Development consisting of (i) 336m2 of roof mounted photovoltaic panels, (ii) the erection of a roof mounted heat pump and (iii) the installation of a revolving door and accessible entrance door at the front entrance, together with all associated site works and services.Decision record indexed
Development consisting of demolition of existing industrial/commercial building and to construct a 4-storey student accommodation building comprising 28 no. student apartment units with 104 bedspaces, comms room, laundry, storage facilities, refuse area, carparking area, bicycle parking area, landscaped open space and all ancillary site servicesDecision record indexed
Development consisting of the retention of a singe storey extension to side and rear of dwelling house with all associated worksDecision record indexed
Development consisting of alterations and change of use on Unit No 2 from retail warehouse to gym / group fitness centre. The proposed development will include combining Unit No. 2 and Unit No 2A to extend the existing gym in Unit No 2A. Floor area subject to change of use will be 946 sqm.Decision record indexed
Development consisting of the use of a car park for a farmers market on Saturdays from 8.00 am until 2.00 pm Area 960 sq.m. - CONDITION NO. 4 COMPLIED WITHDecision record indexed
To construct extension to Hotel Executive Apartment Building permitted under planning reference PD30/03 and modified by planning reference PD183/03. The extension will be 3 storey comprising recreation space at ground floor level with accommodation space at first and second floor levelDecision record indexed
AbbVie site Old Bundoran Road, Ballytivnan, County Sligo
A two-storey extension to the existing industrial facilities, with a total area of approximately 247 square metres. They include: (a) The construction of a new two-storey prefabricated modular extension to the east of the existing warehouse in the centre of the existing site. The proposed extension will be approximately 218 square metres and approximately 8.1 metres high. (b) The construction of a new single-storey electrical building annex to the south of the proposed modular extension in the centre of the existing site. The proposed extension will be approximately 29 square metres and approximately 4 metres high. (c) Associated items of plant and equipment including Air Handling Unit located on the south side of the proposed modular extension on the roof of the electrical building annex. (d) Alterations to the east elevation of the existing warehouse to include new personnel doorway and access stairway to existing warehouse. (e) The works also include modifications to internal roads and pathways, underground utilities, site lighting, temporary construction lay down and all associated siteworks. This application consists of a variation to previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is requiredDecision record indexed
1. Construction of a single-storey extension to front (south side) of house, removal of bay window to east side and construction of small extension, removal of rear utility room annex and construction of a new two-storey stairwell. 2. Elevation modifications to the house. 3. Upgrade of existing effluent treatment system and all associated site worksDecision record indexed
Development consisting of retention of an existing 4.7m high single storey building with floor area of 318 sq m for staff access control for Covid 19 prevention measures with change of use to a permanent production room with ancillary toilet facility and an externally sited air handling unit. The building is located at the south east corner of the existing production facility.Decision record indexed
Sligo University Hospital, The Mall Rathquarter, Sligo
The development will consist of the construction of a single storey 48.90m² laundry storage facility and to relocate an existing bicycle shelter at Sligo University HospitalDecision record indexed
Development consisting of (1) The demolition of an existing storage building 47 sqm in area (2) The creation of a new access road to tie in with the future eastern Garavogue bridge and approach roads scheme by Sligo County Council, associated open space and landscaping works along the river GaravogueDecision record indexed
Development consisting of (1) new site entrance and new front boundary (2) new garage (3) to retain the existing house in its current location as the location differs to what was granted under PL 18226 (4) retain revised site boundaries as boundaries differ to what was granted under PL 18226 (5) and all associated site worksDecision record indexed
South East Corner of Sligo Regional Hospital, The Mall, Rathquarter
Development consisting of the construction of a 332.5m2 development at Level 8 & roof level of the multi-storey block over the existing Paediatric Department on level 7. The development shall comprise (1) New 258 m2 extension to the existing Intensive Care Ward at level 8 consisting of 4 new isolation rooms with associated stores, utility rooms, circulation areas and access off existing isolation ward (2) Construction of new 74.5m2 associated plant room at roof level, with all associated connections to existing site services infrastructure. Sligo University Hospital Campus contains a Protected Structure RPS no 217SE. The proposed extensions not in immediate contact with the protected structure.Decision record indexed
Development consisting of the following: To construct a 1 and 1/2 storey dormer type domestic dwelling, to construct a new site entrance, to construct a waste water treatment system to EPA code of practice standards together with all associated ancillary works.Decision record indexed
Development consisting of construction of site security fencing around the perimeter of the Abbvie Ballytivnan site boundaries (approximately 1304m long). The fencing will be 2.4m high galvanised welded steel mesh panels and posts with powder coated finish. The new security fence will include vehicular access gates and pedestrian gates at locations around the boundary.Decision record indexed
Permission for 1) The construction of a 6.1m high single storey extension with a floor area of 176m2 for the Pack-Off area located at the southeast corner of the existing production facility, 2) The construction of a 14m high new fire escape staircase of 55.4m2 connecting the ground floor, mezzanine and roof located at the southeast corner of the existing warehouse, 3) External galvanised steel fire escape stairs to south elevation of existing warehouse to provide fire escape from new Pack-Off roof and existing mezzanine to ground floor levelDecision record indexed
PR - development consisting of a Prefabricated Communications building with a floor area of 39 square metres and 3.46 metres in height installed to the east of the existing buildings with associated site works. The building is clad in insulated metal claddingDecision record indexed
Upgrades to existing on-site wastewater treatment system consisting of an effluent treatment unit and soil polishing filter on siteDecision record indexed
Construct a 3 story 344m2 Nuclear Medicine extension block. The development shall comprise the following:(1) Level 3 - 134m2 Nuclear Medicine ward, (2) Level 4 – 114m2 Office Block, (3) Level 5 - 96 m2 Plant Room, (4) alteration to existing staff entrance, (5) all associated site works and services.Decision record indexed
The previously granted permission PL25/60044 comprised a three-storey, 344 m² Nuclear Medicine extension. The proposed amendments to permission PL25/60044 comprise the following: (1) Changes to the layout and elevations through the addition of a 96 m² shell and core storey at Level 6. The total floor area of the Nuclear Medicine extension block, as amended, will be 440 m². (2) Changes to the layout and elevations through the introduction of a shell and core area in lieu of the plant room at Level 5.Decision record indexed
Sligo University Hospital Campus, The Mall, Rathquarter Sligo
The installation of approximately 2,300 photovoltaic (PV) panels, each measuring 2,000mm x 1,000mm, resulting in a combined coverage area of approximately 4,600 m² across the roofs of existing buildings within the hospital campus, including the Protected Structure (Block A), the recently completed Specialist Mental Health Unit (SMHU) and the Northwest Hospice under construction. The site includes a 1940’s institutional building (identified as Block A in the application) of regional significance listed under the National Inventory of Architectural Heritage (NIAH Reg. No. 32008001). The proposed development is located both at and within the curtilage of this Protected Structure.Decision record indexed
Development comprising; 1. Accessibility and aesthetic improvements to the Out-Patient’s entrance including the provision of a covered ramp, stairs and lift (418m²) and refurbishment of the existing OPD concourse 2. Retention of covid measures to segregate the Emergency Department (red zone) from General Hospital Circulation (green Zone) including temporarily moving the principle public access to The Out Patients Department Entrance on Level 3 on the south façade (The Mall Carpark Side) 3. Provision of 2 no. bus shelters for the shuttle bus service 4. Creation of a new pedestrian access off The Mall giving direct access to the Medial Beds Department under croft (PL18/392 & PL20/375 refer) and temporary main Entrance, with canopy over 5. Provision of a covered walkway to the temporary main entrance 6. Construction of a new internal access road off the main hospital access road, associated retaining walls and site works 7. Alterations to The Mall entrance to improve traffic flow, car park layout, site levels and cycle storage provisions all necessary to enable the above Medical Beds development 8. Minor alterations to parking and road layouts adjacent to the Renal Department to facilitate phasing and delivery of the Medical Beds development (PL18/392 & PL20/375 refer) with minimal disruption or loss of capacity 9. Proposed new signage to assist wayfinding traffic management and orientation. Including all associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed works are not in immediate contact with the protected structure.Decision record indexed
Development consisting of (i) 400m2 of roof mounted Photovoltaic Panels, (ii) a new 2 tonne LPG storage tank and (iii) a new heat pump, together with all associated site works and servicesDecision record indexed
Development consisting of (1) contruction of an extension to the side and rear elevation of an existing domestic dwelling (2) to demolish an existing front porch (3) to relocate the existing door on the front elevation (4) to upgrade the existing wastewater treatment system to current EPA regulations and all ancillary worksDecision record indexed
PP - development consisting of alterations to the previously approved application reference number PL18/392. The development will consist of alterations to the previously approved single tier multi storey car parking area located above the existing parking area to the northern boundary of the hospital complex. The proposed alteration includes the provision of an additional 74 car parking spaces to provide a total of 164 parking spaces above the existing car park, direct access from the existing circulation road within hospital grounds, associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed car park is not in immediate contact with the protected structure.Decision record indexed
The development will consist of (a) Retention of entire demolition of existing split level dwelling, (b) Retention of new raft slab foundation of proposed new dwelling and associated site works as constructed, (c) Permission for new split level with mezzanine dwelling on said raft (264 sq.m at ground level and 80 sq.m at mezzanine level), together with all proposed site works, including installation of a replacement wastewater treatment system, a covered open-sided parking area to the front (south/west) of the dwelling, changes at the site entrance, as well as all ancillary site works.Decision record indexed
Development consisting of new extensions to the side, rear and mezzanine level of the existing dwelling, comprising of an extension to the south of the existing dwelling (20 sq.m.); a new glazed corridor and winter garden to the rear of the existing dwelling (39 sq.m); and a mezzanine to the rear roof space of the existing dwelling (58 sq.m). Proposed changes to the front elevation comprising of the reconfiguration of window openings, lowered eaves and a new verandah. Proposed site works including installation of replacement wastewater treatment system. A covered open-sided parking area to the front of the existing dwelling; changes at the site entrance, as well as all site clearance and development worksDecision record indexed
Development consisting of amendments to planning application Reference 18/198: the overall layout of the site stays generally the same as before with the foodstore (including ancillary off-licence sales area) with all adjustments to the orientation and movement closer to the western boundary. The gross floor area increases from 2416sqms to 2537sqms. The trolley bay moves from the car park to a location next to the entrance to the store; revised parking layout and pedrestrian walkways (parking changes from 140 spaces to 135 spaces); revised mechanical plant area; ESB sub-station building; cycle parking relocated from the front of the store to the same location (under cover) as the trolley bay, next to the access doors; the inclusion of 2 EV parking spaces and the provision of 10 additional "ready to go" EV charging point spaces for future conversion; replace the permitted "Totem" sign at the proposed vehicular entrance with a "Flagpole" sign and other proposed signage with an area of 75sqms; and, the addition of Photovoltaic (PV) panels on the roof of the foodstore. All associated works, drainagae landscaping (hard and soft) to facilitate the development.Decision record indexed
To change of house design of previously granted dwelling PL22/378. The works will consist of revised floor plans, elevations and finishes, minor reduction in gross floor area and minor modifications to site layout to accommodate the new proposed dwelling. All associated site works, access, drainage, connection to public main, and garage remain the same as granted in PL22/378Decision record indexed
Development consequent following the grant of outline permission (Ref. PL 20/85) consisting of construction of a new dwelling house with connection to existing public services and all associated landscape worksDecision record indexed
Development consisting of the following; construction of dwelling house with connection to public services and all associated site works on siteDecision record indexed
AbbVie Ireland NL B.V., Old Bundoran Road, Ballytivnan Co. Sligo
The provision of additional car parking (55 no. spaces) within the existing site including all associated site works and servicesDecision record indexed
Development located to the west of the existing facility which will consist of the demolition and removal of an existing security building, provision of a new site security building with a floor area of 75sqm and a height of 3.8m, modifications to the internal site circulation roads, parking and footpaths, provision of a covered walkway of 2.1m high, modifications to the existing security fence and gate and all associated site servicesDecision record indexed
West of the existing facility, Old Bundoran Road, Ballytivnan
The demolition and removal of an existing security building, provision of a new site security building with a floor area of 75 sqm and a height of 3.8m, modifications to the internal site circulation roads, parking and footpaths, provision of a covered walkway of 2.1m high, modifications to the existing security fence and gate and all associated site servicesDecision record indexed
1. Construction of a single storey extension to the north side of the existing school building to contain a single classroom and 4 no. S.E.T. rooms. 2. Connection to existing services on site and all ancillary site works connected with the works mentioned above.Decision record indexed
Planning permission for (1) the construction of a new extension to my existing slatted cubicle shed including new underground storage tanks (2) and all associated site works all at, Kiltycooley Td, Drum, County SligoDecision record indexed
Development consisting of the change of house design from that permittted under PL17/192 with connection to public services and all associated site worksDecision record indexed
Development consisting of the construction of a new dwelling house with sewage treatment system and separate domestic garage and all associated site development worksDecision record indexed
Development consisting of the following: outline permission to construct a 2-storey detached dwelling with connection to public services and all associated site worksDecision record indexed