The construction of a bungalow style dwelling, garage, entrance, driveway, packaged waste water treatment system with eco-flo filter and all ancillary site worksDecision record indexed
Construction of dwelling house, entrance, installation of on-site treatment plant and percolation area together with all associated site worksDecision record indexed
The construction of a dwelling house, entrance, installation of on-site treatment plant and percolation area together with all associated site worksDecision record indexed
The construction of a dwelling house, entrance, installation of on-site treatment plant and percolation area together with all associated site worksDecision record indexed
The construction of a dwelling house, entrance, installation of on-site treatment plant and percolation area together with all associated site worksDecision record indexed
Construction of a dwelling house detached domestic garage, front boundary entrance walls, install a mechanical aeration unit and polishing filter system with all associated site worksDecision record indexed
The construction of a dwelling house detached domestic garage, front boundary entrance walls, install a mechanical aeration unit and polishing filter system with all associated site worksDecision record indexed
The construction of a storey and a half style detached dwelling house, detached garage, site entrance, septic tank with waste water treatment system, bored well as water supply, and all associated site servicesDecision record indexed
The construction of a two storey dwelling house, detached garage, septic tank with propietry wastewater treatment system, front entrance, bored well as domestic wastewater supply and associated worksDecision record indexed
The construction of a new dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site worksDecision record indexed
Extension of duration for 16/7032 for extension of Permission 11/611 for the construction of a dwelling house, septic tank, effluent treatment system and percolation area, new entrance and all associated site worksGrounds not yet categorised
Carrying out of part demolition of existing dwelling including demolition of adjacent derelict outbuildings and for permission to carry out alterations and extensions to the front, side and rear of existing dwelling including a carport roofed area, the installation of an on-site effluent treatment system, permission to install a temporary prefab dwelling unit, provision of new driveway and all associated site development worksDecision record indexed
An extension to the rear of the dwelling and all ancillary site works. Retention permission is also sought for the conversion of the attached garage to living accommodationDecision record indexed
The construction of a new dwelling house, garage, entrance, driveway, packaged waste water treatment system with soil filter and all ancillary site worksDecision record indexed
(ref. no. of outline permission 21/717) a dwelling house, waste water treatment system, percolation area, site entrance and all associated site works. Planning permission is also sought for a detached domestic garageDecision record indexed
The construction of a new replacement dwelling house, steel frame shed, demolition of the existing barn, use of the existing derelict house as a garage with new roof, new driveway, decommissioning of existing septic tank system, new packaged wastewater treatment system with percolation area and all ancillary site worksDecision record indexed
The subdivision of an existing plot, construction of a new single storey dwelling, installation of a new packaged wastewater unit with percolation area, entrance, driveway and all associated site works. Retention Permission for existing mobile home for use during construction periodDecision record indexed
Construction of a new dwelling with three sheds, packaged wastewater treatment system and polishing filter, splayed entrance and all associated site worksDecision record indexed
(a) construct a single storey extension to side of dwelling house, (b) make elevational changes to existing dwelling house including the removal of dormer style windows and Dutch type gables, (c) and all ancillary site worksDecision record indexed
The construction of a single storey extension to the school to include the following, (I) a resource room, (ii) 2 no. general classrooms with toilets. The toilets are to be connected to the existing drainage systemDecision record indexed
The following; (a) position of site boundaries, (b) domestic garage to rear of site, (c) as constructed front boundary wall, (d) as built alterations to plans and elevations of permitted house together with (e) all associated site worksDecision record indexed
The construction of a new dwelling house, garage, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site worksDecision record indexed
Construction of a part single-storey, part two-storey dwelling house, detached domestic garage, waste water treatment system, percolation area, site entrance and all associated site worksDecision record indexed
The replacement of the existing pitch lighting with a new floodlighting system consisting of 8no. lighting columns, 18m high and all ancillary site worksDecision record indexed
Construction of 2 no. pre-cast concrete ball walls each 20 metres long x 5 metres high, and AstroTurf surface 71 metres x 20 metres, 5 no. 1200 watt floodlights 15 metres high, mounted on the existing ball net poles and associated site works on the existing parkDecision record indexed
Construction of extensions to the front and side of dwelling, extension to the rear with new roof over existing dwelling to provide an attic storage area with roof lights, fenestration changes and natural stone to dwelling, construction of a domestic garage, raise height of front boundary stone wall to 1.5m and all associated site worksDecision record indexed
Construction of an extension to the side of the existing dwelling, a new porch to the front elevation, stone work to the front elevations and all associated site worksDecision record indexed
The construction of a detached, single-storey dwelling house, detached garage, wastewater treatment system & polishing filter, new site entrance & associated boundary wall and all ancillary site worksDecision record indexed
The construction of a detached, single-storey dwelling house, detached garage, wastewater treatment system & polishing filter, new site entrance & associated boundary wall and all ancillary site worksDecision record indexed