The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
To construct a two storey extension to the side of house consisting of a domestic garage and a bedroom
The development which will consist of demolition of 2 no semi detached single storey dwellings, change of use from residential to construction of new 2 storey community facility providing offices/admin/drop in service, social space, training, off street and on street parking, alterations to existing entrances, boundary walls and all ancillary works
For the change of use and minor façade alterations of Number 6 Thomas Street, Killaloe, Co Clare. The development will consist of the change of use of part of the ground floor from office use to coffee shop use with ancillary take away facility (coffee hatch), the provision of security gates within the existing archway, the provision of signage, lighting and paving, and all associated site services and works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
To erect an extension comprising accessible bedroom and WC to the rear of the house and all associated site works
For the following development for conversion of existing detached garage to a self-contained granny flat, connection to necessary services together with all associated ancillary and incidental site works
To construct a first floor extension over existing extension to the rear of building, remove chimneys, replace the roof with a fibre cement slate roof and replace all the windows with pvc double glazed windows
Of the following: an extension to the existing dwelling and the construction of a detached short term accommodation unit to the rear
Of the extension to the dwelling house as constructed and all associated site works
For the demolition of existing disused agricultural buildings and site clearance, construction of new two storey office building, car park area, connection to necessary services including reconfiguration of the existing life foul/storm connection, together with all associated ancillary and incidental site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
For alteration and refurbishment of the existing fire damaged elements to building which consisted of a public house on the ground floor and residential dwelling on the first floor also permission is being sought to demolish the out building at the rear of the site and construct a new dwelling in its place. The proposed alterations and refurbishment of the existing building consists of changing the ground floor from a Public House to a commercial unit c/w extension to the rear of the existing building and a studio apartment. The first floor and attic area will be renovated to comprise of a 3 bedroom apartment. The out building /shed to rear of the site will be demolished, A new single two storey detached dwelling will be constructed together with all ancillary site works in its place
For the reconstruction and refurbishment of existing fire damaged public house and its conversion into a ground floor commercial unit, ground floor studio apartment, 1st floor 1 bed apartment, 2nd floor one bed apartment, demolition of existing single storey rear annex, construction of new single storey extension to rear together with all associated ancillary and incidental site works
For extensions and alterations to the existing retail outlet, signage, elevational changes, the erection of a shopping trolley bay; along with all associated ancillary works
For change of use of coffee shop to it’s former use as a residence and associated site development works
To construct a workshop and storage together with associated site works at the rear of the house
For change of use of coffee shop to it’s former use as a residence and associated site development works
The project consists of the conservation works to the detached two storey, four bedroom, sandstone built deanery. Works to include; interior alterations, repair of original windows, repair or replacement of roof tiles and landscaping. The Deanery is a protected structure RPS No 445
To erect a dwelling house, entrance, connect to public services and all associated site works
For development which will consist of 1.) the demolition of part of the existing ground floor return to the rear, 2.) the construction of a new single storey extension to the rear, 3.) the addition of handrails at the front entrance door and, 4.) the widening of the existing vehicular entrance, including all associated site works above and below ground.
To RETAIN Pedestrian entrance to side of his house and all associated site works
Of as constructed extensions to the front and side of an existing domestic garage, (including the provision of a garden room), raising the ridge and eaves heights to provide a first floor loft storage space and forming a gable to the front and rear of the extended garage in lieu of hipped roofs
For change of use of a former takeaway premises to residential use and the removal of unsound extensions to the rear of the building, including all associated site works
For the construction of an en-suite classroom extension and a WC toilet along with a ball court and perimeter fence and all ancillary site works
To convert the attic space with associated changes to the elevations and erect an extension to the rear bedroom, kitchen over two floors and all associated site works
To erect a 3rd floor storage room and viewing deck to front, erect an extension to the rear comprising bedroom, kitchen and storage over 3 floors and alter height and shape of existing windows to front and rear and all associated site works
To (a) increase the ridge height of the existing building, (b) convert rear pitched roof to flat roof and (c) convert attic space to habitable master bedroom ancillary to 1st floor apartment and all associated site works
For changes to the front elevation and side elevation, change existing signage, changes to internal layout of office and all associated site works
For the demolition of an existing attached garage and the construction of a two storey extension to the side of an existing two storey house, alterations to the existing house and all associated site works
To construct a single storey extension to the side of the existing dwelling (Previously Granted Retention Permission, planning ref 25/60497) together with all associated ancillary and incidental site works
Of minor modifications to the elevations of the building previously granted planning permission under Ref. No. P21/212. Modifications include removal of two number windows on the west elevation, removal of external double door on the north elevation, removal of skylight on the lower north facing roof, retention of two number velux windows on the upper north facing roof, removal of a window on the east elevation and retention for the continued use of the building for residential purposes together with all associated ancillary and incidental site works
To A) construct a new dwelling house with attached garage, B) provision of a new site entrance, C) installation of an advanced waste-water treatment system D) all other associated site works
To construct a detached garage and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To A) Demolish existing dwelling house, detached garage and detached rear garden room. B) construct a new dwelling house and new detached rear garden room. C) Installation of an advanced wastewater treatment system, D) and all other associated site works all within revised site boundaries
To: 1) Construct a first floor rear / side extension. 2) Demolish existing rear sunroom. 3) Carry out extensive modifications to Front façade, including new slated roof, Dormer window and large Velux Roof lights. 4) Add new Outdoor Roof Terrace on flat roof section of new extension, with stairwell access to the rear. 5) Extensive internal renovations and upgrade along with all associated site works
Of conversion and extension of existing shed to dwelling house all associated site works
And completion of extension to the rear of house and all associated site works
At a site at Church Street, Killaloe, Co Clare for: at existing building: Demolition of extensions to rear of existing property, form new gated pedestrian access to rear of site within building volume. Change of use from retail to community use to provide Universal Access. Changing Place Bathroom, with store over. At site to rear: Construction of 2 no. short-term holiday let apartments to rear of site (1 no. 3-bed at ground floor and 1 no. 2-bed at first floor) including external terrace spaces, shed, bin storage. Changes to elevation to building at Church Street, including window openings and signage. Replace gate and provide new Universal Access parking space within site at John Street
For change of use from existing dwelling to 2no. 2-bed apartments, and works involving; application of lime render to street elevation, removal of existing chimney, new rooflight and window openings to rear, two-storey extension to rear, and all associated layout modifications, landscaping and drainage works
For the demolition of a storey and a half, derelict, detached cottage and for a replacement part two storey, part single storey house, a waste water treatment system and all associated works
For the construction of a bay window the first floor, dormer window to the second floor, demolition and reconstruction of the existing rear extension, internal alterations, together with all associated ancillary and incidental site works
Of a sunroom and small extension to the dining room both at the side of his house and retention of glass door in lieu of permitted window at the front of his house and all associated site works
For development which will consist of 1 no. external universal access ramp and 2 no. internal universal access ramps. St. Flannan's Cathedral is a protected structure RPS no. 153.
For change of use from residential dwelling to Long-term residential care facility for people with disabilities and retain existing rear extension all as per drawing documentation submitted together with all ancillary site works and services.
Of revised site boundaries as constructed from that previously granted - File Ref P02-673
To locate a cabin (10*20 ft) on a parking space on the Waterways Ireland property at Mill Yard between the Water, Killaloe Co Clare, on a temporary basis from 1st May 2024 until 30th September 2026. This site will serve as an operational base for My Next Adventure
To locate a cabin (10ft x 20ft) on a parking space on the Waterways Ireland property at Mill Yard between the Waters, Killaloe, Co Clare, on a temporary basis from 1st May until 30th September 2021, 2022 and 2023. This site will serve as an operational base for My Next Adventure
For the construction of a single storey detached home gym and artist studio, hard & soft landscaping, existing connections to services & septic tank, together with all associated site works, as a revised application from previously granted planning reference number: 2360531
The development of a detached home gym and artist studio over two-storeys, hard and soft landscaping, existing connections to services and septic tank, together with all associated site works.