Planning records
Showing 101-150 of 32,963 public recordsA residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
The development will consist of retention of as built 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
Retention of 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
The proposed development consists of the construction of 2 no. 3-bedroom semi-detached dwellings with private rear gardens, situated to the rear/side of the existing dwelling. The proposed +development also includes the removal of the existing front garden wall, provision of additional car parking spaces, landscaping, boundary treatments, drainage connected to existing services and all associated site works necessary to facilitate the development.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Revisions to permitted house types under Reg.Ref. SD15A/0127 and relates to three house types i.e. house types E1, E3 and E4. It is proposed to modify the ground floor extensions to the rear of 156 of the aforementioned house types.
The proposed development consists of the construction of a dormer attic extension by converting the existing attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
Demolition of the existing single-storey c. 2,605sq.m. Junior School building; demolition of the existing single-storey c. 211sq.m. Junior School ancillary structures; construction of a new part three/part two-storey c. 4,998sq.m - Junior School building, located to the west of the existing Senior School building. The new school will accommodate 27 classrooms, a 3-class base Special Education Needs facility and all ancillary accommodation (the Senior School does not form part of planning application); 2 single-storey temporary accommodation units, c. 400sq.m, located to the south of the site, to facilitate the construction of the new school building; renewable energy design measures, PV Panels and/or heat pumps located at roof level; new school signage comprising wall-mounted lettering on the front elevation of the new building; external hard play area and 2 Multi-Use Games Areas; all located to the south of the site; redevelopment of the existing staff car parking and set-down facilities within the school site comprising: provision of 40 Junior school staff car parking spaces and 6 car set-down spaces, resurfacing of 22 existing Senior school car parking spaces, 106 bicycle parking spaces, new access road, new footpaths, landscaping and all ancillary site works; boundary treatment comprising of repair works to the existing low-level blockwork wall and new metal railings to an overall height of 2.4m along Fortunestown Road; replacement of the existing palisade fencing with new 2.4m high railings along Kiltalown Park Rd to the south; replacement of the existing pedestrian and vehicular entrance gates; works in the public road outside the school site: including 5 set-down spaces along Fortunestown Road, and services connection required to facilitate the development.
Provision of an electronic gate.
(A) Construction of 1no. two storey, end of terrace 2-bedroom dwelling (76sqm) with new vehicular entrance off road. (B) All associated site development, landscaping and drainage works to facilitate the development; ancillary works for foul water to public drainage system and provision of surface water soakaway to meet BRE Digest 365 standards for the new dwelling.
For demolishing of existing extension to rear & provision of new entrance & porch to front. Construction of one two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property
Permission for demolishing of extension to rear and provision of new entrance and porch to front. Construction of one, two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property.
Move entrance & demolish existing extension to rear; construction of 1 two storey, three bedroom dwelling to adjoin existing property.
Modifications to the granted permission (planning reg. ref. SD16A/0210). The proposed Modifications will consist of the addition of 6 No. apartment units (1 No. 1-bed unit,5 no. 2-bed units) on the third floor and set back floor plan on the Fourth Floor, Increasing the overall Apartment Block from 4-storeys to 5-storeys, and from 20 No. apartment units to 26 No. apartment units (consisting of 4 no. 1-bed units, 22 no. 2-bed units ) and 1 community floor space of 160 sqm. No modifications to as-granted 90 no. houses, The overall total no. of units in this development is now increased to 116. All with associated site works, Bin and Bike storage, the site layout has been modified slightly to accommodate additional surface car parking and other ancillary works.
Greenacre Residential DAC intends to apply for permission for modifications to previously approved development SHD ABP-305563-19 at this site at Fortunestown Lane and Parklands Parade, Saggart, Co. Dublin. The proposed development will consist of modifications to the development permitted under Reg. Ref. SHD ABP-305563-19 which comprised 488no. apartments and 1,985sq.m of non-residential floorspace within 5no. blocks (Blocks A to E) ranging in height from 5 to 9 storeys. The proposed modifications relate to the previously permitted 5 storey Blocks C, D & E only and consist of an additional storey on each block and reconfiguration of the previously permitted floor levels to provide an additional 86no. apartment units and a total of 396no. apartments and 752sq.m of non-residential floorspace in lieu of the previously permitted 310no. apartments and 896sq.m of non-residential floorspace. Overall, the permitted Blocks A & B and the modified Blocks C, D & E will accommodate 574no. apartments and 1,841sq.m of non-residential floorspace. The modified blocks will consist of: - Block C: 6-storey block accommodating 129no. units (26no. 1 bed units, 84no. 2 bed units and 19no. 3 bed units) with 3no. retail/ commercial units (555sq.m) and a licensed café/ bar/ restaurant unit (197sq.m) at ground floor level fronting onto the permitted local square; Block D:- 6-storey block accommodating 140no. units (32no. 1 bed units, 90no. 2 bed units and 18no. 3 bed units), Block E: 6-storey block accommodating 127no. units (48no. 1 bed units, 65no. 2 bed units and 14no. 3 bed units) and all associated communal amenity spaces and private amenity spaces comprising terraces/ balconies. Permission is also sought for extension and modifications to the permitted single level basement below Blocks C, D and E to accommodate 332no. car parking spaces, cycle parking spaces, bulky item and bin storage areas with 2no. vehicular accesses provided from Parklands Parade. The modified ground level areas adjoining Blocks C, D and E include 10no. car parking spaces, cycle parking, public lighting, ESB substations, boundary treatments, hard and soft landscaping, surface water drainage infrastructure and all associated site development and infrastructure works. No modifications are proposed to the permitted Blocks A & B or the separate basement level area relating to Blocks A & B. The application is a Large-Scale Residential Development and may be inspected online at: www.parklands-lrd1.com
488 apartment units comprising 118 1-bed units, 327 2-bed units and 43 3-bed units arranged in 5 blocks (Blocks A to E) and all associated public open spaces comprising landscaped courtyards and communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed Blocks A and B and Blocks C, D and E are arranged over separate single levels basements and comprise 5 storey blocks with a 9 storey element in Block B. Non-residential floorspace is proposed in the form of a creche of 431sq.m gross floor area, community space of 186sq.m and 472sq.m of retail/commercial floorspace divided across 3 units at ground floor level within Block B and 708sq.m of retail/commercial floorspace divided across 3 units and 1 café/bar/restaurant of 188sq.m within Block C all fronting onto a proposed landscaped local square located to the north of Saggart Luas stop. Vehicular access to serve the proposed development will be provided from a signalised junction at the south-eastern corner of the site replacing the existing roundabout off Fortunestown Lane and west of Cuil Duin and an east/west distributor road all as permitted under the neighbouring development (ABP Ref. 300555-18). Permission is also sought for 418 car parking spaces including 405 basement level spaces and 13 surface level spaces and a total of 706 cycle parking spaces including 620 basement level spaces and 86 surface level spaces, bin storage areas, ESB substations, public lighting, boundary treatments, surface water drainage infrastructure including modifications to the previously permitted flood conveyancing channel (ABP Ref: 300555-18) and all associated site development and infrastructure works.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to access attic as non-habitable storage space. Retention permission for single storey shed extension to side of existing house, Retention permission for extended vehicle access all with associated ancillary works
Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain).
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
We Kingscroft Development Limited seek Planning Permission for modifications to the granted permission (planning reg ref SD16A/0210) at the site west of Citywest Road (N82) South of Garter Avenue/Citywest Avenue, Citywest Dublin 24., The development site is bounded to the east by the N82 Citywest Road, to the North East by Garter Avenue and to the south by lands. The modifications include the change of use of the granted community floor space on the ground Floor of the granted 4 Storey Apartment Building to 1no 2 bed apartment unit and 1no 1 bed apartment unit. All with associated siteworks
Retention consists of the construction of a rooflight in the main roof to the front of the property.
Proposed partial ground floor front extension with bay window & pitched roof over to existing bungalow
Subdivision of a two storey apartment across second and third floors (170.12sq.m) into two separate apartments each with own door access to be known as 311 Swiftwood (second floor - 84.65sq.m) and 411 Swiftwood (third floor - 85.47sq.m).
Permission sought for the retention of existing store and glasshouse at rear
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 15sq.m and is ancillary to the primary retail use.
The Construction of new dormer attic structure in mid terrace dwelling consisting of bedroom and ensuite and all associated site works
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.
Two Storey Extension to the side and single storey extension to the rear with associated internal alternations to the dwelling and all associated site works
Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station.
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
Retention to retain single storey independent unit in rear garden, and all associated site works.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
Ground floor extension to side and rear to provide kitchen, wc, utility and living room with bay window to front elevation; first floor extension to side to provide single bedroom and en-suite double bedroom and associated site works.
Demolition of existing single storey detached garage and construction of a two storey hipped roof extension to the front and side of existing two storey semi-detached dwelling with associated changes to all existing elevations; extension to consist of additional ground floor living space, toilet and bin stores and an additional first floor bedroom with en-suite toilet along with all ancillary site works.
Retention Permission for ground floor front and rear extensions with pitched roof.
Construction of 1 two bedroom, single storey detached short let self-catering tourist accommodation Unit A; 2 two bedroom single storey, semi-detached short let self-catering tourist accommodation Unit B; use of the existing two bedroom bungalow as caretaker residential accommodation and all ancillary landscape and site services works.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Retention for a porta cabin with an area of c. 54sq.m; Retention for mobile home with an area of c. 54sq.m; Retention for installation of electronic gates with a width 10m; Retention for installation of hardstanding / cement yard with an area of c. 1,020sq.m.
Mixed use development will consist of 28 residential units(comprising 1-1 bed units; 16 2-bed units and 11 3-bed units (including terraces and balconies) an office unit (100sq.m), 2 retail units (87sq.m and 154sq.m), ancillary bin stores (16sq.m) and bike storage area (29sq.m) across 4 blocks (Blocks A to D); the breakdown for the individual Blocks is as follows: Block A (3 storeys (1,497sq.m), 7 apartments and 7 duplex apartments; Block B (3 storeys (851sq.m) 4 apartments and 4 duplex apartments; Block C (3 storeys (777sq.m), 6 apartments and 2 retail units and Block D (2 storey (243sq.m), the refurbishment, alteration and extension of the existing 2 storey former public house (including the demolition of a 3sq.m rear lean-to) and its change of use to 1 office unit and 1 apartment with new bin stores and bike store to the rear. The provision of private open space, communal and public open space; surface car parking (30 spaces); all hard and soft landscaping including boundary treatments; SUDS measures including attenuation tanks; PV panels; changes to levels and all other associated site excavation and site development works above and below ground. Vehicular access will be form Pairc Mhuire to the south. The existing perpendicular public parking on the north side of Pairc Mhuire will be replaced with 4 perpendicular car parking spaces on Pairc Mhuire and 2 parallel car parking spaces on the eastern side of Boherboy Road. The site is bounded by Main Street to the north, public open space to the east, Pairc Mhuire to the south and Boherboy Road to the west. it previously accommodated a petrol filling station and a public house (part of which remains on site).
Change of use for the ground floor of the existing two storey Public House Block D (disused/vacant) and the ground floor of the proposed Block C. The application seeks modifications to Block C and Block D of the previously granted permission SDCC Reg. Ref. SD18A/0202. Block C comprised a 3 storey building accommodating 2 no. retail units on the ground floor and 6 no. apartments (5 no. 2 bedroom and 1 no. 1 bedroom) across the first and second floor. Block D comprised refurbishment, alteration and extension of a 2 storey existing Public House building to accommodate 1 no. commercial office unit on ground floor and 1 no. 2 bed apartment on the first floor along with a new bin/bike store at the rear. The modifications seek a change of use from previously granted retail/commercial use to residential use to provide an additional 4 no. 2 bedroom apartment units on the ground floor of Blocks C & D. The proposed works to Block C include a change of external material finishes and replacing the glazing of retail units with windows for the proposed apartment units on the ground floor to accommodate 3 no. 2 bedroom apartments accessed through entrance corridor. The proposed works to Block D include removing the existing doors/windows and replacing them with new doors/windows to match the existing to accommodate 1 no. 2 bedroom apartment on the ground floor of the existing two storey former Public House. All with associated bin store, bicycle store and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Retention of a single -storey shed/garden room circa 24sqm to rear of existing property
Retention Permission sought for widening of entrances, laying of hard standing over grassland plus permission for the construction of a storey and a half dwelling plus a dethatched domestic garage, a domestic waste water treatment system plus a surface water soakaway and all associated site works.
The development will consist of Retention Permission sought for widening of entrances, Laying of hard standing over grassland plus permission for the construction of a storey and half dwelling plus a detached domestic garage. A domestic waste water system plus a surface water soakaway and all associated site works.
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works, landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.