For the construction of a dwelling house, coach-house/garage, wastewater treatment system and new entrance including ancillary site works
For development consists of the construction of a silage slab and associated site works
To construct a new single storey dwelling together with al ancillary site development works and services
To install a new wastewater treatment system and associated percolation area along with ancillary site works
To construct a 2 storey side and rear extension to the existing property
To (a) demolish previously constructed extensions (b) construct new extension and carry out alterations to dwellinghouse (c) Install new septic tank and percolation area together with all associated site development works and services
For the construction of a dwellinghouse, New Entrance, and Proprietary Wastewater Treatment System including ancillary site works
To demolish agricultural structure and to construct a slatted cattle shed and associated site works
To (a) Construct side extension and fenestration changes to existing cottage (b) Construct detached domestic garage together with all associated site development works and services
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
For development which will consist of the construction of a dwelling house, garage a proprietary waste water treatment system and ancillary site works
Permission consequent on the grant of outline permission (Reference No. P22/226) to construct a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house with attached carport and private garage, site entrance, access road, on-site wastewater treatment system and all other associated site works
Of a domestic garage and retention of alterations to existing dwelling house's front elevation and roof.
For development, the development consists of the construction of a slatted unit and associated site works
To construct a store/garage
To construct dwelling house, attached garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a private garage to rear of private dwelling house along with all associated site works and services
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
The construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For demolition of existing damaged dwelling and construction of a new re-designed dwelling house along with all associated works at existing site
To construct single dwelling house with garage, wastewater treatment and percolation area, all associated site works and connections to services and new entrance from public road
For development, the development consists of the construction of a slatted unit and associated site works
The development which will consist of (1) Alterations and extensions to the existing dwelling house (2) The construction of a new garage (3) all ancillary site works
Of the converted garage for domestic use, the connecting porch area, the altered fenestration, internal layout and all associated and ancillary site works
To construct a Private Dwelling House, Wastewater Treatment System / Soil Polishing Filter, Entrance and all associated site works
For development which will consist of (1) The demolition of an existing derelict dwelling house (2) The construction of a new dwelling house and garage with a proprietary wastewater treatment system and ancillary site works
To construct a new dwelling house and a private garage, new entrance and sewerage treatment facilities along with all associated works
For (a) Renovation of the exiting bungalow (b) storey and a half extension to the side of the existing bungalow and all associated site works and connections to existing services
For the thermal upgrade and new front door of the existing cottage and for the construction of a single storey extension to the side of the existing cottage, and for the provision of an effluent treatment system and ancillary services
To (A) alter, extend and renovate existing dwelling house. (B) demolish existing rear sunroom annex. (C) RETAIN existing domestic garden shed including all associated site works & services
For the refurbishment of an existing stone cottage to include provision of thatch roof, timber windows, doors and thermal upgrade of the cottage and for the construction of a single storey extension to the side of the existing cottage, provision of effluent treatment system and ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development as follows: Demolition of existing storage building, construction of extension and alterations to existing dwelling house, construction of detached garage behind house with all associated site works and connections to existing services
To extend existing house at Carrowmeer, Newmarket on Fergus, Co Clare The application consist of a single storey extension to the rear of the existing house and all associated site works
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
For the following; 1. Two storey dwelling including garage structure to rear, 2. new entrance gate, piers and driveway 3. effluent treatment system percolation area and bore well 4. and all necessary site works and services
For development which will consist of the construction of a dwelling house, garage, a septic tank with percolation area and ancillary site works
To revise the boundaries granted under reference P21/408, thus reducing the site area
To construct a new dwelling house, entrance, private garage and install a new wastewater treatment system on an infill site along with all associated works
Of a garage and tennis court to the rear of the dwelling
To construct a single-storey dwelling house, detached garage, entrance, boundary walls, waste water treatment unit and polishing filter and all associated site works
For alterations, changes to elevations and floor area increase to the existing dwelling house including all ancillary site works
To erect a dwelling house, entrance and install an effluent treatment system and percolation area and all associated site works