of the proposed development will be a modification to part of an extant permission under Reg.Ref. SD06A/0737 & SD06A/0737/EP. The proposed development also provides for 2 vehicular access points off Kingswood Road ( Old Naas Road) and 2 vehicular access points of Kingswood Avenue.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Roof dormer to the rear aspect of the roof and retention of the 'Velux' rooflight to the front aspect of the roof.
Conversion of an attic to a room with a flat dormer style roof.
Single storey extension to side of existing dwelling consisting of downstairs sanitary facilities and utility space circa 3.5sq.m and all associated site works.
A new two storey end of terrace dwelling house with concrete tiled roof and external finishes to match existing: new driveway and vehicular access: new dished section footpath for vehicular access and associated site works.
Planning Permission for the erection of a fully serviced detached dwelling house. All with associated and ancillary site works