Demolition of existing single storey living room extension and storage shed both to rear of dwelling and replacement with new single/two storey extension to rear and side of dwelling; reconfiguration of internal layouts of ground floor of existing house including raising first floor level and existing ridge level of roof; addition of bedroom dormer windows and feature entrance to front of dwelling including al associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.
(i) Demolition of an existing two storey, three bedroom dwelling and storage shed; (ii) construction of a new replacement two storey, detached four bedroom contemporary dwelling with a roof terrace to rear and roof lights; (iii) new side garden wall to the south-west; (v) new landscaping, SUDS drainage and all associated site and ground works necessary to facilitate the development.
Minor alterations to existing elevations and internal layout; demolition of an existing single storey living room extension & storage shed both to rear of dwelling and replacement with new single two storey extension to rear and side of existing dwelling; all associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.
Replacement of an existing 15m telecommunications monopole support structure (overall height of 17.8 metres), previously granted by Ref. SD13A/0104) with a proposed new 15m telecommunications lattice tower (overall height of 17.8 metres) carrying the telecommunications equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets and fencing; The site is within the curtilage of a Protected Structure (RPS: 311 -Rathcoole Garda Station).
Provision of a temporary primary school by way of construction of 2 prefabricated buildings (c 180sq.m & 390sq.m) on a defined site area (c 0.4Ha) to be enclosed within a 2 metre high welded mesh fencing and access gates with associated site works including provision of new site entrance, car parking, drop off area and hard surface play area. Temporary permission for a period no longer than 3 years is being sought.
New primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.
Proposed 2 storey 3 bedroom house with new waste water treatment system and new entrance drive off old Newcastle Road.
Single storey extension to rear, dormer loft extension to attic level to rear with solar panels to roof, two storey extension to side, energy upgrade and modifications to existing structure, rooflight to front roof ancillary works.
The development will consist of A) minor demolition to the existing house to form new door open to the proposed extension, B) Minor demolition and alterations to the existing garage, C) The construction of a new single storey flat roof extension to the rear of the existing garage, and D) All associated site works.
Renovation and extension of the existing house to include the demolition of a projecting two storey front entrance structure (7sq.m) and of a splayed two storey corner to the rear of the house (7sq.m); construction of ground floor extensions (17.6sq.m total) including a replacement single storey entrance extension to the front (9sq.m) and single storey extensions to the side (southwest) and rear facades (2.6sq.m and 6sq.m respectively); construction of a new dormer window to the rear at attic level (1.7sq.m); septic tank and percolation area upgrade; extension of rear terrace; renovations to the existing single storey garage and associated site works.
The development is comprised of a single storey extension to the rear, two storey extension to side, energy upgrade and modifications to existing structure and all ancillary works
Demolition of existing sunroom, balcony, external sheds, boiler-house and decking; Construction of new part two storey, part single storey extension to rear and side of dwelling measuring a combined total of 155sq.m additional internal floor area; Construction of new garage to lower ground floor measuring a total of 71sq.m additional internal floor area; Utilisation of existing under croft located on lower ground floor for use as a non-habitable storage and associated plant measuring a total of 41sq.m internal floor area; Construction of a new dormer to front of property; Construction of new rooflights to rear of property; Installation of PV panels to rear of property; Alterations to existing entrance piers, consisting of replacement of existing signage and re-rendering; External works including provision of external patio and outdoor pergola; Construction of new external terrace to front of property; Associated site services landscaping, planting, drainage works and site services; Retention is also sought for partially complete works granted under Reg. SD04B/0030; Retention of existing dormers to front of property to include re-cladding; Retention of facade alterations.
The Development consists of 1. Single Storey extension to rear of property. 2. First floor Extension to the side of the existing 2 storey house 3. Installation of rooflights to the front and rear planes and construction of gable roof
The development will consist of sub division of the existing corner house site to allow for construction of a new two storey, 2 bed dwelling with existing access from the road off Beechwood Lawns for car parking, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The works also include demolition of two existing garden sheds to the existing site to make way for the new dwelling.
Subdivision of the existing corner house site to allow for construction of a new two storey dwelling with new access from the road off Beechwood Lawns for two car parking spaces, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The existing dwelling rear garden space will be altered as part of the works and shall include demolition of two existing garden sheds to make way for the new dwelling.
Remove sections of existing grass margin and grass verge and extend concrete apron to front and rear of existing public footpath, install accessible kerb and erect of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 No. LED illuminated Advertising Panels each of 2.0 square metre area.
The construction of a split level single storey dwelling (199 sq.m.) with a detached garage (40 sq.m.), an on-site proprietary waste water treatment plant and percolation area, modifications to existing agricultural entrance at the L2019 to access the proposed dwelling and all ancillary site development works
Construction of a two-storey rear extension to existing dwelling, with internal modifications to include a family flat at ground floor level and an ensuite bedroom at first floor level, the installation of a new rooflight to the front elevation, and all associated site works.
The development will comprise the provision of a warehouse with ancillary office and staff facilities. The warehouse will have a maximum height of 19.2 metres with a gross floor area of 34,737 sq m, including warehouse area (32,404 sq m) and ancillary office and staff facilities area (2,333 sq m). The development, which will have a total Gross Floor Area of 34,999 sq m, will also include: 1 No. multi-modal entrance to the site from Greenogue Logistics Park; 156 No. car parking spaces; HGV parking spaces and yard; 90 No. covered bike parking spaces; dock levellers; green walls, sprinkler tank and pumphouse (219 sq m); ESB substation (43 sq m); gates; hard and soft landscaping and boundary treatments; and all associated site development works above and below ground.
New vehicular entrance to existing farm including the construction of new 1.8 metre high pillars and the erection of a new roller gate and all associated site works; the proposed new entrance will be set back 6.5 metres from the edge of the road to allow 90 metre sightlines in both direction.
The development will consist of a 4.42 hectare stie currently in use as Greenogue Recycling to include the following; A) Demolition of existing green recycling structures on site including office and storage shed with total area of 2,265m2. B) Construction of 7 no. warehouse units, with maximum height of 15.3 meters, all with ancillary office, staff areas, bin stores etc. Each unit has access to service yard and HGV loading / unloading area. The total floor area of the warehouse development is 16,602.2 m2, made up as follows; i) Unit 1 - gross floor area of 3,851.1 m2. ii) Unit 2 - gross floor area of 3,886.8 m2. iii) Unit 3 - gross floor area of 2,758.3 m2. iv) Unit 4 - gross floor area of 1,685.4 m2. v) Unit 5 - gross floor area of 1,062.2 m2. vi) Unit 6 - gross floor area of 1,679.2 m2. vii) Unit 7 - gross floor area of 1,679.2 m2. C) Access to be provided from existing entrance to the site via Tay Lane. New footpaths / cyclepaths throughout the site including a new footpath / cyclepath connection to the Greenogue Logistics Park to the north of the site. D) 170 no. car parking spaces and 100 no. secure, sheltered bicycle parking spaces to serve the warehouse units. E) All ancillary site development works to include; minor realignment of site entrance, landscaping, internal raods, drainage, utility services, service yards, HGV loading / unloading areas, level access goods doors, dock levellers, site lighting, boundary treatments, signage, storm water drainage network, underground water and foul servicing, green roofs on warehouse units, form part of this application.
Proposed 3 bedroom dwelling (233.6sqm), single storey. Installation of a packaged wastewater sewage treatment system and polishing filter, stormwater harvesting tank and soakaways, weel, new vehicular access, landscaping and ancillary site works, all in association with equine business.
Erection of a four bedroom, detached dwelling house (284.1sq.m), part one and part storey and a half; installation of a packaged wastewater sewage treatment system and polishing filter; stormwater harvesting tank and soakaways well; vehicular access landscaping and ancillary site works all in association with adjoining equine business.
Erection of non-illuminated signage to the front of the building.
Retention permission for an existing site entrance with pillars, stone walls and security gate.
Permission for a new 5 bed dormer house, new septic tank with percolation area and all associated site works, and retention permission for the existing site entrance with stone wall.
One/two storey dormer style four bedroom house; associated works and water treatment system.
Alterations to the existing roof structure of existing habitable dwelling; construction of a single storey extension to the rear and side of the existing dwelling including changes to all elevations; construction of a single storey porch to the front of existing dwelling including changes to all elevations; construction of a raised patio area to the rear elevation of the existing dwelling; decommissioning of existing septic tank and installation of a wastewater treatment plant and percolation area and all ancillary site works.
Single storey extension to existing cottage. Temporary single storey dwelling for the duration of construction works. All associated site works.
Two storey split level extension to existing cottage and all associated site works.
Proposed LED Flood-Lighting System on Grass Pitch consisting of 6 number 20 Metre high columns and all associated ducting, column bases and light fittings
2 above ground firefighting water holding tanks and 2 integrated pumphouses plus ancillary works to serve the 2 industrial development sites currently under construction at Block A & B.
Demolition of the existing dwelling (252sq.m) and associated domestic garage (49sq.m) and shed (12sq.m) located towards the north-west of the site and the construction of 3 warehouses with ancillary office and staff facilities and associated development as follows: Unit 1 will have a maximum height of 15.75 metres with a gross floor area of 5,619sq.m including a warehouse area (5,041sq.m), ancillary office areas (182sq.m) and staff facilities (396sq.m); Unit 2 will have a maximum height of 16.35 metres with a gross floor area of 6,724sq.m including a warehouse area (6,135sq.m), ancillary office areas (275sq.m) and staff facilities (314sq.m); and Unit 3 will have a maximum height of 18.9 metres with a gross floor area of 10,095sq.m including a warehouse area (9,335sq.m), ancillary office areas (399sq.m) and staff facilities (361sq.m); the development will also include the provision of a new vehicular access to the site from the Aerodrome Roundabout in lieu of the extinguishment of existing multiple access points from the R120 Newcastle to Rathcoole Road; internal roundabout; pedestrian access; 187 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substations; sprinkler tanks; pump houses and all associated site development works above and below ground.
Alteration to previously granted planning permission (Reg. SD19A/0407, SD21A/0200 & SD22A/0092) for development at Site C (2.7ha site).
Amendments principally comprising of an overall increase in the commercial floor area by 15,479sq.m from the permitted 13,959sq.m to 29,438sq.m; the permitted scheme has 3 internal ancillary office floor levels, and the proposed alterations provide 2 mezzanine levels in the warehouse area (i.e a total of 5 internal floor levels); the permitted maximum height of the development at 23.7 metres will remain unchanged; the additional 15,479sq.m development proposed will comprise an increase in the warehouse floor area from 12,369sq.m to 13,353sq.m, staff facilities from 548sq.m to 2,582sq.m and ancillary office area from 1,042sq.m to 2,437sq.m; in addition to the provision of a 2 storey mezzanine warehouse area (9,703sq.m), integrated plant room (434sq.m) and plant area on 2 floors (929sq.m); construction of a 2 storey car-parking area (4,057sq.m and 7.8m height) to accommodate an increase from the previously permitted 119 ancillary car parking spaces to 190 car parking spaces; 13 designated van parking spaces (no dedicated van spaces previously proposed); 72 permitted cycle parking spaces; reconfiguration of the HGV yard and an increase in the number of HGV dock levellers from 12 to 14 and the provision of 16 van loading level entry doors; the provision of an additional egress on the eastern boundary to facilitate vans exiting the site; sprinkler tank and associated underground pumps; repositioned ESB substation (15sq.m and 3m height); bin storage (42sq.m and 2.9m height); amended lighting layout; signage; modifications to hard and soft landscaping and boundary treatments; and associated site development works above and below ground.
Modifications to a permitted warehouse development (as granted under SD19A/0407, as amended by SD21A/0200); The amendments principally comprise an overall increase in the commercial floor area of the warehouse by 2,334sq.m from the permitted 27,683sq.m to 30,017sq.m; The modifications proposed include: an increase in plant/machinery areas from 1,363sq.m to 3,933sq.m (principally through the provision of an additional mezzanine level within the warehouse area to accommodate plant/machinery); a reduction in the permitted mezzanine level 2 from 9,703sq.m to 9,349sq.m (principally through the provision of opes in the mezzanine floor to accommodate machinery associated with an advanced picking system); an increase in warehouse floor area from 14,225sq.m to 14,282 sq.m; an increase in staff facilities from 1,616sq.m to 1,659sq.m; and an increase in ancillary office area from 776sq.m to 794sq.m; The development will also include: the provision of security hut (14.7sq.m) close to the southern site boundary; the relocation of the building's main entrance stair core at the western elevation; elevational changes including the repositioning of 2 level entry doors and 1 dock leveller and the associated canopy, repositioning of fire escape doors, removal of 2 M&E rooms; internal modifications including the insertion of a warehouse toilet block at ground floor level, repositioning of stair cores; the provision of a pedestrian gate adjacent to the bin store; reduction in bin area from previously approved 45sq.m to 38sq.m; provision of compactor in place of 1 van parking space along the south-east boundary resulting in the reduction of van parking spaces from 12 to 11 in a modified arrangement; relocation of van egress gate further south; modifications to the position of the van loading entry doors and associated canopy; modifications to hard and soft landscaping and boundary treatments including the provision of a paladin fence separating the car parking area and the HGV circulation area and removal of 2 green walls; and all associated site works above and below ground.
Provision of a warehouse unit with ancillary three storey office and staff facilities and associated development; the building will have a maximum height of 23.7m with a gross floor area of 13,959sq.m including a warehouse area (12,369sq.m); staff facilities (548sq.m) and ancillary office area (1,042sq.m); provision of one new vehicular access/egress point at the northern corner of the subject site and one HGV access/egress point at the southern corner of the subject site which connects onto the internal access road for two adjacent permitted warehouses (Reg. Ref. SD18A/0265) and permitted waste metal facility (Reg. Ref. SD19A/0065) which links to the Greenogue Roundabout on the R120; 119 ancillary car parking spaces; bicycle parking; HGV yard with 12 loading bays; level access goods doors; dock levellers; hard and soft landscaping; ESB substation (9sq.m); boundary treatments and associated site development works above and below ground.
Retention application consists of the following: 1) Provision of fenced turnstile & pedestrian gate to the main building entrance on the front (north-east) elevation; 2) Provision of external ramped access to ancillary Office Block B2 and separate stepped access/egress platform on the side (north-west) elevation; 3) Provision of additional fencing and new barriers to existing HGV access/egress gate plus new pedestrian entrance gate; 4) Provision of gatehouse to HGV gate, 23m2, 3m high; 5) Provision of new paladin fence & second pedestrian gate on the side (north-west) elevation; 6) Provision of car access/egress barriers in and out and directional arrow road markings; 7) Provision of 23no. EV charging for logistics vehicles and 3 no. EV rapid chargers for logistics vehicles; 8) Provision of Sprinkler Tank 10.70m diameter, 9.39m high, effective capacity = 657m3, to rear (south-west) yard; 9) Provision of Pump House 29m2, 3.2m high, adjacent to above referenced sprinkler tank; 10) Provision of 2no. location of new paladin fence and fire tender gates within the site.
Erect 3 no. company logo advertising signs, smoking shelter, sheltered cycle parking spaces, and compactor canopy at Block B, College Lane, Greenogue Rathcoole Co. Dublin. The application consists of the following: Proposed 3no. non-illuminated signage company logo lettering; total area of 24.78m2 located 13.70m above ground floor level on the front (north-east) and side (north-west) elevation; Proposed smoking shelter located at front north-east elevation, 3.90m2, 2.68m high; Proposed 20no. sheltered cycle parking spaces at front north-east elevation; Proposed compactor canopy, 48m2, located 3.51m above ground floor level on the side north-west elevation.
Subdivision of existing Block B, College lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit 81 to contain 15,815sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area and (2) Unit 82 to contain 7,569sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit 82 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit 82 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments, note this planning submission is one of two independent applications for subdivision options to Block B.
Subdivision of existing Block B, College Lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit B1 to contain 13,719sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area; (2) Unit B2 to contain 9,665sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit B2 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit B2 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments. (Note: this planning submission is one of two independent applications for subdivision options to Block B).
Alterations to an existing granted planning permission (Reg. Ref. SD20A/0258) for warehousing; alterations relate to Unit 2 only on its 1.316 ha site including change of use of 24sq.m. of warehouse floor area to staff facilities due to addition of single storey staff facilities block in the south-west corner of the warehouse; change of use of 97sq.m of warehouse floor area to ancillary office (38sq.m) & staff facilities (59sq.m) due to extension of the ancillary office block on ground floor; alterations also result in increase in the overall staff facilities area by 7sq.m (from 314sq.m to 321sq.m) and increase in the overall office area by 139sq.m (from 275sq.m to 414sq.m); addition of 232sq.m of charging area (including 6sq.m change of use from warehouse to charging area) as the extension of the rear of warehouse (southern elevation); alterations result in total building area increase by 254sq.m (from 6724sq.m to 6978sq.m); associated elevational revisions; associated site plan & drainage layout adjustments due to the inclusion of the above alterations; all other details remain as per the granted application Reg. Ref SD20A/0258 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tank, drainage & outfalls.
Alterations to existing granted planning, Ref. SD19A/0065, for a proposed Waste Metal Transfer Facility including Waste Electric & Electronic Equipment (WEEE). The subject alterations for which planning permission is sought for are as follows: (1) Reconfiguration of the floor plan areas as follows: (A) Provision of 535sq.m additional floor area due to introduction of areas as follows - (A.1) Extended display area at ground floor of ancillary office, addition of 46sq.m floor area, (A.2) Extended open plan office at first floor of ancillary office, addition of 20sq.m floor area, (A.3) Single storey ancillary storage facility to the front north-east elevation totalling 166sq.m with overall height 7m, (A.4) Mezzanine area to the south eastern side of Light Industrial Unit, totalling 303sq.m. Alterations listed above result in total building area Increase from 4391sq.m to 4926sq.m as shown at the revised table of gross Internal floor areas & uses. (B) Change of use of 64sq.m of light industrial unit floor area to staff facilities due to the introduction of: (B.1) Enclosed stairs from Light Industrial Unit to ancillary office/staff facilities (overall 31sq.m), (B.2) single storey cleaners store and storage at ground floor to the north-eastern comer of light industrial unit (overall 33sq.m). (C) Change of use of 100sq.m of workshop charging area & staff facilities to workshop area & single storey office/staff facilities. (D) Introduction of full height dividing wall at light industrial unit. 2. Elevations alterations as per list above plus additional alterations as follows: (a) Provision of full height cladding (ground floor to roof) to light industrial unit and ancillary Workshop. (b) Introduction of 11m wide x 6m high open to light industrial unit side (north-western) elevation, (c) Rearrangement of all fire exit & level access doors to light industrial unit & ancillary workshop including omission and addition of the same, (d) Introduction of integrated modular louvre system to light industrial unit rear (southwestern) & side (north-western) elevation, (e) Introduction of canopies to the ancillary office main entrance and above 11m wide open & dock levellers to light industrial unit side (north-western) elevation. (3) Site plan alterations as follows: (a) Rearrangement of car parking spaces due to provision of office extended display area to the front (north-eastern) elevation, (b) Provision of new finish floor level to office/staff facilities and Workshop and associated site levels adjustments, (c) Provision of a new boundary fence type (paladin fence) throughout the development, (d) Provision of additional weighbridge - overall 2 proposed and rearrangement of brush wash and steam wash between workshop and site's north-western boundary, (e) Provision of building protection bollards to workshop side elevations (south-east and northwest), (f) Associated drainage adjustments due to the inclusion of the alterations above plus reduction of surface water and foul sewer outfall route as per as built access road and services which serve built developments to the east of the site. All other details such as landscaping, lighting, external surface finishes, Environmental Impact Assessment Report (EIAR), Flood Risk Assessment etc. will remain as per the granted application ref. SD19A/0065.
Construction of a detached single storey split level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
Construction of a detached, single storey split-level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
Land recontouring/infilling works on C. 38,000sq.m of a folio size of C.5.3HA (allowing buffers); the volume of material to be placed on the site C.91,000m3 with an average fill level of C.3.5m above existing.
Reduction of the warehouse office/staff facilities block at south-east corner of the building, decreasing the overall staff facilities floor area by 290sq.m (from 396sq.m to 106sq.m) and overall office floor area by 60sq.m (from 182sq.m to 122sq.m). Change of use of 177sq.m staff facilities floor area to the warehouse floor area at the ground floor (warehouse floor area was 5041sq.m to 5218sq.m). Associated elevational revisions. All other details remain as per granted application Reg. Ref SD20A/0258 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tank, drainage and outfalls. The alterations relate to Unit 1 only on its 1.32ha site.
The development will consist of: The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
Additional floor area of 82sq.m ground floor and 35sq.m first floor to allow reconfiguration of 4 double rooms to 8 single rooms, new ground floor storeroom and enclosing fire exit stairs; relocation of 8 car parking spaces to extended existing car park; all associated site works; proposed material finishes to match previously approved changes to previously granted permission SD20A/0153.
Permission for 609.5sq.m, 16-bed extension to existing Nursing Home which consists of new 443sq.m two storey 14 bedroom extension adjoining existing building to the west, new 64.3sq.m single storey 2 bedroom extension to south west wing of existing, new 102.2sq.m 2 storey extension of existing dining areas to the north, new garden lawns and walkway with hard landscaped areas to north west of site, 8 new car parking spaces to existing car park to east of site and all associated site works.