Of the following (a) the existing Covid structure as covered external shelter and play area and (b) the use of the ground floor of existing house as a creche/montessori and removal of condition 3 of granted Planning Permission P04/626
Of the following works, (A) The use of the ground floor of the existing dwelling as a childcare / Montessori Centre, (B) The erection of a steel structure for use as a shade / covered play area, and (C) The erection of a steel shed for use as a store, all with associated site works
To Retain entrance wall and gates, abutment wall and elevational changes and Permission to construct an extension to the dwelling house, remove offsite an existing container and construct a new domestic garage along with all associated site works
For development which will consist of the construction of a dwelling house, garage, including connection to public services and ancillary site works
To construct an extension to the existing dwelling house along with ancillary site works
To (a) demolish a conservatory / rear hallway, bay window, dormer, chimney, mansard roof and garage (b) to construct a second storey extension to the rear, single storey extension to the rear, porch to the front and new garage (c) elevation changes with all associated site works
For the construction of a temporary primary school consisting of 7 no. temporary prefabricated buildings to accommodate 12 Classrooms, 5 SET Rooms, Staff Room Principal Office, Administration and all related site development works including roads, parking and drop-off area,
To apply for a 5 year temporary permission for the construction of a temporary primary school consisting of 7 No. temporary prefabricated buildings to accommodate 12 Classrooms, 5 SET Rooms, Staff Room, Principal Office, Administration and all related site development works including roads, parking and drop-off area,
The development will consist of an extension to an existing stable / garage and to change the use to a home office
Of (a) 'as constructed existing' dwelling house i.e. (P8/13134) (b) 'change of use' of attached garage from previous domestic garage use to ancillary granny flat accommodation. (c)all ancillary site works and services
Of 1)an astro turf pitch, including associated fencing and netting 2) PERMISSION for development which will consist of a new astro turf pitch including associated fencing, netting and ancillary site works
For construction of a single storey extension to the rear of existing school comprising classroom accommodation, sensory garden and play area, revised parking, landscaping, drainage, revised astro surfacing, hurling wall and related works to existing school
To extend the existing Astro Turf playing pitches to include for an additional 40m x 25m Astro Turf pitch, metal posts and fencing to the perimeter of the new playing pitch, two additional lighting poles along with associated lights and all ancillary site works both above and below ground
For development which will consist of the construction of a dwelling house with garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of a revised dwelling house with garage design, to that previously approved under planning ref. P20-334
Of the extension to the side of the existing dwelling and the shed to the rear of the dwelling & all other associated site works
To renovate, alter and extend an existing dwelling house, to covert an attached garage into living accommodation, to construct a new private garage and to demolish an existing garden shed along with all ancillary works
To construct a new dwelling house, entrance, private garage and install a new wastewater treatment system on an infill site along with all associated works
To construct a single storey extension to the side of the existing dwelling house, including site services and all ancillary site works
To carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application.
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system, a bored well and ancillary works
To construct an agricultural slatted shed including all associated site works and services
To demolish existing derelict dwelling house, construct new dwelling house, treatment system and carry out ancillary siteworks
For development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
To (a) Construct side extension and fenestration changes to existing cottage (b) Construct detached domestic garage together with all associated site development works and services
To construct a storage shed together with ancillary site development works and services
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house, septic tank, sewerage treatment system and access to the public road
Of a separate garage to the side of the existing dwelling house
For (1) RETENTION of (a) family room rear extension (b) side patio roof covering (c) stone cladding to part of previously approved extension under PR-0271 (2) PERMISSION for development which will consist of alterations and a single storey extension including ancillary site works
For the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
To (a) change design of private dwelling house and garage and (b) relocate proposed wastewater treatment system and percolation area as previously granted under Planning Register Reference P17-647, connect to existing infrastructure services and all associated site works
To construct a vintage truck / storage shed together with all ancillary site development works and services
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
The development will consist of the construction of a slatted unit and associated site works
To demolish existing garage and construct an extension to the side of the existing house along with alterations to existing house and associated site works
For (a) to demolish an existing garage, (b) To construct a single storey side extension and (c) Elevation changes with all associated site works
To construct a new agricultural entrance onto the public road including site works
The development will consist of conversion of domestic garage to habitable accommodation together with extension and alterations to existing dwelling house and associated site works
To demolish existing outhouse, construct an extension to both sides of existing dwelling house to include associated renovation works and site works
For development which will consist of (a) single storey extensions to the rear of the existing dwelling, (b) alterations to elevations of the dwelling, detached boathouse & detached garage including a new canopy at the front entrance & rooflight over the stairs; (c) the change of use of the existing detached boathouse to use as a wellness suite and home office; (d) a new wastewater treatment system and percolation area; (e) all associated site and landscaping works to serve the development
To demolish existing sunroom to side of existing dwelling, make changes to the layout and elevations of the dwelling, construct extensions to sides and porch to front of the dwelling, use part of the dwelling as a granny flat, and extend the existing percolation, all with associated site works
The development will consist of planning PERMISSION for a period of five years to construct and complete a Solar PV Energy development with a total site area of 16.08 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, watercourse crossing, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
To construct a new dwelling house, private garage, site entrance, access road and on-site wastewater treatment system along with all other associated site works and services