EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE, THE PORCH TO THE FRONT OF THE HOUSE, SHED TO THE REAR OF THE HOUSE AND ALL ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF EXISTING STORAGE AREA AND CONSTRUCTION OF (A) A 2-STOREY BUILDING AND A SINGLE STOREY BUILDING TO ACCOMMODATE ADDITIONAL CLASSROOMS AND TEACHING SPACES, STORES AND PLANT ROOM AND (B)ADDITIONAL CAR PARKING SPACES AND ALL ASSOCIATED SERVICES AND SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF 5 NO. GLAMPING PODS, RECEPTION BUILDING, CAR PARKING AREA, PROPRIETARY SEWERAGE TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
NÁ IONAD FIONTRAÍOCHTRA A THÓGÁIL INA MBEIDH 4 AONAD GNÓ LE LEITHRIS, CEAINTÍN AGUS INFREASTRUCHTÚR GINEARÁLTA CHOMH MAITH LEIS NA HOIBREACHA LÁITHREÁIN AGUS IONAD CÓIREÁLA FUÍOLLUISCE A BHAINEANN LEODecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF EXISTING HABITABLE HOUSE AND SHED (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REVISED HOUSE DESIGN AND MINOR RELOCATION OF HOUSE AND GARAGE POSITION FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 21/51795 AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A SINGLE STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF NEW ENTRANCE PORCH TO THE FRONT OF THE EXISTING HOUSE, (2) ANCILLARY ACCOMMODATION FOR THE DWELLING HOUSE IN THE EXISTING FIRST FLOOR OF THE DETACHED GARAGE AND (3) CREATION OF A CAR PORT BETWEEN THE EXISTING HOUSE AND THE DETACHED GARAGE AND ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A SINGLE STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
DEMOLITION OF AN EXISTING DWELLING HOUSE AND ERECTION OF A REPLACEMENT DWELLING HOUSE, CONNECTION TO AN EXISTING SEPTIC TANK AND PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
TEACH CÓNAITHE ÚR, GARÁIST SCOITE TÍ, DABHACH SÉARACHAIS/CÓRAS CÓIREÁLA SÉARACHAIS A THÓGÁIL, CHOMH MAITH LE HOIBREACHA FORBARTHA GAOLMHARA DO TSUÍOMHDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH ASSOCIATED SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) ERECTION OF A SINGLE STOREY DWELLING AND GARAGE WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, (2) RELOCATION OF EXISTING PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
CREATION OF A NEW ENTRANCE AND ACCESS LANE FOR DWELLING FOR WHICH PLANNING IS CURRENTLY BEING SOUGHT UNDER PLANNING REFERENCE NO. 24/60311 AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF (1) A NEW SINGLE STOREY BEDROOM EXTENSION (12.9M2) TO THE FRONT OF EXISTING DWELLING, (2) A NEW DORMER WINDOW WITH BALCONY AT FIRST FLOOR LEVEL TO THE FRONT OF EXISTING DWELLING, REPLACEMENT OF EXISTING BEDROOM WINDOW WITH NEW DOUBLE DOORS TO THE FRONT OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSGrounds not yet categorised
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDSGrounds not yet categorised
(1) RETENTION AND COMPLETION OF (A) UNIT 1 AS ACCESSIBLE ACCOMMODATION, UNITS 10 & 11 AS ACCOMMODATION, UNIT 12 AS BOOT ROOM / DRYING ROOM AND THE PROVISION OF THE ACCESSIBLE WC ROOM, (B) LIGHT AND VENTILATION WINDOWS ADDED ON NORTH ELEVATION TO UNITS 1-5 INCLUSIVE, (C) EXTERNAL CEDRAL CLADDING TO UNITS 1-13 INCLUSIVE, (D) INTERNAL ALTERATIONS TO PROVIDE ESCAPE CORRIDOR TO STAIRS SERVING FIRST FLOOR DINING ROOM, (E) REFURBISHMENT OF EXISTING PASSAGE TO ACCOMMODATION UNITS AND PROVISION OF ACCESSIBLE PASSAGE TO UNIT 1 ACCOMMODATION AND WC ROOM, (F) INCREASED HEIGHT TO THE CONCRETE BLOCK RETAINING WALL ALONG THE NORTH ELEVATION TO UNITS 1 -5 INCLUSIVE WITH POCKET - OPENINGS AT WINDOWS, (G) THE AS-CONSTRUCTED METAL FENCING TREAMENT TO THE NORTH ELEVATION TO THE ACCESSIBLE PASSAGE, (H) THE DWARF WALL TO THE BOUNDARY OF THE CAR PARK WITH THE PUBLIC ROAD, THE SET-BACK FOR PEDESTRIAN WALKWAY, THE PEDESTRIAN WALKWAY AND THE PUBLIC ROAD CROSSING ALL AS-CONSTRUCTED INCLUDING MATERIALS AND COLOUR, AND (I) THE AS-CONSTRUCTED CAR PARK LAYOUT SAVE THE OMISSION OF THREE EXISTING CAR-PARK BAYS TO FACILITATE MINI-BUS PARKING AND BICYCLE STANDS, (2) ADDITIONAL LIGHT AND VENTILATION WINDOW TO NORTH ELEVATION WALL ON UNIT 6 ACCOMMODATION, (3) VELUX KERB ROOF-LIGHT WINDOWS TO UNITS 8-12 INCLUSIVE IN LIEU OF PERMITTED ROOFLIGHTS, (4) TWO ADDITIONAL EXTERNAL WALL-MOUNTED SIGNS IN THE IRISH LANGUAGE, (5) ALTERATIONS TO THE EXISTING CAR-PARK LAYOUT, ENTRANCE / EXIT / TURNING TO INCLUDE PROVISION FOR MINI BUS PARKING, ADDITIONAL BICYCLE STANDS AND STAFF PARKING TO BE REAPPOINTED TO THE REAR OF THE CAR PARK AND (6) ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) EXTENSION TO RUSTY MACKEREL BAR COMPRISING OF KITCHEN & DRINK STORE, (2) FIRST FLOOR SEATING AREA, (3) 13 NO. BEDROOMS AND 1 NO. STAFF ROOM\LAUNDRY ROOM, (4) RETAINING WALL REPLACING EXISTING RETAINING WALL, (5) EXCAVATION & ROCK BREAKING TO SIDE & REAR OF EXISTING BAR, (6) EXCAVATION & INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM, (7) EXTENSION & ALTERATIONS TO EXISTING CARPARK INCLUDING REPLACEMENT OF BOUNDARY WALL, (8) BEER GARDEN INCLUDING COVERED SHELTER WITH RETRACTABLE ROOF & BI-FOLD DOORS, (9) STORAGE UNIT & GAS TANK INSTALLATION, (10) ASSOCIATED LANDSCAPING AND ANCILLARY WORKS AND PERMISSION FOR CONSTRUCTION OF ADDITIONAL CAR PARKING TO FACILITATE THE DEVELOPMENT INCLUDING ALTERATIONS TO EXISTING CAR PARKDecision record indexed
COMPLETION OF A DWELLING HOUSE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS PREVIOUSLY APPROVED UNDER PLANNING REF: 04/1547Decision record indexed
CONSTRUCTION OF A NEW PRODUCTION FACILITY FOR THE MANUFACTURE OF COSMETIC PRODUCTS FROM SEAWEED, SEPTIC TANK & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND RETENTION PERMISSION FOR CHANGE OF USE OF PART OF EXISTING DWELLING HOUSE TO A PRODUCTION FACILITY FOR THE MANUFACTURE OF COSMETIC PRODUCTS FROM SEAWEEDDecision record indexed
(1) DEMOLITION OF PART OF THE EXISTING COMMERCIAL BUILDING (2) CONSTRUCTION OF AN EXTENSION TO THE SIDE EXISTING COMMERCIAL BUILDING WHICH WILL COMPRISE OF A SHOP AT GROUND FLOOR LEVEL AND CAFE/RESTAURANT AT FIRST FLOOR LEVEL WHICH SHALL ALSO INCLUDE A FIRE ESCAPE STAIRWELL (3) CONSTRUCTION OF A STORE ROOM TO THE REAR OF EXISTING PROPERTY INCLUDING CHANGES TO THE ELEVATIONS OF EXISTING COMMERICAL BUILDING (4) DECOMMISSIONING OF EXISTING WASTEWATER TREATMENT PLANT AND INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED TERTIARY TREATMENT BY WAY OF PURAFLO MODULES (5) PROVISION OF CAR, BICYCLE, BUS AND MINI-BUS PARKING FACILITIES INCLUDING PROVISION OF FOOTPATHS AND PUBLIC LIGHTING AND (6) ERECTION OF ALL SIGNAGE TO THE BUILDING AND ADVERTISING STRUCTURE AND FOR ALL ASSOCIATED ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE OF EXISTING PROPERTY INCLUDING CHANGES TO THE ELEVATIONS AND (2) ERECTION OF A RETRACTABLE GAZEBO TO THE FRONT OF EXISTING OUTDOOR PATIO AREA AND ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
(A) DEMOLITION OF EXISTING DWELLING HOUSE DUE TO DEFECTIVE BLOCKS, AND (B) ERECTION OF REPLACEMENT DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
INSTALLATION OF AN UNDERGROUND WATER TANK WITH PIPEWORK TO A PROPOSED GENERATOR ROOM TO BE CONSTRUCTED ADJACENT TO EXISTING DWELLING HOUSE FOR A SMALL HYDRO POWERED GENERATOR FOR DOMESTIC USE AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE AND INSTALLATION OF A PROPRIETARY SEWERAGE TREATMENT SYSTEM, PERCOLATION AREA AND COMPLETION OF A DOMESTIC GARAGE PREVIOUSLY GRANTED UNDER PLANNING REF: 11/20079 AND ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A NEW DWELLING HOUSE WITH SEPTIC TANK INCLUDING A DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS UTILISING EXISTING FOUNDATIONS ALREADY APPROVED UNDER PLANNING REF NO. 03/755Decision record indexed
(1) RETENTION OF STOREY AND HALF EXTENSION TO SIDE OF EXISTING STOREY AND HALF DWELLING HOUSE WITH CONNECTION TO EXISTING SEWAGE TREATMENT PLANT AND (2) ERECTION OF NEW DOMESTIC GARAGE TO SIDE OF EXISTING DWELLING HOUSEDecision record indexed
(1) DEMOLITION OF EXISTING REAR EXTENSION AND EXISTING FRONT PORCH (2) CONSTRUCTION OF (A) A NEW SINGLE STOREY REAR EXTENSION (B) A NEW SINGLE STOREY FRONT PORCH EXTENSION (3) MINOR ELEVATIONAL CHANGES TO EXISTING DWELLING AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) CONSTRUCTION OF AN EXTENSION TO THE BACK OF THE HOUSE, A NEW PORCH TO THE FRONT AND RENOVATIONS TO THE HOUSE, (2) INSTALLATION OF A NEW PROPRIETARY SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed