24, Greenfield Park, Donnybrook, Dublin 4 D04 H1F9
(1) Widening of existing Vehicular access, (2) reopening of existing pedestrian entrance with installation of gate (3) 6 No. Dormers (2 to rear & 4 to front/side (4) single storey extensions to rear/side, (5) demolition of existing single storey extension to rear & chimney stacks (6) Change of roof profile from flat roof to pitched roof to existing garage & extension of garage to rear to accommodate shed & minor alterations to fenestration to existing house and all associated site worksDecision record indexed
5-year permission for development at a site of total c.10.87 ha on lands located at Cornamaddy, Athlone, Co. Westmeath. The site is generally bounded to the west by greenfield lands and Cornamagh Cemetery, to the north by greenfield lands, to the south by greenfield lands and the Ballymahon Road (N55) and to the east by the existing Drumaconn housing estate. The development will comprise of a residential development and public open space comprising the following: • Amendments to permitted application WMCC Reg Ref. 14/7103 ABP Ref. PL25.244826 for the removal of 38 no. permitted units (not constructed) to be replaced by: Construction of 70 no. residential units comprising: 4 no. 2 bed terraced houses (c.78 sq.m each), 60 no. 3 bed semidetached (c. 96-116 sq.m each) and 6 no. 4 bed semidetached houses (c. 147 sq.m each) with associated private gardens. • The creche facility, public open spaces, landscaping, roads layouts, car parking, boundary treatment works, public lighting and all associated site works associated with the 87 no. remaining units retained as permitted under WMCC Reg Ref. 14/7103 ABP Ref. PL25.244826 will remain unchanged. • All pedestrian and vehicular access roads and footpaths including a section of the planned east/west distributor road connecting to a sections of the distributor road permitted under WMCC Reg. Refs 14/7103 ABP Ref. PL25.244826 and 22/253 to the east of the site. • All associated site development works, services provision, drainage works, public open space (c.1.03ha), landscaping, boundary treatment works, public lighting, associated esb substation cabinets, bin stores, car and bicycle parking provision. • This development will form part of a larger/future phase of the development. • This planning application is accompanied by an Environmental Impact Assessment Report and Natura Impact StatementDecision record indexed
Permission for development which consists of (1) Retention permission for subdivision of property to form a separate dwelling house attached to existing semi-detached dwelling house (No. 14 Lakeview Road) including modification to Condition 2 of the existing planning permission (Galway City Council) reference: 22/117 to facilitate that subdivision; and, (2) Planning permission for modification to existing vehicular entrance and provision of a new separate vehicular entrance and all associated site development worksGrounds not yet categorised
Permission to construct a one and a half storey dwelling with attached double garage, new entrance, bored well, waste water treatment system & percolation area with all associated site works17 conditions indexed
Outline permission to erect a two storey dwelling house, single dwelling septic tank with percolation area and all associated works. Access to the site via a new entrance to greenfield siteGrounds not yet categorised
Our Lady of Lourdes National School, Greenfields Rosbrien, Limerick
The development will consist of a two-story extension housing a lift on the North elevation, together with all other associated site worksDecision record indexed
Demolition of extensions erected to the rear of the existing cottage and to replace with a new extension, renovate the existing cottage and erect a front porch, replace the existing septic tank with a new wastewater treatment tank and percolation system and to include all ancillary worksDecision record indexed
5-year permission for development at a site of total c.1.13ha on lands located at Cornamaddy, Athlone, Co. Westmeath. The site is generally bounded to the west by greenfield lands and Cornamagh Cemetery, to the north by greenfield lands, to the south by greenfield lands and the Ballymahon Road (N55) and to the east by the existing Drumaconn housing estate. The development will consist of modifications to the permitted application WMCC Reg. Ref. 14/7103/ ABP Ref. PL25.244826 and concurrent application WMCC Reg. Ref. 22/577 to include the following: • Removal of the permitted creche c.260sqm and associated parking granted under WMCC Reg Ref. 14/7103/ ABP Ref. PL25.244826. The recently permitted creche granted under WMCC Ref. 22/340 will regularise childcare provision on site. The remaining area will form part of the public open space associated with the wider development at Cornamaddy (c.710sqm). Associated minor landscape revisions to the concurrent application WMCC Reg. Ref. 22/577; • Provision of 6 no. additional houses comprising 4 no. Type A1 4-5 bed 2-3 storey semi-detached units (c.166sqm area each) and 2 no. Type B 3 bed 2 storey semi-detached units (c.113sqm area each). All with associated rear gardens and 2 no. parking spaces per unit. No new house types are proposed under this application; • Relocation and minor alterations including changes to the floor levels, house plots and associated gardens and boundary treatments of the remaining units comprising 4 no. Type A1 4-5 bed 2-3 storey semi-detached units (c.166sqm area each), 2 no. Type B 3 bed 2 storey semi-detached units (c.113sqm area each), 1 no. Type D 5 bed 2-3 storey detached unit (c. 215sqm area) and 2 no. Type E1 3 bed 2 storey semi-detached units (c.112sqm area each) permitted under WMCC Reg. Ref. 14/7103/ ABP Ref. PL25.244826. No changes to the permitted floor area of these units; • Minor modifications to the concurrent application WMCC Reg. Ref. 22/577 to include reconfiguration and relocation of the main access roads south of the planned distributor road. Readjustment of the internal shared access road parallel to the distributor road permitted under WMCC Reg. Ref. 14/7103/ ABP Ref. PL25.244826; • All associated site development works, services provision, connection to water services and connection to the section of the distributor road proposed under WMCC Reg. Ref. 22/577, public open space (c.600sqm), landscaping, boundary treatment works and car parking provisionDecision record indexed
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permitGrounds not yet categorised
(1) Provision of new trailer storage yard (0.9169 Ha) to the east of the site replacing greenfield lands to accommodate 33 No. trailers parking spaces. This will be an extension of the existing trailer park and the combined number of trailers on the overall site will be 83. (2) Change of use of restaurant building (842 sqm) into storage use along with a new internal configuration arising from internal demolitions and undertaking minor elevation changes. (3) Installation of 22 No. storage containers (2.6m high). (4) Provision of wastewater treatment system and associated percolation area. (5) Provision of new fencing. (6) All associated site worksDecision record indexed
Permission for development which consists of; (A) Retention of the existing single story side annex, formerly a domestic garage, and conversion into an extension of the existing house habitable space. (B) Permission for an optional pitched roof over the single story side annex mentioned above, (C) various external elevation changes to the existing house and garage and (D) all associated building works and site works.Decision record indexed
Proposed ground floor garage conversion with bay window with pitched roof over to front of dwelling; Proposed first floor side extension with pitched roof over & 1 roof light on rear slope of roof at attic level.Decision record indexed
Expanded vehicular parking (c. 238m2) to the south east portion of the site into a former greenfield area (permission); roof cover (c. 60m2) (permission) over customer sit-down area including wooden benches for customer recreation and dining purposes (c. 60m2) (retention permission); 7 no. open container storage sheds (c. 99m2 in total) along the western boundary of the curtilage of this site, adjacent to the service station building, for the storage and display of retail goods (retention permission); prefabricated single storey wooden building (c. 70m2) for security accommodation in the south-western portion of site (retention permission); prefabricate wooden shed (c. 13.5m2) for storage use adjacent to western elevation of the single storey wooden building (retention permission); wastewater treatment services (c. 1.54m2) to serve the prefabricated chalet style building for (retention permission); and all associated ground hard core, paving and soft landscaping worksGrounds not yet categorised
A soil recovery facility comprising the infilling of a 6.01 hectare site with greenfield soil and stone and all associated site works and services required to facilitate the developmentDecision record indexed
Townlands of Moortown and Crodaun, Celbridge, Co. Kildare.
A 9.8 Ha site in the townlands of Moortown and Crodaun, Celbridge, County Kildare, including part of the carpark serving Blocks C and D of the M4 Interchange Business Park and a dwelling known as “Mariposa”. The lands are generally bounded to the north by the M4 Motorway; to the east by greenfield lands; to the south-east by the Celbridge Community School and M4 Business Park beyond; to the south and south-west by Unit 1 Esprit Logistics Park, the R405 with residential dwellings and Salesian College beyond; and to the west by Blocks C and D of the M4 Interchange Business Park. The development, which will have a gross floor area of 27,034 sq m, will comprise the demolition of an existing dwelling known as “Mariposa” (c.270 sq.m) and the construction of 11 No. Warehouse and Light Industrial units with ancillary offices, staff facilities and associated development as follows; Unit A (Warehouse) will have a maximum height of 16 metres with a gross floor area of 2,708 sq m including a warehouse area (2,221 sq m), ancillary office areas and staff facilities (487 sq m); Unit B (Warehouse) will have a maximum height of 16 metres with a gross floor area of 2,622 sq m including a warehouse area (2,296 sq m), ancillary office areas, and staff facilities (326 sq m); Unit E (Light Industrial) will have a maximum height of 10 metres with a gross floor area of 1,298 sq m including a warehouse area (1,151 sq m), ancillary office areas and staff facilities (147 sq m); Unit F (Light Industrial) will have a maximum height of 10 metres with a gross floor area of 1,237 sq.m including a warehouse area (1,097 sq m), ancillary office areas and staff facilities (141 sq.m); Unit G (Light Industrial) will have a maximum height of 10 metres with a gross floor area of 1,500 sq m including a warehouse area (1,359 sq m), ancillary office areas and staff facilities (141 sq m); Unit H (Light Industrial) will have a maximum height of 10 metres with a gross floor area of 1,789 sq m including a warehouse area (1,649 sq m), ancillary office areas and staff facilities (141 sq m); Unit I (Light Industrial) will have a maximum height of 16.2 metres with a gross floor area of 2,512 sq m including a warehouse area (2,222 sq m), ancillary office areas and staff facilities (290 sq m); Unit J (Light Industrial) will have a maximum height of 16.2 metres with a gross floor area of 2,868 sq m including a warehouse area (2,579 sq m), ancillary office areas and staff facilities (289 sq m); Unit K (WareDecision record indexed
Junction of the Childers Road /Greenfield Road, Rosbrien Limerick (Townland of Ballinacurragh Weston), County Limerick
A residential development comprising a four-storey apartment block consisting of 21 apartments, storage for bins, bikes and lock ups and all ancillary site development works to include connections to the public water main, foul and surface water drainage, access roads, footpaths, vehicle parking, landscaping, boundary treatments and site development works above and below ground on lands at the at the Junction of the Childers Road /Greenfield Road, Rosbrien, Limerick in the Townland of Ballinacurragh Weston. The scheme also involves setting the proposed scheme boundary wall along the Greenfield Road further into the applicant’s site to allow for future potential road upgrades along Greenfields RoadDecision record indexed
Lands To The North Of The Roundabout on the R148/Dublin Road, Johnstown, Enfield Co. Meath
The site is generally bound as follows: to the north by agricultural greenfield; to the east by agricultural greenfields and an unoccupied cottage; to the south by the R148/Dublin Road and roundabout; and to the west by lands on which a consented post primary school (MCC Reg Ref: TA201224) and a consented nursing home (MCC Reg Ref EOD 211488) are to be delivered. The development will consist of: The construction of a mixed-use development including a 4 storey over ground floor level mixed use building (c.7,953 sq. m) comprising ground floor lobby (c.169 sq. m), bulky goods retail at ground (c.1,062sq,m) and first floor (c.l,219sq.m), ground floor cafe (c.304 sq. m), ground floor gym (c.352sq. m), first floor health centre (c.822 sq. m), second, third and fourth floor office and conference space (c.2,733 sq. m), core, circulation and plant facilities across all levels (c.1,292 sq.m) and 227 no. car and 80 no. cycle parking spaces to serve the building; 80 no. residential units comprising 1 3 no. 2 storey four-bedroom terraced housing units, 67 no. 2 storey three bedroom terraced housing units with associated private open space in the form of rear gardens and terraces, 164 no. car and 320 no. cycle residential parking spaces plus 60 visitor cycle parking spaces; c.4,224 sq. m of landscaped public open space; a 2 storey creche facility (c.400 sq. m) with 12 no. car parking spaces; green roofs; solar panels; a two-lane access road linking the development to the roundabout where the R148 meets Dublin Road, providing 2 no. multimodal, priority-controlled junctions and segregated pedestrian and cyclist facilities with a controlled crossing; provision of roadway to access the development from the south via the existing roundabout on the Dublin Road; an internal road and shared surface network, including walkways and its associated infrastructure; watermain, foul and surface water drainage, extension to the proposed foul network and connection to the pump station (permitted under ABP-308357- 20), extension to the proposed watermain, connecting to the existing DN 300 HDPE adjacent to the R148 roundabout, an attenuation pond at the north east of the site (1770 sq.m); and all other ancillary site development works including hard and soft landscaping, boundary treatments, lighting, SuDs, and above and below ground services to facilitate the development. Significant further information/revised plans submitted on this applicationDecision record indexed
The importation of material to in-fill and re-contour the subject site at Thomastown, Johnstownbridge, Co. Kildare. Once the importation is complete the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.689ha of the total site. The 3.689ha is divided into two distinct areas - Area 1 is 2.718ha and Area 2 is 0.971ha. A fill plan has been drawn up for the importation of ca. 103,455 tonnes of soil to fill Area 1, and ca. 25,005 tonnes to fill Area 2, equating to a total of ca. 128,460 tonnes of soil and subsoil. Permission is being sought for a 5-year period (ca. 25,692 tonnes per annum) and will be subject to a waste facility permit. The application is accompanied by an Environmental Impact Assessment Report (EIAR)Grounds not yet categorised
For a fully serviced two storey hipped tiled roof extension with partial single storey hipped tiled roof extension to the front of the existing house, alterations internally on both floors to allow the new layout, roof lights in the existing roof front and rear, minor alterations to existing glazing. Maintain existing connection to soil and surface water and all ancillary site worksDecision record indexed
A single storey kitchen extension and domestic garage and planning permission for the conversion of the garage and change of use into a home studioDecision record indexed
Attic conversion for storage with dormer window to the rear; Raised gable to the side; 2 Velux windows to the front, new gable window to the side.Decision record indexed
Doirin Alainn Baile Mhuirne Derreenaling, Ballyvourney Co.Cork
The development will consist of a soil recovery facility for greenfield soil and stones with smaller quantities of concrete, bricks, tiles, and ceramics (the concrete, bricks, tiles, and ceramics will be used for internal road building). The proposed development will involve the remediation by infilling of existing agricultural land which was historically excavated in the past. The site comprises 1.58 hectares, of which 1.09ha will be fill area. The proposed development incorporates improving the existing site entrance, and all ancillary works associated with the developmentDecision record indexed
Of development which consists of: Front entrance porch, rear extension, steel shed in rear garden, alterations to window layout and colour, solar panels on front/south roof and all associated site worksDecision record indexed
Greenfield Shopping Centre, Maynooth Park, Maynooth
(i) alterations to the existing single storey shopping centre including the provision of a new cafe unit (130sq.m) at ground floor level with an associated outdoor seating area, fronting Straffan Road to the west; provision of a new retail unit (54sq.m) at ground floor level, located adjacent to the south-eastern site boundary; and alterations to the existing signage and elevational treatment of the existing retail/commercial units; (ii) the extension of the existing structure to provide for 24 no. build-to-rent apartments on first to third floor levels comprising: 9 no. one-bedroom units, 13 no. 2-bedroom units, and 2 no. three-bedroom units all of which will be served with private amenity space in the form of balconies/terraces. The proposed residential units will be located above the existing shopping centre and proposed commercial/retail units. Communal facilities/amenities are provided to serve the proposed residential units including a concierge office at ground floor level, a common room at first floor level and landscaped communal roof terraces at first floor level (342sq.m) and second floor level (250sq.m). The proposed development will also include: (iii) alterations to the existing surface car parking to provide for a total of 43 no. car parking spaces (including 2 no. accessible parking spaces and 1 no. go-car car-share space), a new deliveries area is also proposed to the front of the existing commercial units at ground floor level; (iv) provision of a total of 76 no. bicycle parking spaces at surface level; (v) alterations to the existing main vehicular entrance off Maynooth Park and internal road layout; (vi) provision of new footpaths and pedestrian circulation space; (vii) provision of a bicycle and bin store adjacent to the northern site boundary, with access available from Straffan Road; (viii) provision of a bin store to the rear of the proposed retail unit at ground floor level; and (ix) landscaping, boundary treatments, signage, infrastructural works, foul and surface water drainage, ESB substation, ESB room and Water Storage room and all associated site works necessary to facilitate the proposed developmentGrounds not yet categorised
Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161); (2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation.Decision record indexed
Permission for development which will consist of retention of amendments to previously approved development under planning reg. reference 356/99. This includes the following: (a) Additional Velux roof light to the front, (b) Enclosed front porch with roof amended from previously approvedDecision record indexed
Lands at Knockgriffin (Imokilly) and Water Rock Midleton Co.Cork
We, EMR Projects Ltd, intend to apply for permission for development at this site (6.7 ha) on existing greenfield lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork. The application site is bounded by existing fields in agricultural use to the north, the Nordic Enterprise Park to the east, the Cork to Midleton rail line to the south and two dwelling houses to the west accessed via Castle Rock Avenue. The development will consist of the demolition and removal of existing derelict buildings, structures, outbuildings and hardstanding (total 842sq.m) and the construction of a mixed-use scheme comprising 284no. residential units, a Childcare Facility, a Retail unit, a Café unit, a Medical clinic, Office units and all associated ancillary accommodation, site and development works. The residential units will contain 214no. apartment/duplex units comprising 138no. one-bedroom units, 64no. two-bedroom units and 12no. three-bedroom units and 70 no. houses comprising 13no. two-bedroom dwellings, 53no. three-bedroom dwellings, and 4no. four-bedroom dwellings. The total gross floorspace (GFA) of the overall development is 38,945sq.m of which 31,420sq.m is residential (including 4,070sq.m undercroft car park for Block C and Block D) and 7,525sq.m is non-residential. The development is described below on a block by block basis as follows: Block A (1,237sq.m GFA): 5 storey apartment building consisting of 14no. apartment units comprising 6no. one-bedroom units and 8 no. two-bedroom units with ancillary accommodation, associated private balconies, communal open space (183sq.m) at ground floor level, 15no. car parking spaces, 3no. visitor car parking spaces, 22no. secure and covered cycle parking spaces in a designated bike store (18sq.m) located externally at ground floor level and 8no. visitor cycle parking spaces and associated communal bin stores (9sq.m). Block B (1,237sq.m GFA): 5 storey apartment building consisting of 14 no. apartment units comprising 6 no. one-bedroom units and 8 no. two-bedroom units with ancillary accommodation, associated private balconies, communal open space (178sq.m) at ground floor level, 16no. car parking spaces, 3no. visitor car parking spaces, 22 no. secure and covered cycle parking spaces in a designated bike store (18sq.m) located externally at ground floor level and 8no. visitor cycle parking spaces and associated communal bin stores (9sq.m). Block C (9,585sq.m GFA): 6 storey apartment building consisting of 100no. IndeDecision record indexed
Permission for development which will consist of the construction of a two storey extension to the side of existing dwelling house and to convert garage to study roomDecision record indexed
353 Old Greenfield, Maynooth, Co. Kildare W23 Y2T0.
A single storey porch extension to the front of the existing house, a new site entrance from Old Greenfield including garden walls, piers, 2 surface parking spaces in the front garden, and all associated site worksDecision record indexed
Permission for development which will consist of 1)Permission to demolish the existing semi-detached building and front boundary wall. 2) Permission to construct a new 3 storey residential development consisting of 3nr 2 bed and 3nr 1 bed apartments. 3) Permission for 4nr car park spaces to the front of the building. 4) Permission for all external works and landscaping including accessing the exiting sewage connection for foul and surface water and any associated works at the above address.Grounds not yet categorised
The construction of a vehicular entrance and parking area, a new dished section to the existing public footpath, minor amendments to my boundary wall and all ancillary worksDecision record indexed
280a Old Greenfield, Maynooth, Co. Kildare W23 Y2H5.
Development at this site: The rear of 280a Old Greenfield, Maynooth, and part of adjacent site previously approved Reg. Ref. 19/1155 with shared access onto Silken Vale. The development will consist of the construction of 2 detached two storey 4 bed houses in the rear garden of 280a Old Greenfield, Maynooth, with vehicular access off Silken Vale Road which was previously approved Reg. Ref. 19/1155, and all associated site worksDecision record indexed
(1) RETAIN CHANGE OF USE OF PART OF RETAIL SHOP TO FULL OFF LICENCE, (2) RETENTION PERMISSION TO RETAIN TIMBER CLAD HOUSING TO AIR CONDITIONING UNITS (3) RETENTION PERMISSION TO RETAIN ELEVATIONAL CHANGES INCLUDING FRONT ENTRANCE PORCH, (4) RETENTION PERMISSION TO RETAIN SIGNAGE AND ASSOICATED STRIP LIGHTING TO ELEVATIONS OF BUILDING (5) RETENTION PERMISSION TO RETAIN EXTERNAL SEATING AREA, (6) RETENTION PERMSISION TO RETAIN EXTRACTION DUCTING, ALL IN ACCODANCE WITH PLANS AND PARTICULARS SUBMITEDDecision record indexed
1, Greenfield Park, Donnybrook, Dublin 4, D04 HIX7
Planning permission for the development will consists of alterations and extensions to the existing dwelling to provide a 5 bedroom two storey over basement family home. The works include demolition of single storey garden shed (c.31.8m2); construction of part single storey and part two storey over basement extension to north east elevation; alterations and extension to existing attic level including new roof lights and dormer window to rear; new single storey garden shed to west boundary; internal refurbishment and remodelling works to existing dwelling all associated landscaping, boundary treatments, SUDS drainage and all other ancillary site development works necessary to facilitate the development on site.Decision record indexed
Development will consist of amendments to permission (Ref. 21/1796). The amended development will consist of (1) Removal of the single storey converted garage to side and sunroom to the rear of house. (2) Construction of single storey extensions to the front and rear, a two storey extension to the side, and 2 No. roof lights installed to the rear of the house. (3) Roof mounted solar PV panels installed to the front and rear. (4) The proposed works will involve a general external façade upgrade and internal alterations to the house, along with all associated site development worksDecision record indexed
The development will consist of: (a) Partial demolition of existing house; (b) Two-storey plus attic level pitched-roof extension to front; (c) Two-storey plus attic level part pitched-roof and part flat-roof extensions to side (south-west); (d) Lift enclosure extension to side (north-east) on existing pitched roof; (e) Conversion of part of existing attic level; (f) 7 No. Velux roof lights to pitched roofs; (g) 1 No. roof light/access hatch to flat roof; (h) Widening of vehicular access and provision of new entrance gates; (j) car turntable to front garden; (k) Related site development and external works.Decision record indexed
Demolition of façade and roof of central portion of existing restaurant area (conservatory structure). Provision of replacement elevation consisting of new masonry and glazed façade to match existing main building and new replacement roof consisting of pitched roof over with tiling to match existing main building. New 29sq.m external canopy in front of new façade, to form external seating area. Minor internal modifications, including removal of an internal wall in the restaurant area to create full open plan. Provision of new trailer storage yard (0.7215Ha) east of the existing car park replacing greenfield lands to accommodate 50 no. trailers including new fencing with entrance gates. New fencing around the existing foul drainage infrastructure to the east of the site. All associated site development works, including 2 no. car park spaces, 17 no. HGV parking spaces (involving removal of 8 car park spaces), 12 no. cycle spaces and new percolation system. Retention permission is sought for a single storey, storage area (62m2)Decision record indexed