RENOVATE AND EXTEND EXISTING COTTAGE, INSTALL AN EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
RETAIN CHANGES TO DWELLING HOUSE AND THE DEVELOPMENT PREVIOUSLY GRANTED UNDER P99/2825 AND P01/2601 AND TO COMPLETE THE DEVELOPMENT IN COMPLIANCE WITH THE CONDITIONS OF P01/2601Decision record indexed
(1) Construction of a new detached dwelling house, (2) Construction of a domestic garage, and(3) proposed effluent treatment system and percolation area with all associated site works at, Aghalusky, Sraheens, Balla, Co.MayoDecision record indexed
Renovate and extend the derelict cottage including: demolition of existing poorly constructed extension, rebuilding extension, restoration of historic roof pitch, addition of roof lights, off road parking for 2 cars, domestic sewage treatment plant and all associated worksDecision record indexed
Retention planning permission to retain concrete base and blockwork and for full planning permission to complete a domestic storage shedDecision record indexed
Upgrade works to improve water quality, comprising upgrade of raw water pumps, installation of equipment to improve process including a new flocculation tank, clarification tank, rapid gravity filters, UV reactor and associated pumps, and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Reservoir tank improvement including pump pipework mixer, and all associated ancillary works and associated engineering works including upgrade to pump house machinery. All works will be conducted within the existing GWS site and pumphouseDecision record indexed
Planning Permission to extend dwelling house and alter elevations, extend garage and alter elevations, construct office, upgrade foul treatment system, and relocate entrance all as per drawing documentation submitted together with all ancillary site works and servicesDecision record indexed
Portagh / Lehanagh, Mayo Abbey, Claremorris C0. Mayo
The development will consist of 1.) the renovation and extension of an existing cottage 2.) the demolition of existing shed and 3.) upgrading the septic tank and percolation area together with all ancillary site works.Decision record indexed
RETAIN EXISTING HOUSE AS CONSTRUCTED, CONSTRUCT AN EXTENSION, INCLUDING INSTALLATION OF A NEW SEPTIC TANK/WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
Renovation and extension of existing dwelling house to include (1) Demolition of existing turf shed and (2) Extension and renovation to the existing shed and all associated site works at Ballymackeogh, Mayo Abbey, Co.MayoDecision record indexed
DEMOLITION OF EXISTING SHED AND TO CONSTRUCT EXTENSIONS AND ALTERATIONS TO PRIVATE DWELLING HOUSE AND INSTALL A PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA TO REPLACE THE EXISTING SEPTIC TANK SYSTEM ALONG WIH ALL ASSOCIATED SERVICES.Decision record indexed
Ballymacloughlin Ballylogher Derryvoghy Coolaght, Tawnaghlahard & Murneen North, Co. Mayo
The amalgamation of the PBKS & Derryvoghys GWS's. Consisting of the installation of a 1.7km long, 90mm outside diameter interconnecting pipeline, replacement of circa 0.6km of an existing 3" diameter pipeline with a new 90mm OD section of pipeline, replacement of circa 1.6km of an existing 2" diameter pipeline with a new 63mm OD section of pipeline, replacement of circa 3.7km of an exisitng 2" diameter pipeline with a new 63mm OD section of pipeline. Constructon of a new booster station alongside the proposed interconnecting pipeline. Decommissioning of the replaced section of pipeline within DMA001, 004 & 005 of the Derryvoghy GWS, decommissioning of the existing Derryvoghy source and pumping station, and all associated site development works above and below ground including installation of all necessary valves and chambers. (A NIS will be submitted with the application)Decision record indexed
THE PART DEMOLITION OF THE EXISTING DWELLING HOUSE, THE CONSTRUCTION OF AN EXTENSION TO THE SOUTH (SIDE) AND EAST (REAR) INCLUDING A BASEMENT LEVEL AND ALTERATIONS TO ALL ELEVATIONS, ALL OF THE ABOVE TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
ALTERATIONS TO PREVIOUSLY APPROVED PLANNING PERMISSION, REFERENCE NO. P20282. THE ALTERATIONS PROVIDE FOR A CHANGE IN THE DESIGN OF THE EXTENSION AND ALTERATIONS TO THE PRIVATE DWELLING HOUSE THAT WAS PREVIOUSLY GRANTED FULL PLANNING AND PERMISSION IS BEING SOUGHT TO CONSTRUCT A PRIVATE DOMESTIC GARAGE ON THE SITE ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
Construction of a single storey rear extension to existing dwelling house, upgrading of the existing onsite wastewater treatment system and all ancillary worksDecision record indexed
Construction of a proposed new detached dwelling house, separate garage, shared entrance upgrade, new waste water treatment system, connections to site services and all associated site works and landscapingDecision record indexed
DEMOLISH EXISTING DWELLING HOUSE, SEPTIC TANK AND PERCOLATION AREA, CLOSE UP EXISTING ENTRANCE, CONSTRUCT DWELLING HOUSE, WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, ESTABLISH A NEW ENTRANCE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES.Decision record indexed
CONSTRUCT A NEW EXTENSION TO EXISTING DWELLING, TREATMENT SEPTIC TANK SYSTEM ALONG WITH CONSTRUCTION OF NEW GRANNY FLAT/GARAGE, ALSO RETENTION PERMISSION FOR THE EXISTING CABIN ON SITE WITH MODIFICATIONS TO EXISTING ELEVATIONS AND ALL ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF AN EXISTING SUBSTANDARD HOUSE, CONSTRUCTION OF A SINGLE NEW REPLACEMENT DWELLING, INSTALLATION OF A NEW TERTIARY EFFLEUNT TREATMENT SYSTEM AND GRAVEL PAD INFILTRATION AREA AND ALL ANCILLARY WORKSDecision record indexed
Construct a 4 bay slatted shed, retain agricultural storage shed, retain extension to existing slatted shed all as per drawing documents submitted together with all ancillary site works and servicesDecision record indexed
Refurbish derelict dwelling house to include alterations to plans and elevations and upgrade waste water treatment on site together with all ancillary site works and servicesDecision record indexed
The development will consist of the partial demolition and refurbishment of the existing farmhouse along with the construction of a proposed new two-storey extension to the rear and side, a proposed new front door entrance, separate garage, existing entrance upgrade, new wastewater treatment system, connections to site services, and all associated site works and landscaping.Decision record indexed
CONSTRUCT A MILKING PARLOUR INCORPORATING A DAIRY AND PLANT ROOM, CONSTRUCT A SLATTED SHED, CONSTRUCT AN EXTENSION TO EXISTING CUBLICLE SHED, TO ESTABLISH AND CONSTRUCT A NEW ENTRANCE, ALL AS PER DRAWING DOCUMENTS SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construct an extension to existing agricultural building which incorporates cubicles, a feeding area and a slatted tank, construct a silage slab, construct an overground slurry storage facility all as per drawing documents submitted together with all ancillary site works and servicesDecision record indexed
Construct extension to an existing dwelling house with minor elevational changes with new dormers and a new roof light, decommissioning of existing wastewater system and installaion of a new onsite wastewater treatment system and all ancillary worksDecision record indexed
Construct a dwelling house, domestic garage, septic tank and percolation area, together with all ancillary site works and servicesDecision record indexed
RETENTION OF EXISTING DOMESTIC GARAGE AS BUILT, RETENTION OF EXISTING DWELLING HOUSE AS BUILT, ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE ALONG WITH ANCILLARY SITE WORKSDecision record indexed
A) demolition of part of the existing dwelling house, b) construction of a single storey side and front extension to the remaining dwelling house, c) replacement of the existing septic tank with a new proprietary wastewater treatment system and d) all ancillary works on revised site boundariesDecision record indexed
Planning Permission for the change of use of our existing domestic garage into an Independent Living Unit including elevational changes and connection into existing septic tank, together with all associated site works and servicesDecision record indexed
Planning permission 1) for the demolition of existing domestic shed, 2) extension and alterations to existing dwelling house, 3) new site entrance 4) new wastewater treatment system and 5) to carry out all ancillary site worksDecision record indexed
Extend and renovate existing dwelling house including new site entrance and an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
Construct a new dwelling house and septic tank/proprietary effluent treatment system along with permission to demolish old piggery and construct a new storage shed which will be ancillary to the house together with all ancillary site works and servicesDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE AND FUEL STORE, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA ALONG WITH ASSOCIATED SITE WORKS.Decision record indexed