Permission for a single storey ground floor extension to the front and side of existing dwelling forming new entrance hall with stepped approach, extension to existing kitchen and living area including new windows to front of existing dwelling and all associated ground works
Retain velux roof windows to attic storage space, front and rear of property and associated site works
Retain attic conversion to habitable rooms including velux roof lights to front and rear of property and associated site works
Conversion of the original single-storey carport with a pitched roof over attached to the side of the existing dwelling, comprising of a dining and kitchen area at ground floor level including retention for the existing single-storey extension to the rear & side elevations at ground floor level, comprising of an accessible lobby, shower room and bedroom with a total floor area of 45.6m2, all connecting into the existing services
The construction of a new single storey extension to the rear of the existing semi detached two storey dwelling comprising of a new bedroom, en suite and walk in wardrobe including new velux rooflights to the south west elevation & new side entrance door and window to the existing north east elevation all connecting into existing services and including all associated site works
Construction of 3No. detached houses with new access entrance and connection to existing services
Demolish an existing car port and shed to the side of the existing dwelling and erect a 8m2 single storey bay to the front, a 83m2 two storey extension tot he side and a 54m2 single storey extension tot he rear with alterations and revisions to the elevations and internal layout of the existing 88m2 dwelling and construct a 40m2 single storey garden shed and games room to the rear garden along with all associated site development works
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
Construction of domestic single storey extensions to the rear of existing dwelling, the construction of a domestic garage, the construction of a home office, the construction of dog kennels, changes to existing boundary wall, changes to elevations of existing domestic dwelling with all associated works
Retention permission is being sought for the existing single storey front entrance porch extension to the front elevation of the existing dwelling at No.64 The Maples Arklow Co. Wicklow
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Single storey industrial unit (Gross Area 945 Sqm) and all associated site works
Vehicular access to public road as constructed, retention of pedestrian gate to laneway to the east, retention of revised elevations to dwelling from those granted under planning ref. no. P92/96 and associated works
Demolition of the existing structure to the north of the site, (c.62.5sq.m) and the construction of 49 no. 2 storey residential units comprising of 6 no. 4 bed semi detached houses (c.130sq.m each), 25 no. 3 bed semi-detached/terraced houses (c112sq.m each), 14 no. 2 bed semi-detached/terraced houses (c.85sq.m each), 2 no 1 bed ground floor apartments (c.52sq.m each) and 2 no. 1 bed first floor apartments (c53sq.m each). A total of 91 car parking spaces are proposed which includes 5 no. accessible car parking spaces, 3 no. EV car parking spaces and 3 no. visitor spaces. Bicycle parking to the rear of each unit. 1 no. ESB substation is proposed to serve the development. In total the proposal provides for 2,879sq.m of public open space through 3 no. areas throughout the site. Waste water connection will be provided via the private waste water treatment plant at the existing Heatherside development to the west.. All associated site works, service provisions, drainage works, vehicular access to the north west from the existing Heatherside Residential Development (under construction), all internal roads and footpaths, bin stores, landscaping, boundary treatment works and public lighting serving the proposed development.
Renovate & extend our dwelling by the removal of existing garage, construction of study, bathroom, bedroom & sun room and to include associated site works to existing services to the rear and side of our home
The proposed development will consist of replacing the existing boundary fence on three of the site boundaries with a stronger more secure type of fence as shown on the drawings submitted with this application
1) A portal fame structure 20 metres long by 14 metres wide by 7.5 metres high (floor area 280m2). The building will be used as a store to house spare parts and maintenance equipment. 2) A single storey office 5.0m by 3.5m within the proposed store to keep records and specification details of the spare parts and equipment stored. 3) Associated site works
Constructing a two story side extension 65.6sqm metres to the side of existing semi detached house 106.9sqm metres to construct bay window 4.3sqm metres and demolish single storey side extension 18.3sqm metres and for alterations to the existing semi detached house and associated site works
Change of use from retail to retail with ancillary off licence use
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well
2 No. existing detached single storey self-service laundry kiosk as constructed and all associated site works
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Single storey welfare block (Gross Area 200 Sqm) and installation of covered timber storage racks to rear of existing unit 3
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
Change to an approved permission Reg. Ref. 20/667 with the addition of a single storey bedroom extension to the rear of a single storey cottage
Demolish the existing 2m2 front porch and 40m2 substandard rear extension along with all outbuildings totaling 84m2 and erect 81m2 new single storey extensions to the rear and side of the existing 45m2 cottage along with minor alterations and revisions to the elevations and internal layout of the original cottage and erect an 84m2 garage, upgrade the existing effluent disposal system to current EPA standards, improve the existing vehicle entrance along with all associated site development works
1) Construction of a single storey office building with an approximate gross floor area of 339 sq. m.; 2) Provision of permeable surfaced parking area, including 8 no. car parking spaces, and 6 no. bicycle spaces; 3) Provision of permeable surfaced area to front of the proposed building; 4) Provision of surface water drainage infrastructure; and 5) All associated and ancillary works, including removal of an existing fence, provision of a footpath and provision of connections to existing facility drinking water supply and wastewater collection networks
Change of use of the site from a vehicle storage compound to fuel storage depot. The proposed works will include the installation of 1 number over ground oil storage tank, storage sheds, advertising signage and all associated site works
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
Provision of an additional door on front elevation to facilitate access to rear garden via a corridor including ancillary work
Constructing extension 36.1sqm metres to the rear and the side of existing detached house of 123.8sqm metres and to construct shed of 8.75sqm metres to the rear of new extension and alterations to existing detached house and associated site works
Detached 2-storey split-level dwelling with single storey car port & new wastewater treatment system to current EPA standards together with all ancillary site works including a new vehicular entrance from existing access road
Erection of a single storey modular building for use as a coffee and pizza takeaway, the demolition of the single storey derelict structure, and the erection of advertising signage and all associated site works and services
As constructed single storey extension, c.21sqm, and all associated site works
Single storey extension to side of existing dwelling along with all associated ancillary site works and services
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Demolition of the existing two-storey school building and single-storey extensions (c. 2570 sq.m) and removal of temporary classrooms on site (c. 120 sq.m); construction of a three-storey school building (c. 7535 sq.m) including general and specialist classrooms, a special education needs (SEN) unit, offices, general purpose hall, PE hall, fitness suite, staff room, library, social spaces, sanitary facilities and ancillary spaces with solar photovoltaic panels at roof level; upgrading of the existing vehicular entrance to the sports pitch and the creation of a new vehicular entrance on Coolgreaney Road to provide dedicated vehicular entrance and exit points as part of a new one-way traffic system through the site; removal of the existing main vehicular entrance and provision of a new pedestrian/cyclist entrance on Coolgreaney Road; provision of a car set-down area within the school grounds and construction of a 56m bus set-down area along Coolgreaney Road; provision of a new pedestrian/cyclist access from John Paul Avenue; removal of 32 no. existing car parking spaces and provision of 70 no. car parking spaces including 1 no electric vehicle parking space and 4 no. accessible parking spaces; provision of 100 no. sheltered bicycle parking spaces; provision of external play and amenity areas including a SEN play area and 3 no. multi-use game areas; provision of landscaping, boundary treatment, site lighting, provision of a covered work area, bin stores and storage shelters; provision of associated drainage, attenuation and other site services including an ESB substation and switch room (c. 25 sq.m); and all related site development works.
Alterations to an existing two storey semi detached dwelling. The proposed works will comprise the provision of a new vehicular entrance gate, piers and driveway to the existing front south garden boundary wall together with alterations to existing window opes at ground floor level and a new velux rooflight to the existing main roof to the rear north elevation including the provision of a new patio door ope to the existing side west gable end at ground floor level all connecting into existing services
- 2 no. warehouse buildings with a gross floor area (GFA) of c. 3,364 sq.m each and a total height of c. 14.1m. Each warehouse includes a warehouse area of c. 2,419 sq.m, reception area, office, staff facilities, toilets, plant and storage areas at ground floor level, and office space, meeting rooms, staff facilities, toilets, plant and storage facilities at mezzanine level (c. 581 sq.m). - The provision of a service yard with a security hut (c. 34 sq.m) located at the main entrance, HGV unloading areas and 4 no. associated loading bay docks on the eastern elevation of each warehouse building. - The provision of 68 no. car parking spaces including 4 no. accessible spaces and 10 no. EV parking spaces serving staff and visitors. - The provision of 40 no. cycle parking spaces serving staff and visitors. - The provision of a sprinkler tank, sprinkler pump house (c. 13.3 sq.m), fire hydrant tank, hydrant pump house (c. 13.3 sq.m) and ESB substation (c. 25 sq.m) - Construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 15.7 ha on ground mounted steel frames, associated power trunk building (c. 539 sq.m) and 2 no. transformer compounds, underground cabling and ducting, new internal tracks for maintenance and all associated site services works. - Site access from the permitted development to south (WCC Reg. Ref.: 20/1088 as amended WCC Reg. Ref.: 23/62 and 24/88), which is subject to a current separate amendment application under WCC Reg. Ref.: 25/60350, and extension of the permitted inner relief road through the site. - The provision of a new statcom compound including a single storey control and valve building with a GFA of c. 253 sq.m and associated equipment adjacent to the permitted inner relief road to the south of the main site area. The proposed development also includes for the provision of associated landscaping and planting, berms, boundary treatments, internal road network, pedestrian and cyclist infrastructure, signage zones, site lighting, drainage works, sustainable drainage systems (SuDS) and all ancillary site development works
Dormer type extension to existing bungalow and erect an extension to the side which will consist of the following (a) renovation and extension of the ground floor to create additional living space including the rearrangement of internal layouts with associated demolition works (b) the removal of the existing roof and replace it with a dormer roof space to accommodate bedrooms (c) renovate and extend the existing storage shed and workshop (d) ancillary works
A scaffold
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
Alterations to existing entrance to allow for disabled access for wheelchair. Gross floor space: 4.2m2 extension
159.25 kilowatts (350no.) of roof mounted Photo Voltaic Solar Panels (788m2) placed on the roof of our Arklow store, and all associated works
Alterations and additions to an existing two-storey semi-detached dwelling comprising the demolition of the existing single-storey extension to the rear south elevation & the construction of a new single-storey kitchen extension in lieu, together with the construction of a new single-storey bedroom & bathroom extension to the west - side gable end all connecting into existing services and including all associated site works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
Installation of 6 no. 16m high floodlights together with associated site works
Provision of off street parking in my front garden including lowering the public footpath and associated site works
Tarmacadam surface to front garden. Planning permission is also sought for the provision of off street parking in front garden including lowering the public footpath and associated site works