For the following a) new single storey extension b) add/alter windows to existing dwelling house along with associated site works
To Extend the Appropriate Period of Planning Permission for P15 /698 for development which will consist of a single dwelling
To construct a granny flat to the side of existing garage/ home office together with all ancillary site development works
For development, the development will consist of the renovation of the existing semi-derelict cottage and the demolition of an adjacent store and the construction of an extension on the west side of the cottage which is to be finished in timber clad walls with a corrugated metal roof. A new wastewater system is to be constructed and access track to be upgraded as part of the external works
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To construct an entrance, dwelling house, detached domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
To construct an entrance, dwelling house, detached domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
For a glamping site with 5 no. glamp units, a reception/services/recreation building with roof mounted PV panels, existing site entrance modifications, access road, parking area, landscaping, on site wastewater treatment system and all associated site works
Of the following a) The development of a hardstanding area used for the storage of agricultural and construction vehicles, machinery, plant and materials, b) Storage container, c) Erection of security gates together with all ancillary site development works
To construct a new 3 storey dwelling house, detached domestic garage, wastewater treatment system, percolation area, site entrance, all ancillary site works
To revise the site boundaries and for RETENTION permission for the altered fenestration in the existing dwelling originally granted by planning reference 07/2841 and all associated site and ancillary works
To install a 6m extension to an existing 20m lattice telecommunications support structure carrying telecommunications equipment, together with associated equipment and cabinets enclosed within an existing 2.4m palisade fence compound
For the construction of a new slatted cubicle shed, milking parlour and dairy, meal bin and water tank and associated ancillary concrete works
To construct a dwelling house, garage, and proprietary waste water treatment system along with ancillary site works
Of extension to rear of existing dwelling house and retention of alterations to existing dwelling house and permission for the construction of an extension to front of existing dwelling house
To construct a garage for domestic use and associated site services
To Extend the Appropriate Period of Planning Permission for P17/787 to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
To construct an Indoor Hall, Gym, Wall ball, Running track and associated works
To construct a Walking /Running Track with Lighting and associated site works.
To construct a building with rooms for physical fitness and recreational sessions, connect to existing sewerage system and all other associated and ancillary site works
Of relocated entranceway and front boundary wall to their land
To RETAIN alterations to dwelling house, garage/shed and front boundary wall/entrance
For development, the development consists of the construction of an extension to the rear of existing dwelling house and associated site works
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To construct a dwelling house and garage, with effluent treatment system, accessed by an existing shared entrance and driveway from public road, all with associated site works
The development will consist of (a) demolition of existing lean-to at west end of house (b) construction of new extension (c) various minor modifications to other elevations
For development, the development consists of the construction of a calving unit and associated site works
Is being sought to construct an extension to a dwelling house
For RETENTION and completion of a dwelling house, private wastewater treatment system with all associated works
To construct a dwelling house, waste water treatment system and new entrance
To construct the following: a dwelling house, a standalone building for use as a gym ancillary to house and new entrance and all associated works
To a) convert the attic space in the existing dwelling house to a habitable space, b) to demolish the existing sunroom and construct a single storey extension to the front and side of the existing dwelling house, c) to construct a detached garage/store/plantroom and d) to expose and inspect the existing waste water treatment system and upgrade where necessary including all site services and ancillary site works
The construction of a domestic shed-gym for use ancillary to the existing dwelling house together with all associated site works
For the development will consist of the following: 1 (a) construction of a new single storey extensions to house and shed, including associated alterations to existing structures and all associated landscaping, site development works. (b enhancement of existing wastewater treatment system including replacement of existing septic tank with new wastewater treatment unit and 2. retention of alterations to existing dormer windows to east and west elevations, installation of corner windows and demolition of dormer to east with replacement roof light, together with all associated site works
Of a dwelling house, septic tank, garden office, storage sheds and all associated services on revised site boundaries
To demolish the existing haybarn and construct a dwelling in its place, install a wastewater treatment system and all other associated and ancillary site works
For the development which will consist of the demolition of elements of the existing dwelling and the provision of a new single storey extension to the rear of the dwelling, internal and external alterations and refurbishment works to the existing dwelling, modifications to the roadside boundary wall including the closure of the existing pedestrian access and new wastewater treatment system and soil polishing filter together with all associated site development works
Of a dwelling house, domestic garage, septic tank / proprietary treatment system and percolation area on a site with revised site boundaries to those previously granted permission under pl. ref. P03-1410 and for all ancillary services and associated site works
To extend the existing dwelling house & all other associated site and ancillary works
To decommission existing septic tank and install new waste water treatment unit / percolation area along with all associated site works
For a new dwelling house, a proprietary wastewater treatment system and all associated site works
To build a new dwelling house, install a waste water treatment system & all other associated site and ancillary works
For the (a) demolition of an existing single storey sunroom to the rear of an existing dwelling, (b) the construction of a new single storey extension to the side of the existing dwelling, (c) the modification of existing dormer roof windows, (d) modification of an existing porch to the front of the existing dwelling (e) modifications to the elevations of the existing dwelling, and all ancillary site works
Of (1) extension & alterations to existing dwelling house and (2) RETENTION of domestic garage
For the following works (A) Renovate and change the layout and elevations of the existing dwelling and attached shed (B) Change use of the attached shed as living accommodation (C) Construct extensions to the rear of dwelling incorporating garage (D) Reconstruct porch to front and (E) Upgrade the existing effluent treatment system, all with associated site works
To build a dwelling house, install a waste water treatment system and all associated site and ancillary works
To demolish existing cottage and existing agricultural buildings onsite, to remove existing waste treatment system and construct a new dwelling house shed, upgraded proprietary waste treatment system and all associated site works.
To remove existing septic tank from the field adjoining house site and replace with upgraded waste treatment system on her own house site and to carry out all associated site works
For development, the development consists of the construction of a dwelling house, waste water treatment system with percolation area to replace existing mobile home on site and associated site works