For development of a livestock strawbedded loose shed and a hay barn store withassociated ancillary siteworks
To construct additional farm entrance and access road to existing public road plus all ancillary site works
The development will consist of the change of use from school to domestic dwelling, with replacement doors and windows and new windows and door where shown
Of minor elevational alterations and planning PERMISSION to erect additional walling to the front of the dwelling and erect entrance gates to the front of the property along with all associated works
For the change of use of a former schoolhouse - currently designated as residential - to a short term let facility
To alter, renovate and extend an existing cottage and outbuilding, and install a new wastewater treatment system along with all associated works
For change of use of existing agricultural structure to proposed Farm Shop, Artisan kitchen/bakery, egg packing with storage facilities/staff room and W.C. etc, with associated elevational changes plus exterior cold store room and link, car parking, proposed upgrade of existing foul sewer system, upgrade of existing access roads plus all ancillary site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct an extension to the west side of an existing dwelling house and alterations to the front porch including widening the front door and removing side windows, along with ancillary works
To construct dwelling house, entrance, foul sewer treatment plant and percolation area plus all ancillary site works
To construct dwelling house, entrance, foul sewer treatment plant and percolation area plus all ancillary site works
To refurbish, alter and extend an existing dwelling house along with all associated works
For the construction of a sunroom to the side of an existing dwelling, construction of a domestic and alterations to the house granted under P8-14484 along with all associated works
To construct an extension to an existing dwelling, install a new wastewater treatment system, demolish existing flat roof sheds and all other ancillary site works
For development of a livestock slatted unit with associated ancillary site works
For development of a Livestock Slatted unit with calving pen and associated ancillary siteworks
To RETAIN existing attic conversion c/w dormer windows and RETENTION of existing porch and RETENTION of existing private garage c/w ancillary site works
To upgrade existing entrance to forest lands and to construct forest access road with all ancillary site works
To extend existing dwelling house, install foul sewerage treatment plant and percolation area
To refurbish and extend the existing dwelling and install a wastewater treatment system & all other associated site and ancillary works
To construct a new dwelling house and private garage along with a new entrance, new sewerage and water facilities along with all necessary ancillary works
For development of a dwelling house, proprietary wastewater treatment plant with polishing filters, a private garage entrance and associated ancillary site works.
To RETAIN extension to the existing dwelling house along with all associated site works
For development which will consist of a dwelling house, a private garage and a sewage treatment plant c/w ancillary site works
For development which will consist of a potato grading shed and ancillary site works
Of the following development consisting of the construction of an entrance and front boundary wall to dwelling
For development of concrete silage slab and manure pit with effluent tank and associated ancillary siteworks
For development which will consist of A, Retain ground floor rear extension, first floor conversion, external shed and B, to construct a garage and canopy to rear of house including all associated site works and services
To extend and renovate the existing dwelling house including upgrading the sewage treatment system and changing the location of the site entrance and to include restoring the existing outbuilding to its original form, a protected structure listed in Clare County Development Plan 2023-2029 Volume 4 Record of Protected Structures RPS No. 301 with all necessary ancillary services
(a) to demolish an existing cottage in ruins and (b) to construct a new dwelling house and garage complete with sewage treatment system along with ancillary works
To RETAIN the under-construction extension to the rear of the existing dwelling house and planning PERMISSION to complete the construction of same extension and to upgrade the existing wastewater treatment system along with all associated site works
To demolish an existing dwelling house and outbuildings and to construct a replacement dwelling, with all associated works
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
For development, the development consists of the construction of a hay shed and associated site works
To demolish the existing rear extension and to construct a new extension at the rear of his dwelling house to include the decommissioning of the existing septic tank, to be replaced with a new sewage treatment system with all necessary ancillary services
Of existing domestic garage/shed plus all ancillary site works
To construct a new dwelling house, private garage, site entrance, private on-site wastewater treatment system and all associated site works
To construct a new dwelling house, access road, entrance, private garge and install a new wastewater treatment system along with all associated works
For change of use of former national school to residential use/short-term letting plus provision for new window on western gable with associated ancillary site works
Of 1. The porch and sunroom extensions onto the existing dwelling, 2. The renovation of the original cottage on site into a self contained one bedroomed unit, for the ancillary enjoyment of the occupants of the main dwelling & all other associated site and ancillary works
To renovate and extend existing residential property, with works to include part demolition of existing building, and provision of new wastewater treatment system with RETENTION of on site mobile home for two year period for duration of works and all necessary ancillary services
To construct a new dwelling house, private garage, site entrance and on-site sewerage treatment system along with all associated site works and services
To close up existing entrance, construct new vehicular entrance to existing dwelling house, and PERMISSION to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
The development will consist of a private dwelling c/w private garage and ancillary site works
To install a new effluent treatment sytem to serve existing dwelling, with all associated site works
For the development which will consist of a dwelling house, a private garage, connection to the public sewer and ancillary site works
The development will consist of a dwelling house, c/w private garage and all ancillary site works
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
For development which will consist of a dwelling house and garage with proprietary wastewater treatment system and polishing filter together with ancillary site works
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)