to
to

Planning records

Showing 101-150 of 35,083 public records
Page 3 of 20
3438/20

PERMISSION & RETENTION: Permission and retention permission is sought for a period of 3 years for a temporary construction compound associated with the implementation of the planning permission granted under DCC Register Reference 2024/16 (ABP Ref. PL29N.246933), as amended, on a site of 4,456 sq.m and bounded by Hammond Lane, Church Street, Lincoln Lane and the Luas Red Line, Dublin 7. The development consists of the retention of stacked welfare and office cabins on the northern part of the site ranging in height from 5.09m to 8.08m, and stacked office and staff storage cabins located on the southern part of the site ranging in height from 2.57m to 5.29m; 1 no. security hut and 1 no. turnstile hut; (total floor area of 1489.7 sq.m); 4 no. fully sealed septic tanks; 4 no. hardcore parking areas accommodating 12 no. vehicles to the north of the site, 6 no. spaces in the centre of the site, and 22 no. spaces provided over 2 no. locations to the south of the site; 1 no. vehicular access to Hammond Lane; 1 no. pedestrian entrance to Lincoln Lane; 1 no. facade sample display area; and, all associated development and works. Permission is sought for development that will consist of: Stacked welfare and office cabins located to the centre of the site (height 5.17m) and; office cabins located to the south east of the site ranging in height from 2.65m to 5.19m (total cabin space floor area of 172 sq.m).

Hammond Lane, Smithfield, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted17 November 2020
4617/23

RETENTION: Permission for the installation of a new rooflight to the front of the existing two storey residential dwelling.

25, Ard Righ Road, Stoneybatter, Dublin 7Dublin City CouncilRetention Permission0 reasons0 conditions0.4 km away
Granted04 December 2023
4040/20

PROTECTED STRUCTURE: Change of use of St. Patrick's Tower from a vacant building to exhibition space and associated works. St. Patrick's Tower is located at the Digital Hub, Thomas Street, Dublin 8. Proposed works include necessary repairs and adaptation of the tower for public use including: 1. Proposed external works: gently sloping access ramps, pedestrian crossings, cobblestone area with benches to the front entrance area, removal of bars from existing ground floor window, replacement of damaged rear window with new louvred vent, new entrance doors, new illuminated signage. 2. Proposed internal works to ground and first floor only, necessary minor repairs to brickwork and repairs to internal roof of entrance lobby area, new floor finish throughout ground floor, new lightweight ceiling finish mounted to underside of existing concrete slab, surface mounted lighting and wiring, mechanical ventilation system with 4 new opes to concrete slab and localized plant on first floor slab, removal of non-historic existing timber stairs, with new fold-down access stairs provided in its place. New firestopping provided to inner side of historic brick partition wall.

Saint Patrick's Tower, The Digital Hub, Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted25 February 2021
2882/21

The development will consist of the temporary ancillary use of the permitted Student Accommodation for Tourist or Visitor Accommodation during the 2021/2022 academic term time (until the 31 May 2022). The principal permitted use during this academic term time, as Student Accommodation, will remain unchanged.

Ardcairn House, 8 Grangegorman Lower, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted28 July 2021
3218/20

The development will consist of the temporary ancillary use of the permitted Student Accommodation for Tourist or Visitor Accommodation during the 2020/2021 academic term time (until the 31st of May 2021). The principal permitted use during this academic term time, as Student Accommodation, will remain unchanged.

Ardcairn House, 8, Grangegorman Lower, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted12 October 2020
4152/24

Permission to erect 6 no.. telecommunication antennas and 3 No. dishes supported on 3 No. ballast mounted support frames with associated equipment at Ardcairn House, 8A Grangegorman Lower, Arran Quay, Dublin. D07W5F3.

Ardcairn House, 8A Grangegorman Lower, Arran Quay, Dublin, D07 W5F3Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted04 October 2024
4290/23

PROTECTED STRUCTURE: the development consists of amendment to the grant of permission Reg. Ref. 2354/20 for the change of use from offices to a tourist hostel. The amendments comprise the following: (i) the 3-storey rear extension is not to be constructed, (ii) the common room is now to be at entry level, the kitchen/dining located in the basement, (iii) the provision of a partition at third-floor level.

7 Arran Quay, Smithfield, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted04 October 2023
2354/20

PROTECTED STRUCTURE: Planning Permission at No. 7 Arran Quay, Smithfield, Dublin 7, a protected structure, for the following development: The change of use from office to use as a tourist hostel (22 guests): lowering of part of the basement level floor by 400mm: external steps from basement up to rear yard: refurbishment of the ground floor return with new window openings: a 3-storey rear extension (1st-3rd floor) accommodating new bathrooms with steel frame and timber cladding.

7, Arran Quay, Smithfield, Dublin, 7Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted16 October 2020
WEB2138/24

The development will consist of the demolition of existing single storey rear extension and construction of a one and two storey extension to rear with 3 no. rooflights, 1 no. rooflight to rear of existing main roof and 1 no. rooflight to front of existing main roof and all associated site works.

40, Sitric Road, Arbour Hill, Stoneybatter, Dublin 7, D07 T8P0Dublin City CouncilPermission0 reasons0 conditions0.4 km away
Granted11 November 2024
4029/24

The proposed development comprises site clearance works, including the demolition of all existing buildings /structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 3-; Part 4-; Part 6- and Part 7- storey Aparthotel building over basement level with a total Gross Floor Area (GIA) of 6,790 sq.m together with the formation of a new vehicular access ramp (with integrated bicycle lane) off Thomas Street leading to basement level. The basement level will accommodate 16 no. cycle parking spaces; staff changing-rooms/showers; a service yard and ancillary plant and storage rooms; waste/refuse storage; ancillary gym for hotel guests and ancillary kitchen. Ground floor level will accommodate a reception area (222.9 sq.m) and café (156.6 sq.m) accessed off Thomas Street, and an ESB sub-station and switchroom. Aparthotel rooms / suites are provided at first to fifth floor level (93 no. self-contained/self-catering units). At sixth floor level, a public bar / event space (257.5 sq.m) with south facing roof terrace is provided. Other site works include the provision of hard and soft landscaping measures to ancillary amenity spaces. The proposed building incorporates sustainable drainage measures that includes green roofs and underground attenuation tank. Screened plant is provided at rooftop level.

Site at Thomas Street, including No. 144 Thomas Street (the site is bounded by No. 143 Thomas Street, and Marshalsea Lane to the east and No's 151-156 Thomas Street to the west), Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Refused10 September 2024
WEB2472/24

PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482m2) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary parapet height of 15.15m and including 3 no. flues to a height of 23.65m (28.1m O.D) and external plant compound (72m2) containing transformer equipment. The overall GFA of the Energy Centre (2) Building is c. 788m2. A blue roof (for rainwater attenuation) is proposed at roof level. Construction of a two-storey Water Recovery Plant (WRP) Building with a primary parapet height of 17.35m containing WRP plant and ancillary staff facilities. The overall GFA of the WRP Building is 1,576m2. A blue roof is proposed at roof level. The Water Recovery Plant also includes the following external plant elements: External Equalisation Tank with height of 13.25m including external access stairway; 2 no. Biogas Scrubbers with a height of 6.3m above parapet level and 1 no. emergency flare at a height of 7.5m above parapet level. 2 no. anaerobic treatment tanks to a height of c. 21m above ground level and external odour control plant. Aerobic treatment aeration tank to a height of 12.04m (+17.33 O.D.) with external access stairway, external renewable Biogas Balloon, other external items including ancillary plant / equipment, enclosing bund walls and circulation infrastructure. Demolition and removal of the former Flaking Plant (c. 46m / 11 storey equivalent in height) located centrally within the site (3,001m2), 1 no. two-storey prefabricated building, 1 no. single storey electrical distribution room, 6 no. single storey cabins / containers, vehicular concrete ramp and section of steel pipe bridge structure (691m2). Construction of a Utilities Hub comprising a proposed split-level building comprising a single storey structure (at lower ground level) ranging in height from 4.2m to 9.2m containing heat pumps, workshop, staff accommodation and ancillary plant, and a single-storey structure (at upper ground level) for use as Energy Centre (1) containing electrical boiler room to a height to parapet level of 8.72m, 2 no. flues to a height of 17.22m above upper ground level and including external plant compounds containing transformer equipment at the upper ground level (258m2), and 3 no. external vessels 15m in height at lower ground level. A blue roof is proposed at roof level. External stairs, ancillary site works, hard and soft landscaping are proposed. The Utilities Hub will comprise a GFA of c. 1,996.2m2. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. An additional 26 no. bicycle parking spaces are proposed. The application site is located in the curtilage of a number of Protected Structures. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).

Guiness Brewery, bounded by James's Street, Victoria Quay, Watling Street and Steevens Lane, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted14 January 2025
4374/22

PROTECTED STRUCTURE: Permission is sought for the demolition of the existing 2-storey return and single storey structure at the rear containing 3 residential units, and the construction of 5 no. 2-storey dwellings consisting of 3 no. 2 bed, and 1 no 1 bed townhouses in one block and 1 no. 1 bed 2 storey residential unit attached to existing front building, including minor internal alterations to the existing retained building at the junction with the new structure; associated site works and retention of existing boundary walls, all on a site of 0.047 Ha.

9, Manor Street, Stoneybatter, Dublin 7, DO7 FY99Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted10 October 2022
WEB1575/24

Permission for construction of a first floor extension to rear of existing dwelling, conversion of attic space to storage area, internal alterations to existing layout and all ancillary site development works.

36, Sitric Road/Mount Temple Road, Stoneybaatter, Dublin 7, D07 C6KTDublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted04 July 2024
3717/24

The erection of new signage consisting of: - 2 no. high level horizontal signs (3.4m x 0.8m) on Oliver Bond Street and Saint Augustine Street elevations. - 2 no. horizontal signs on fascia board (6.3m x 0.5m and 6.6m x 0.5m) on Oliver Bond Street and above the main entrance on Saint Augustine Street; - 1 no. illuminated plaque (0.5m x 0.5m) located at the main entrance on Saint Augustine Street; - Vinyl graphic detail applied to glazing on the main entrance door on Saint Augustine Street; - 1 no. high level sign fixed to a back panel (3.4m x 3.2m) on the northern elevation, facing Usher's Quay; - All of the above signage will have internal LED illumination.

42-76 Saint Augustine Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted12 July 2024
3584/21

The proposed development comprises a new single storey extension to an existing beer processing facility with plant at roof level. The proposed extension has a total GFA of c.84 sq.m and an overall building height, including the plant area, of c.19.14m (c.24.34m OD). The extension has a flat roof with a small plant area (c. 24sq.m) screened by metal cladding panels and supportive steel frames. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. There will also be associated drainage connections to be made and an enclosed new stair housing is to be provided to allow access to the new first roof extension from the existing beer processing area to the west side of the new extension and all other associated works. The proposed development is located centrally within the brewery and is screened by existing tanks and brewing infrastructure to the south taking into consideration potential views from James's Street. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Diageo Brewery bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted22 November 2021
WEB6021/25

Happy Hand Ltd intend to apply for continued planning permission for 3 years for a temporary café/retail unit on a section of derelict land located at 161-163 Thomas Street, Dublin 8. The development consists of two converted shipping containers, single storey in height. The development is situated on unused land in The Digital Hub complex. We have operated on this site for over 8 years already.

161 - 163 Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted19 February 2026
4685/19

Planning permission for the continued use of the current structure as a cafe/retail unit as granted under Registration Ref. No. 4085/16, 3 year temporary permission at 161 Thomas Street, Dublin 8. The development consists of two converted shipping containers, single storey in height.

161, Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted11 February 2020
3695/24

PROTECTED STRUCTURE: For development on this site at Nos. 3-4 Usher's Quay, Dublin 8 (D08 VOF9 and D08 N9YV) (Protected Structures RPS Ref. Nos. 8199 and 8200). The development will consist of the replacement of a 6.6m x 7.7m conventional advertising poster (including a 150mm wide frame and 1.25m apron) (i.e. 50.82 sq m) with overhead lights having an overall height of 10.95m off the ground, by the erection of a 5m x 7m digital advertising display unit (including a 100mm wide frame) (i.e. 35 sq m) without overhead lights, and with an overall height of 11.5m off the ground, on the side (east) elevation of No. 3 Usher's Quay (D08 VOF9) (i.e. the 'host wall' to Lower Bridge Street, Dublin 8, on the corner with Usher's Quay, Dublin 8). If granted, in accordance with Section 1.0 of Appendix 17 (i.e. the Outdoor Advertising Strategy 'bartering' system) of the Dublin City Development Plan 2022-2028, the permission would be on the basis of removing and decommissioning the 2 No. 48-sheet advertising displays on the gable wall of No. 145 Parnell Street, Dublin 1, D01 W634 (a Protected Structure RPS No. 6433) (18.58 sq m each), together with 1 No. advertising display at No. 1A Fairview Strand, Fairview, Dublin 3, D03 HF95 (13.01 sq m).

Nos. 3-4 Usher's Quay, Dublin 8 (D08 VOF9 and D08 N9YV)Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted23 October 2024
4076/22

PROTECTED STRUCTURE: Replacement of a 6.4m x 7.7m conventional advertising poster (including 150mm wide frame all round and a 1.25m apron), with overhead lights and an overall height of 10.95m off the ground; with a 5.2m x 7.7m digital advertising display unit (with 200mm wide frame all round) without overhead lights, with an overall height of 12.2m off the ground, on the side (east) elevation to Lower Bridge Street, Dublin 8, on the corner with Usher's Quay, Dublin 8.

3-4, Usher's Quay, Dublin 8 (on the corner with Lower Bridge Street)Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Refused15 July 2022
4026/23

PROTECTED STRUCTURE: PERMISSION: For the change of use of existing 2 & 3 storey (over basement) former school building and split into new use of offices and residential apartments accommodation, also we wish to apply for planning permission for increasing the building height to permit the construction of stairwell and rooftop 35m2 communal amenity area, also and lowering of the existing basement floor level and include the construction of a new exterior staircase accessing the basement area (from Manor Street). The development to also include the demolition of the existing former 'stage' area, basement area & existing 3 storey elements & undertake new replacement building accommodation which will include the construction of a new three storey element with basement and communal rooftop amenity area extension to Manor Street facade. The development also to include for all new external elevational treatments (to all building facades), rooftop PV solar array, also undertake all necessary internal / external demolition & alterations works inclusive of all associated site work and ancillary accommodation. The New Development Accommodation to consist of: Basement Level: new exterior staircase access from Manor Street. Internally- new refuse store, 14 Bicycle parking spaces, Mechanical & Electrical plant rooms & Service lift. Ground Floor level:- two access doorways from Manor Street, new stairwells, passenger lift, office accommodation unit with toilet facilities and external private open space. First floor level:-new stairwells, passenger lift, mezzanine office area (forming part of ground floor office accommodation unit) service plant room area. Also 1 No. - One bedroom apartment unit with exterior private open space. Second Floor level: new stairwells, passenger lift, 2 no. Two bedroom apartment units with exterior private open space and 1 No. One bedroom apartment unit with exterior private open space. Also external access passageway. Third floor:- (the new additional rooftop level) new stairwell & lift and communal 35m2 amenity area. Also 24 panel rooftop PV solar array. The development is located at 12 Manor Street, Dublin 7. D07 TH59 The proposed development is located within the curtilage of a protected structure of 10 Manor Street, protected structure DCC 4872, NIAH Reg. No. 50070184.

12, Manor Street, Dublin 7, D07TH59Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted24 April 2024
3114/23

PERMESSION: PROTECTED STRUCTURE:Planning permission for the change of use of existing 2 & 3 storey (over basement) former school building and split into new use of offices and residential apartments accommodation, also we wish to apply for planning permission for the increasing the building height to permit the construction of a new addition building floor level, also and lowering of the existing basement floor level and include the construction of a new exterior staircase accessing the basement area (from Manor Street). The development to also include the demolition of the existing former 'stage' area, basement area & existing 3 storey elements & undertake new replacement building accommodation-which will include the construction of a new two storey cantilevered first & second floor levels extension to Manor Street facade. The development also to include for all new external elevational treatments (to all building facades), also undertake all necessary internal / external demolition & alterations works inclusive of all associated site work and ancillary accommodation. The New Development Accommodation to consist of: Basement Level:- new exterior staircase access from Manor Street. Internally-new refuse store, 14 Bicycle parking spaces, Mechanical & Electrical plant rooms & Service lift. Ground Floor level:- two access doorways from Manor Street, new stairwells, passanger lift, office accommodation unit with toilet facilities and external private open space. First floor level:- new stairwells, passanger lift, mezzanine office area(forming part of ground floor office accommodation unit) service plant room area. Also 1 No. -One bedroom apartment unit with exterior private open space. Second Floor level: new stairwells, passanger lift, two office units, toilet facilities. Also 1 No. -One bedroom apartment unit with exterior private open space. Third floor:-(the new addition floor level) new stairwell & lift. Also 2 No. -Two bedroom apartment units with exterior private open spaces and exterior access passageway. The proposed development is located within the curtilage of a protected structure of 10 Manor Street, protected structure DCC 4872, NIAH Reg. No. 50070184.

12, Manor Street, Dublin 7, D07 TH59Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Refused23 March 2023
WEB1948/25

PROTECTED STRUCTURE Planning permission is sought by Building Futures Limited for development at 134 Thomas Street West, Dublin 8, D08 T6 H9 (a Protected Structure RPS Ref. no. 8795). The development will consist of refurbishment of the first, second and third floors; Internal works proposed: (i) Upgrading of electrical and mechanical services to comply with current Building Regulations; (ii) Removal of temporary propping and stiffening of the existing suspended timber floors at first, second and third floor. (iii) Fire upgrade works of existing joisted timber floors at ground, first and second floor levels; (iv) Repair of existing stairs and handrail. (v) Repair and renewal of ceilings. (vi) Erection of new lightweight internal partitions. (vii) Fitting new 4 panelled, fire rated, internal doors. (viii) Refitting of existing bathroom and provision of new, and a kitchen. (ix) Repair of internal plaster. (x) Internal insulation of the external walls at first, second and third floors only, to be compatible with existing fabric. External works:(a) Removal on non original PVC windows to the front façade only at first, second and third floor and replacement with painted timber one over one sash windows; (b) Insulating existing felt flat roof and provision on AOV. (c) Upgrade to existing outshot off staircase to include insulated slate pitched roof and lightweight plastered insulated external walls;

134, Thomas Street West, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted24 June 2025
3043/20

Permission for change of use from retail unit to office use together with replacement glazed screen onto Church Street at Former Dowlings Pharmacy, Distillery Bulding, 145-151 Church St., Dublin 7.

Former Dowlings Pharmacy, The Distillery Building, 145-151 Church Street, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted10 September 2020
3263/23

PROTECTED STRUCTURE: Planning permission is sought for proposed development at an existing 2 storey terraced dwelling which is a protected structure. The development will consist of proposed external alterations to include: removal of existing sheds to rear, alterations to existing opes to rear at ground and first floor level, replacement of all non-original glazing, new extension to side and rear of existing return at ground floor level, alterations including new roof to existing rear garden shed for use as workshop. Internal alterations include: partial removal of internal walls and formation of new door opes at ground and first floor, provision of new partitions on ground and first floor, provision of internal wall insulation, replacement of existing non original floor at ground floor level of return, new en suite at first floor level, replacement of sanitary ware and kitchen fittings, replacement of services and general refurbishment and repairs as required to include all associated conservation and ancillary site works.

77, Manor Street, Dublin 7, D07 TF2XDublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted27 June 2023
WEB1808/25

PROTECTED STRUCTURE We, the Board of Management, St Paul's CBS Secondary School intend to apply for permission for alterations to previously approved reg. ref. 3237/23 from 3-storey to a 4-storey extension to east as follows:(a) Ground Level- minor alteration to extension entrance, bicycle racks location altered; (b) First Floor- Safe Base Classroom altered as Central Activity Space with Daily Living Skills Area, re arrangement of Multi Sensory Room and welfare facilities/storage; (c) New Second Floor-2 No. Safe Base Classrooms (inc. Quiet Spaces) and associated facilities; (d) New Raised Roof Area with secure external play areas (hard and soft), sensory garden, PV Panels area and plant room,(e) Vertical extension of existing western stairwell, alteration to elevations and all associated site works and services at St. Paul's CBS Secondary School, Brunswick Street North, Dublin 7, a Protected Structure (ref 997).

St Paul's CBS Secondary School, Edmund Rice Schools, North Brunswick Street, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted12 December 2025
3237/23

PROTECTED STRUCTURE: PERMISSION: For 3-storey extension to east as follows: a) ground level-alterations to vehicular access, revised parking layout and new stairs, lift and storage area; b) first floor-safebase classroom, multisensory room, office and activity room and associated facilities; c) second floor/roof area-secured external play areas (hard and soft) and sensory garden. Works include bicycle racks and all associated site works and services.

St. Paul's CBS Secondary School, Brunswick Street North, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted22 July 2023
3713/20

Planning permission for alterations to previously permitted apartment development comprising of total of 3 no. 1-bed and 3 no. 2-bed units over existing ground floor commercial units (Reg. Ref. 3474/18) to ensure compliance with current DCC apartment development space standards, including extensions to rear at 1st, 2nd & 3rd floor levels, new balconies to rear and associated internal and elevational alterations.

129, Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted14 January 2021
3208/23

RETENTION: Retention permission for alterations, as a result of revised site boundary, to ground floor commercial unit and bedrooms and storage areas of approved 1 Bed Apartments Nos. 1, 3 and 5 at First, Second and Third Floors of approved apartment development (Reg Ref 3713/20 and 3474/18) over existing ground floor commercial units and associated internal and elevational alterations.

129, Thomas Street, Dublin 8Dublin City CouncilRetention Permission0 reasons0 conditions0.5 km away
Granted06 April 2023
WEB1487/25

Planning Permission is sought for provision of new conservation type rooflight sitting within the plane of the existing front elevation roof and all associated site works to existing mid terraced house.

26 Manor Place, Stoneybatter, Dublin 7, D07E9C7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted02 May 2025
3908/22

PROTECTED STRUCTURE: Upgrade of existing timber gated entrance to new automated timber gate fronting James's Street. Upgrade of external rear escape stairs including additional handrails. The addition of a new shower room, toilet room alterations and first aid room, the provision of four new timber windows (including reinstatement of one existing blocked-up window ope) to replace existing at basement level. The addition of a security access hatch to an existing internal doorset, at ground floor level. Provision of new ground mounted air conditioning units and associated pipework to be attached to the side (west) and rear (north) facades to serve internal office at third floor and associated areas. And all associated works. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

98 James's Street, Dublin 8, D08 W5HWDublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted07 September 2022
4824/23

PROTECTED STRUCTURE (RPS: 8149): permission for development at 10-13 Thomas Street, Dublin 8, D08 PX8H, a protected structure (ref: 8149) in use as office space, to comprise the following: removal of non-original internal glazed screen and door at first floor level and replacement with a plasterboard-lined stud-wall with fire-rated flush door-set; removal of a section of original non-load bearing internal stud walling at second-floor level and the addition of a new plasterboard-lined stud-wall to create a new protected escape route; and the conversion of an existing timber sliding-sash window to a casement window.

10-13 Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted23 January 2024
3058/24

PROTECTED STRUCTURE: The development will consist of widening existing single door pedestrian entrance to double door arrangement in existing boundary wall exiting on to Kirwan Street. The above works to be completed within the curtilage of a protected structure (RPS Ref. No.: 4872).

Stanhope Street Primary School, Manor Street Dublin 7, (Bounded by Manor Street, Kirwan, Street and Grangegorman Lower, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted08 March 2024
4563/19

The development will consist of the demolition of an existing shed to the rear of the existing dwelling, facing Mary's Lane and the construction of a 2 storey 34m2 rear extension. The works to the extension will include the provision of a new lounge to ground floor, a new bedroom to the first floor and a 2.5m2 external courtyard on the ground floor. The extension is located to the rear of the existing property with the side facing Mary's Lane. The works will include landscaping and all ancillary site works to facilitate the development.

39, Church Street, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted15 April 2020
4104/21

The proposed development will consist of a new extension to the existing beer processing plant to include a two storey building and six processing tanks. The proposed two storey extension has a total GFA of c. 1,024 sq.m and a building height to parapet level pof c. 14.4 m (20.9m OD). The building will be accessed via ground level doors and serviced through roller shutter doors on the southern elevation. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. The extension has a flat roof with a small plant area (c. 24 sq.m) screened by metal cladding panels and supportive steel frames. Six processing tanks c.24.52m (30.47m OD) are proposed to the north of the proposed extension. These tanks will be smaller than but visually match the existing tanks on site to the east. There will also be associated drainage connections to be made. The proposed development is located centrally within the brewery and is in accordance with the continued use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Diageo Brewery, bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted18 February 2022
4958/22

PROTECTED STRUCTURE: The proposed development comprises a ten-year planning permission to provide a building for the Guinness archives on a 638 sqm site. The subject site is bound by Thomas Street to the north, the Crane Building to the east, and existing Brewery works to the west and south. The development includes works and developments to Arthur's House which is Protected Structure No. 8145; the demolition of its rear modern section; the demolition of the part of the Crane Building to its rear; and the construction of a new Archive Building contiguous with and linked to Arthur's House. The development includes: • Opening up existing blind windows and replacing other existing windows in a historically appropriate style; • The installation of an external steel escape stair from the basement front elevation and the insertion of a new gate in the railing to match the existing railing; • Internal re-ordering to include replacement with historically appropriate flooring, fireplaces and cornices; • The demolition of the 1964 internal dividing walls within Arthur's House; • The demolition of 506 sq. m. of buildings, including the rear 1964 section of Arthur's House and the part of the Crane Building to which this is attached; • The demolition of the rear modern exterior ramps, steps, railings and security building; • The construction of a 624 sqm archive building to the rear of Arthur's House; • New exterior works to include ramps and steps; and • All associated works above and below ground. Arthur's House is and will remain 17.26m in height over four storeys and comprises: basement, ground, first and second floors with the third floor in the loft space. The section of the Crane Building to the rear of Arthur's House proposed for demolition is 21.72m in height and comprises ground and four further floors and roof top plant. The height of the proposed four storey new building is 20.85m. The proposed development is located within a site which is the subject of an approved Industrial Emissions (IE) Licence (Ref. No. P0301-04).

Arthurs House, 1 Thomas Street, Dublin 8, D08 AX97Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted24 November 2022
4317/24

PROTECTED STRUCTURE permission for development at the Mission Office, 132 - 135 Church Street, Dublin 7, a two storey building and Protected Structure. The development will consist of internal alterations only, including the removal of non-original stud partitions and their replacement with new re-located partitions at ground floor level, and the replacement of an existing exhibition installation with an open plan office area at first floor level. At both floor levels, minor upgrade works required to achieve compliance with current building regulations standards.

The Mission Office, 132 - 135 Church Street, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted21 November 2024
WEB2684/24

The development will consist of: (1) Refurbishment works to existing Health Clinic and Medical Consultants' Suites to be comprised of changes to internal layout at ground floor level to provide 2 no. clinic and 4 no. Medical Consultant Suites (265 sqm), at first floor level to provide Medical Consultants' Suites (190sqm), and all associated elevational changes; (2) New accessible public side entrance with ramp and canopy; (3) Provision of waste storage facilities at ground floor level; (4) Removal of existing oil tank and replacement with external heat pump and associated plant at ground floor level; (5) Addition of new PV panel solar mounting system to existing roof; (6) And all associated ancillary site works and services.

Stanhope Centre, Grangegorman Lower, Dublin 7, D07 X8R6Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted16 April 2025
4114/21

The proposed development will consist of the demolition of an existing unused and derelict squash court and replacement with hardstanding. The space will be used for storage and general brewery use, ancillary to the overall use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

Diageo Brewery, bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted18 February 2022
GSDZ3710/24

PROTECTED STRUCTURE & RETENTION: We, the Grangegorman Development Agency and The Dept. of Education, intend to apply for Retention Permission for the following development to a site formerly occupied by the Dublin 7 Educate Together National School, Fitzwilliam Place North, Lower Grangegorman, Dublin 7, D07 PY50, and now to be occupied by An Cosan Grangegorrman Special School (i.e. lands to the south of The Lower House, Grangegorman, a Protected Structure) located within the overall Grangegorman Strategic Development Zone (SDZ), i) The temporary retention and use of the existing detached two-storey School building, for a period of a further 7 years, which was granted temporary permission originally under 4291/08, with the duration subsequently further extended under GSDZ3263/14, GSDZ3653/17 & GSDZ3092/21, ii) retention of internal alterations to the ground floor of the existing building to accommodate six SEN classrooms each with Quiet Spaces and Accessible WC'S, a new Assisted User Shower Room, a new Multi-Sensory Room, a new General Purpose Room, a new Life skills Room, a new Admin Office, new Principal's & Deputy Principal's Offices, a new Staff Room, a new First Aid Room, a new Meeting Room and ancillary Storerooms & WC's etc. (the first floor of the existing building is to remain unaltered leaving the building with a total of fourteen classrooms), iii) retention of a new glazed double-door with side screens in a new larger ope formed to the eastern elevation at ground floor level to the new GP Room, iv) retention of the re-landscaping of existing play spaces to provide new soft play areas with new play equipment, a new Sensory Garden & a relocated hard-landscaped basketball court etc., v) retention of new metal and timber fences and gates within the site to secure the new play spaces and to define new site boundaries with the Grangegorman TUD campus proper so as to cede parts of the site along the northern & western boundaries back to the Grangegorrman Development Agency, vi) retention of a new sliding metal vehicular gate set-back from the existing Fitzwilliam Place North entrance along the redefined western site boundary, (vii) retention of a new car-park area to the south-west of the existing building, to provide 14 no. car-spaces, replacing 16 existing car-spaces ceded back to the GDA along the northern site boundary, bringing the total number of spaces provided to the School to 27, to also include new car park site lighting, EV charging point etc., viii) the retention of two new bike shelter structures each providing parking for 8 no. bikes for a total bicycle parking provision of 16 no.bikes, ix) retention of a new Bin Store area comprising an enclosure of mesh metal fences and gates, x) the retention of four new external ramps, one new set of external steps and new external concrete paths around the reconfigured building to facilitate the new layout, xi) the retention of a new external steel canopy structure with polycarbonate mono-pitched roof outside the main entrance to the building. Sections of the site boundary wall forming the curtilage of the site, including the existing entrance archway from Fitzwilliam Place North and the existing gate piers & wall to Morning Star Avenue, are Protected Structures, (RPS Ref. No. 3289), but no works to these Protected Structures are proposed as part of this application.

An Cosan Grangegorman, (formerly the Dublin 7 Educate Together National School), Fitzwilliam Place North, Lower Grangegorman, Dublin 7, D07 PY50Dublin City CouncilRetention Permission0 reasons0 conditions0.5 km away
Granted19 December 2024
WEB5103/25

PROTECTED STRUCTURE: We, Foxfield Inns DAC, intend to apply for Permission for development at this site: 4/5 Parkgate Street, D08 K259, 12 Temple Street West, D07 T0C3, and the associated rear courtyard to the north and northwest (The site is bound by Parkgate Street to the south; Temple Street West to the east; residential development along Montpellier Hill to the north; 11 Temple Street West to the north, east and south; and 6 Parkgate Street (Protected Structure) to the west). The development will consist of: The change of use of 4/5 Parkgate Street (a four storey [three storey over partial basement] corner terraced building) from Ground Floor Public House and Lounge and upper floors Residential, to Hostel use; and the change of use of 12 Temple Street West (a four storey mid-terraced building) from Residential to Hostel use, to provide for 53-bed capacity over 10 bedrooms, with associated entrance hall, reception, dining area, lounge, public toilets and one ensuite accessible bedroom at ground floor level and 6 no. ensuite bedrooms to first and second floor level of the existing 4/5 Parkgate Street. 12 Temple Street West will comprise of a self-catering kitchen at ground floor level, with three ensuite bedrooms located on the existing first, second and third floors. The development will also include: 1. Replacement exit doors to Temple Street West elevation and rear door from No.12 Temple Street West at ground floor level. 2. Ground Floor extension to the rear/north of 5 Parkgate Street to facilitate toilets. 3. Demolition of the internal non-original timber partitions at ground floor level. 4. Provision of ensuites to first, second and third floor levels. 5. Installation of new building services, mechanical and electrical plumbing systems and all associated drainage and ancillary site works. 6. Provision of site works including external steps and bin enclosure in the existing rear courtyard and provision of soft landscaping and bike storage in the existing rear courtyard. 7. External works to the elevations including removal of existing external downpipes on the front/southern external elevation of 4/5 Parkgate Street and to the rear/western external elevation of 12 Temple Street West; and replacement windows to rear of 12 Temple Street West. 8. All other associated development and site works necessary to facilitate the development.

4/5 Parkgate Street, D08 K259, 12 Temple Street West, D07 T0C3 and the associated rear courtyard to the north and northwestDublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted17 December 2025
3987/21

PROTECTED STRUCTURE: The building is a protected structure and is located in an architectural conservation area. The proposed works include i. a change of use of the rear of the ground floor unit from home brewers centre to residential unit and ii. a two storey extension on the roof of the existing ground floor to the rear comprising of a residential unit on each floor.

118, Thomas Street, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Refused04 February 2022
GSDZ3092/21

RETENTION: PROTECTED STRUCTURE: Grangegorman Development Agency and the Department of Education and Skills intend to apply for temporary retention permission for development at a site comprising the Dublin 7 Educate Together National School, Fitzwilliam Place, Grangegorman Lower, Dublin 7, located within the Grangegorman Strategic Development Zone (SDZ). The development consists of the temporary retention and use of the existing Dublin 7 Educate Together National School which was granted temporary permission under 4291/08 and extended under GSDZ3263/14 and GSDZ3653/17. This application seeks to retain the temporary school for a further 3 years while the construction of the permanent school is ongoing. The temporary school comprises: 1) A two storey 16 classroom primary school of approx. 2284 sq.m (including all ancillary school accommodation/layout/storage); 2) 2 no. ball courts, a junior play area, a dedicated special needs play area, 32 no. surface car parking spaces, vehicular set down area, circulation/paths, bicycle stands, a 2.4m high paladin perimeter fence, associated landscaping/drainage works, bin storage and external temporary storage facilities (generally for the storage of sports equipment); and 3) Vehicular entrance and pedestrian access (including security alterations to associated gates) through the perimeter wall (a Protected Structure - RPS Ref. 3289) at Morning Star Avenue to provide adequate emergency access clearance (including the temporary removal, repair and reinstatement of the wall and pier at Morning Star Avenue).

Dublin 7 Educate Together National School, Fitzwilliam Place North, Lower Grangegorman, Dublin 7Dublin City CouncilRetention Permission0 reasons0 conditions0.5 km away
Granted27 August 2021
3436/21

The development will consist of the change of use from the existing Maureen’s newspaper agents into a café along with associated changes to the interior ground floor layout and front elevation.

Maureen's 57, Manor Place, Dublin 7, D07 KC80Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted08 April 2022
3629/21

The development will consist of an additional floor on the existing two storey structure to accommodate a two-bedroom residential apartment at first and second floor levels, with a balcony at second floor level facing Manor Place and associated improvements to an existing staircase at ground/first floor level and alterations and extension to the existing front elevation to Manor Place.

Maureen's 57 Manor Place, Dublin 7, D07KC80Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted26 November 2021
2189/21

Planning permission for development to amend a previously permitted student accommodation and cafe scheme (DCC Reg. Ref. 2990/14 ABP Reference PL29N.244466; DCC Reg. Ref. 4643/17; DCC Reg. Ref. 4644/17) on a site of 0.19 hectares at Nos. 27-31 Church Street, Dublin 7, D07 RR82. The proposed development will consist of the use of the permitted Student Accommodation for Tourist and Visitor Accommodation outside of academic term time only by the omission or modification of Condition No. 18 of Register Reference 2990/14 (ABP Reg. Ref. PL29N.244466) to make the permitted use consistent with the definition of student accommodation in the Planning and Development (Housing) and Residential Tenancies Act, 2016. The principal permitted use as student accommodation during academic term time will remain unchaged. No change is proposed to the permitted cafe (with ancillary takaway) and no works are proposed.

27-31, Church Street, Dublin 7, D07 RR82Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted01 April 2021
4416/22

The description of development is as follows: Removal of existing fence through the site and development of a Nitrogen Generation Plant to produce nitrogen enriched gas for use in the production of beer at a site located centrally within the brewery site. The development will include a lattice style cold box Instillation tower to a height of c. 26m, 2 no. cylindrical storage tanks to a height of c.21m and plant and machinery for the production of nitrogen including a cold box vaporiser installation, a warm end installation, a Lin pump cold box installation, an expander module, cold valves, ambient vaporisers, final control skid and all other associated works. A new fence around the proposed plant is also proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Diageo Brewery bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted31 August 2022
3902/22

Planning permission for the development consists of (a) permission for the removal and making good of the front terrace existing non-original balustrades on the south and west elevations, (b) permission for the erection of fixed glazed screens and glazed entrance door on the south, west and east elevations with a retractable canopy over the front terrace to be fixed to the existing facade providing a semi sheltered external dining area to the front of the existing restaurant.

73 Manor Street, Dublin 7, D07 R2N4Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted30 June 2022
4059/22

Installation of 6kWp (28 sqm) of photo-voltaic panels on the roof an existing building at St. Paul's CBS Secondary School at this site Brunswick Street North, Dublin 7.

Saint Paul's Cbs Secondary School, Brunswick Street North, Dublin 7, D07 VF57Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted19 July 2022
4269/22

Permission for the following works: Separation of the currently combined office unit into two separate units, change of use of Unit 6 from office to retail / coffee shop use and for associated signage alterations.

Unit 5-6, Kings Street Complex, 48-59, North King Street, Smithfield, Dublin 7Dublin City CouncilPermission0 reasons0 conditions0.5 km away
Granted05 December 2022
3224/20

Retention Permission for first floor extension to rear of existing house, extension increasing floor area for second bedroom with frosted windows and all associated site works.

16 Ivar Street, Stoneybatter, Dublin 7Dublin City CouncilRetention Permission0 reasons0 conditions0.5 km away
Granted12 October 2020
Showing 101-150 of 35,083
Page 3 of 20