The construction of a dormer to the lean-to roof at the rear of the existing house, the construction of a new extension, including a conservatory type structure to the West of the existing house, the installation of a new wastewater treatment plant, landscaping and site works associated with the proposed development
As constructed dwelling
Dwelling, garage, well effluent treatment system, new entrance and associated works
Dwelling, garage, well, effluent treatment system, new entrance and associated site works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
Erect a fully serviced dwelling house, domestic garage/store, private bored well, on-site wastewater treatment system and all associated site works
Dwellinghouse with services, domestic garage and all associated site works
Extensions to dwelling, to decommission existing septic tank, and for proposed treatment system in accordance with EPA 2021
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
The upgrade of existing effluent disposal system to current EPA standards together with a bored well and all ancillary site works
Single storey dwelling, single storey garage, septic tank & percolation area, new bored well, domestic entrance & all associated site works
Demolish existing shed and construct a dwelling and garage and all associated site works
To install a proposed effluent disposal tank in my existing farmyard with all associated site works
Change of use of domestic garage to additional Playshcool room with services and all associated site works
1. Construction of a single storey dwelling with new vehicular entrance, driveway, well and effluent treatment system to EPA and all associated site works. 2. Block up the existing agricultural entrance. 3. To decommission the existing septic tank belonging to existing house and replace with new treatment system and all ancillary site works
1. Demolition of existing single storey extension 2. Construction of a single storey extension to side and rear of existing dwelling and 3. all ancillary site works
Change of use of existing farm outbuilding within the curtilage of a protected structure and conversion to a new single family dwelling and connection to existing septic tank of main house
Construction of an extension to the existing house and new shed, replace existing front boundary which consists of a sod and stone bank with a 1.2metre natural stone-faced wall and all ancillary site works
Construction of a new dwelling, domestic garage, wastewater treatment unit & polishing filter, new well, new entrance onto existing lane which leads to public road and associate works
Proposal to replace existing unauthorised log cabin with farm house, garage & waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works
Construction of a proposed new single storey dwelling, effluent disposal system to current EPA standards, bored well, new entrance onto existing access road together with all ancillary site works
Erection of a new single storey steel shed building to side/rear of existing dwelling and all associated site works
1) new two storey rear extension 2) forming 4 new dormer window structures at first floor 3) for changing of main roof covering from concrete tiles to zinc covering 4) all associated site works
The removal of external potting and utility sheds and for building 1 new replacement single storey steel shed building to side / rear of existing dwelling and all associated site works
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346
Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.
Applications for planning permission for alterations to previously granted planning application (PRR 20/572 - not constructed), alterations include the redesign of the proposed extension (originally a two storey extension now single storey), and all associated works granted under PRR20/572
1. Construction of two storey extension onto the existing cottage 2. Demolition of single storey extension at side of existing cottage and reconstruction of same 3. Demolition of two no. outhouses 4. To block up existing agricultural entrance and retention of existing vehicular entrance 5. To decommission the existing septic tank and install a new treatment system to EPA standards and all ancillary site works
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Domestic garage and associate works
(1) discontinue and seal existing well on site (2) sink new bored well as replacement and (3) permission to revise site boundaries and all associated site and ancillary works
Alterations to dwelling type as a change to that granted under Planning Register Reference 05/3929, retention of Kingspan Biotec Wastewater Treatment System type as a change to that granted under Planning Register Reference 05/3929, retention of domestic garage. PERMISSION is sought for revised site boundaries, decommission existing on site effluent disposal polishing filter and install new on site effluent disposal polishing filter and install new on site effluent disposal polishing filter as a replacement and all associated site and ancillary works
Detached single storey timber clad kennels along side a detached single storey timber clad utility/washroom all to side of site, retention for 2 no. detached cabins consisting of kennel cabin and office cabin to rear of site, retention for 1 metal storage shed, retention for canopy area and permission for removal of mobile home to side of site and all with associated ancillary works
Construction of a single storey dwelling with garage, vehicular entrance off existing laneway and for a new wastewater treatment system to current EPA standards and all ancillary site works
1. as constructed dwelling, garage & boiler house. 2. Retention permission for revised boundaries and as constructed driveway. 3. Permission for extension to the front elevation. 4. Permission to remove existing bay window and replace with a new bay window. 5. Permission for new window on the front elevation. 6. Permission for 2no. roof lights to the front roof plain. 7. Permission for roof alteration to existing garage. 8. Permission to upgrade existing effluent treatment system to comply with current EPA guidelines
1. Retention of construction of as built conservatory extension to the side 2. Retention of construction of as built utility and porch extension to front. 3. Retention of construction of as built garage. 4. Retention of external lean to covered area to rear and all ancillary site works
As constructed dwelling, revised boundaries and permission to upgrade existing percolation area to current EPA standards and removal of condition number 2 from 03/9511 from restricted use to use by all classes of person
Subdivision of existing site, a new dwelling, new entrance onto public road, wastewater treatment unit and soil polishing filter for proposed dwelling, removing existing septic tank and installing a wastewater treatment unit and soil polishing filter for existing dwelling, new well for proposed dwelling and associate works
Forest access road entrance
Extend the appropriate period of a permission - 15/420 - 82sqm extension to 45sqm cottage and also front porch extension, revised entrance, and replacement waste water treatment system to EPA 2009 standards and site ancillary works Appeal Details
Packaged wastewater treatment system, percolation area, existing well and alterations to existing agricultural building
To construct a dwelling house with services, domestic garage & all associated site works
An existing single storey extension, domestic garage and sheds ancillary to the dwelling along with retention of a gated boundary opening. Planning permission is also being sought for the replacement of the existing septic tank system with a new wastewater treatment unit along with all ancillary site works
A dwelling and garage with services along with all associated site development works
Existing porch constructed to the front of dwelling house
The construction of a new dwelling, garage, septic tank and percolation area, new well, new entrance onto public road and associate works
Installation of a new agriculture shed and associated site works
Installation of a concrete base to sit an Elliptical Milk Tank on and associated site