To construct a new dwelling house, site entrance, proprietary waste water treatment system and all associated ancillary site works
For the development of a single-storey extension that will accommodate a mainstream classroom and 2no. SET (Special Education Teaching) classrooms, and all associated site works
(1) to RETAIN 3 no prefabricated structures for use as (a) a childcare facility (b) art room/multipurpose room (c) computer room (2) PERMISSION for development which will consist of the construction of a hurling practice wall and associated site works
For development which will consist of (1) The construction of a new hurling practice wall and ancillary site works (2) The construction of a school playground facility including associated fencing enclosure and ancillary site works
Of roof windows on the existing dwelling
To construct dwelling house, garage, proprietary treatment system, bored well and carry out ancillary site works
For the construction of a dwellinghouse, garage, proprietary waste treatment plant and bored well and to utilise and improve existing entrance and farm access road to serve proposed dwelling including all ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To demolish existing fire damaged dwelling house and to construct a replacement dwelling, with all associated site works
To carry out alterations and extension to dwelling house
For (a) a side and rear extension (b) a porch to the front of the house, (c) to enlarge the first floor dormer window to the front of the house and (d) a single storey garage to the rear of property,
To construct a new one and a half storey dwelling along with proposed secondary wastewater treatment system and soil polishing filter, as well as all ancillary site works
To demolish existing garage and construct a new garage, lean to greenhouse and all ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To demolish and existing derelict dwelling and to construct a new replacement dwelling, install a new effluent treatment system, all with associated works and accessed by means of an existing entrance and driveway from public road,
To demolish an existing derelict dwelling, and to construct new replacement dwelling, install a new effluent treatment system, all with associated works, and accessed by means of an existing entrance and driveway from public road
To construct a dwelling house, and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house, and garage, with effluent treatment system, new entrance from public road, and all associated site works
As follows: (A) to RETAIN as constructed 2 storey dwelling house, garage & carport (previous planning ref. 92/20) (B) to RETAIN as constructed single storey granny flat (C) to RETAIN as constructed 2no. utility outbuildings (D) to RETAIN as constructed effluent treatment system & site boundaries etc. (E) All associated ancillary site works & services
To construct a dwelling house, garage, treatment system, create new entrance to public road and carry out ancillary site works
To construct a new dwelling house, access road, entrance, garage and install a new wastewater treatment system along with all associated works
To construct single dwelling house incorporating a greenhouse and garage, as a replacement dwelling for existing house on site, to extinguish the residential use of existing house and use it for agricultural related activities, install new waste water treatment system, percolation area, bored well and all associated site works
To carry out the following development: for the extension of existing Footpaths and Junction realignment. The proposed development will include: 1) Realignment of existing Junction. 2) Set back existing stone wall and provision of 100m of 2m wide concrete footpath to North West of th Junction. 3) Extension of existing 2m wide footway for 40m along existing macadam surfacing to South West of the junction. 4) 1 No. Raised uncontrolled pedestrian crossing accross the L4158 (Ruan Road) 5) 1 No Raised uncontrolled pedestrian crossing the R458 to motorway. 6) 1 No. flush uncontrolled pedestrian crossing across R4159 to Ennis. 7) 1 No flush uncontrolled pedestrian crossing with seperation island, R458 to Crusheen. 8) 2 No Additional public Lighting columns and associated ancillary works to tie into existing public lighting system. 9) Provision of, Gullies, drainage pipework and associated ancillary works to existing public system. 10) Provision of associated Signage and Road Markings. 11. All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
To construct a new dwelling house, private garage, site entrance to include all associated site works and services including on-site wastewater treatment system and bored well
For a proposed private dwelling house, outbuilding to accommodate carer’s accommodation, home office, stable and garden storage, widen existing site entrance, new site access road, new waste water treatment system and all associated site works
For the construction of a two storey type dwelling, domestic garage, effluent treatment system and associated site works
To carry out internal and elevational modifications along with external covered seating area and associated site works and services
To construct dwelling house, garage with loft, treatment system and ancillary site works with access via right-of-way to public road
Of conversion of existing attic space (41.5 sq.m) to include 2 no. bedrooms with en-suites, plus access stairs, windows, and rooflights, along with internal modifications, and associated site works. RETENTION permission is also sought for existing garage (43 sq.m)
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To retain and complete development. The development consists of retaining and completion of existing granny flat at the rear of existing dwelling house and associated site works
To construct a new dwelling house, on-site wastewater treatment system and all associated site works and services
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a dwelling house, site entrance, private garage, bored well and on-site waste water treatment system along with all associated site works
To upgrade existing sewage treatment system and install a new percolation area and associated site works
The development consists of the construction of an agricultural loose house and associated site works.
For the change of use of existing vacant bakery building into 3 no. one bedroomed apartment units together with all ancillary site works required to facilitate the proposed development
To construct an extension to comprise of a kitchen/living, bathroom, bedroom and playroom, including ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Of private garage, sunroom and minor alterations to dwelling house
To construct an agricultural entrance together with all associated site development works and services
For the extended site boundaries, the dwelling house, garage, treatment system, and site entrance as constructed which differ in location, and design to those granted under existing permission P02-2242, and for PERMISSION to upgrade the percolation area, all with associated site works
For development which will consist of (1) Demolition of an existing sub standard dwelling house. (2) The construction of a new dwelling house, garage, a proprietary waste water treatment system and ancillary site works
A) the retention of a new vehicular entrance onto the public road, the infilling and removal of a disused well and b) permission to close up existing vehicular entrance serving lands together with ancillary site works
For proposed development which will consist of the construction of a single-storey dwelling house, wastewater treatment system, percolation area, private well, upgrades to existing entrance, and all ancillary site works.
To construct a slatted shed to include concrete aprons, entrance roadway and all associated site works. A Natura Impact Statement (N.I.S.) will be submitted as part of the application
To retain the existing domestic garage
To construct a two-storey dwelling house, detached garage, entrance, boundary walls, waste-water treatment system, polishing filter and all associated site works
To construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services