For development, the development consists of the construction of a milking parlour, slatted cubicle unit and associated site works
To construct a new dwelling house, domestic garage, and a wastewater treatment system with percolation area and soil polishing filter, along with a new vehicular entrance/exit to serve the proposed dwelling. The application will also include modifications to the existing entrance serving the existing cottage, connection to the public water supply, and all associated site development works and services necessary to facilitate the proposed development
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
To construct a new dwelling house, septic tank with percolation area and all associated site works
To (a) Construct and extension to existing warehouse facility which will consist of offices, warehousing / distribution space along with sanitary and welfare facilities, (b) Construct increased parking and turning areas (c) Install new wastewater treatment system and soil polishing filter together with all associated site development works and services
To construct an extension to the side of the existing dwelling house
For the following development: (a) construction of a first floor extension to the rear of the existing dwelling. (b) construction of covered patio area to the rear of the existing dwelling. (c) changes to the internal layout of the dwelling. (d) alterations to the elevations of the existing dwelling and garage. (e) all associated site works and services
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
For the construction of a dwellinghouse, new vehicular entrance & proprietary waste water treatment plant including all ancillary site works
On the grant of outline permission (Ref no P23-60235) the development will consist of a dwelling house with proprietary wastewater treatment system and percolation area together with ancillary site works
For the construction of an extension to rear of existing dwelling to include Kitchen/ Dining/ Living, Utility room, Hallway and 2 no En-suite Bedrooms, including renovation, internal alterations and elevational changes to Existing Dwelling. Permission is also sought for installation of a Waste Treatment Plant, Improvement of existing vehicular entrance & for the demolition of existing out-buildings, including all ancillary site works
To upgrade an existing agricultural entrance to a Forest Road Bell mouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry.
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
For completion of construction of dwelling previously granted permission under planning application P03-1691 with all ancillary site development works and services
For development which will consist of the demolition of eastern two-storey side extension, the partial demolition of western conservatory and the erection of replacement single and two-storey side extensions, internal alterations including minor reconfiguration, replacement of exterior windows and doors, exterior repairs and all associated site works at Ballycar Station House, a protected structure (RPS No:642)
To construct dwelling house, septic tank, percolation area and new site entrance
Of (a) conversion of former garage to accommodation (b) construction of attached garage & (c) fenestration changes to the front & rear elevations, together with all associated site development works and services
Of upper floor garage
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
For the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application
To demolish an existing Industrial building and associated works on site and to construct a dwelling house and garage, with effluent treatment system, with all associated site works
To RETAIN the construction of lean- to extension to side of garage & extension to rear of garage to include roof area, boiler house, balcony and retention permission for alteration of position of treatment plant and percolation from that approved under P03-1728, including ancillary site works.
To construct an entrance, dwelling house, garage, wastewater treatment system with soil polishing filter together with all associated site development works and services
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a single dwelling house, advanced water treatment system and ancillary site works.
For new domestic entrance and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
For the construction of an extension to existing shed/studio to comprise of home gym including ancillary site works
To construct a dwelling house and garage, with effluent treatment system new entrance from public road, and all associated site works
For the construction of a storey & half extension to existing dwelling to include 3 no. bedrooms, 2 bathrooms, utility, study, store & link corridor. Permission is also sought for the demolition of rear extension & side extensions & for permission for alterations and renovation of existing dwelling house & for the installation of treatment plant & percolation area including all ancillary site works
To construct a single storey dwelling house, wastewater treatment system /soil polishing filter and all associated site works.
To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
To demolish rear shed/garage. Construct rear / side extensions. modifications to front façade, new front porch with extensive internal renovations and all associated site works to existing dwelling house
To construct single and two storey side extensions. Modifications to existing front facade and extensive internal renovations. New wastewater treatment system and all associated site works to existing dwelling house
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
The development consists of the construction of a slatted unit and associated site works
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To construct a single storey detached work studio to the front and side of an existing dwelling and all ancillary site works.
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For development, the development consists of the construction of a slatted unit and associated site works
For (a) to refurbish and reroof and for a change of use of an existing outbuilding from storage use to accommodation use ancillary to the existing house, and to construct a new extension and (b) To refurbish and reroof an existing barn to include a roof mounted PV solar array, and to construct a new glass house and ESB switch room/ services building, all located close to a protected structure ref RPS no. 640.
To repair and reroof an existing outbuilding located close to protected structure (ref RPS no. 640)
To remove an existing greenhouse superstructure and to construct a new greenhouse, restore and rebuild an existing outbuilding structure and to reroof in part, all located close to protected structure ref RPS no. 640.