Construction of a new residential dwelling house and effluent treatment system together with all ancillary site works and servicesDecision record indexed
Construction of a new residential dwelling house and effluent treatment system together with all ancillary site works and servicesGrounds not yet categorised
Planning permission to demolish an existing derelict dwelling house and construct a new dwelling house & garage as shown on plans and all ancillary site developments at Drum, Glenbrook, Knock, Co. MayoDecision record indexed
Ballymacloughlin Ballylogher Derryvoghy Coolaght, Tawnaghlahard & Murneen North, Co. Mayo
The amalgamation of the PBKS & Derryvoghys GWS's. Consisting of the installation of a 1.7km long, 90mm outside diameter interconnecting pipeline, replacement of circa 0.6km of an existing 3" diameter pipeline with a new 90mm OD section of pipeline, replacement of circa 1.6km of an existing 2" diameter pipeline with a new 63mm OD section of pipeline, replacement of circa 3.7km of an exisitng 2" diameter pipeline with a new 63mm OD section of pipeline. Constructon of a new booster station alongside the proposed interconnecting pipeline. Decommissioning of the replaced section of pipeline within DMA001, 004 & 005 of the Derryvoghy GWS, decommissioning of the existing Derryvoghy source and pumping station, and all associated site development works above and below ground including installation of all necessary valves and chambers. (A NIS will be submitted with the application)Decision record indexed
Construct an extension to existing agricultural building which incorporates a feeding area and a slatted tank, all as per drawing documents submitted, together with all ancillary site works and servicesDecision record indexed
RENOVATION OF EXISTING COTTAGE, DEMOLITION OF EXISTING REAR EXTENSION AND THE CONSTRUCTION OF A NEW EXTENSION, DEMOLITION OF EXISTING OUT BUILDING, UPGRADE AND REPLACEMENT OF EXISTING WASTEWATER TREATMENT SYSTEM AND NEW SITE ENTRANCE ONTO THE L1503, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCTION OF A NEW RESIDENTIAL DWELLING HOUSE AND EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESGrounds not yet categorised
Construction of a new residential dwelling house and effluent treatment system together with all ancillary site works and servicesGrounds not yet categorised
Planning Permission to construct extensions to dwelling house, upgrade foul treatment system and demolish shed all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
THE DEVELOPMENT CONSISTS OF THE RETENTION OF SHEDS (32.5m2) AND GARDEN ROOM BUILDINGS (39.7m2) AT THE REAR OF THE EXISTING DWELLING HOUSE.Decision record indexed
Retain dwelling house and garage on revised location all as per drawing documentation submitted together with all ancillary site works and servicesDecision record indexed
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM, ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Renovate and extend the derelict cottage including: demolition of existing poorly constructed extension, rebuilding extension, restoration of historic roof pitch, addition of roof lights, off road parking for 2 cars, domestic sewage treatment plant and all associated worksDecision record indexed
RETENTION PERMISSION FOR AN EXISTING DOMESTIC GARAGE AND THE CONVERSION OF THE ORIGINAL ATTACHED GARAGE TO LIVING SPACE AND ALSO FOR THE LOCATION OF THE EXISTING ENTRANCE GATE, MINOR REVISIONS TO THE SITE BOUNDARIES, AND THE EXTERNAL FINISHES TO THE EXISTING DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTING SERVICESDecision record indexed
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA, ALL AS PER DRAWING DOCUMENTS SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construction of a new detached dwelling house and garage, together with effluent treatment system, percolation area and all associated site worksDecision record indexed
Construct a dwelling house, domestic garage, septic tank and percolation area, together with all ancillary site works and servicesDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE, CONSTRUCTION OF A PROPOSED REPLACEMENT DWELLING HOUSE, DOMESTIC GARAGE, INSTALLATJION OF A WASTE WATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ANCILLARY WORKS.Grounds not yet categorised
CONSTRUCT NEW AGRICULTURAL BUILDING FOR HOUSING BOVINE LIVESTOCK, CONSTRUCT NEW SILAGE SLAB, DEMOLISH EXISTING LEAN-TO STRUCTURE AND CONSTRUCT NEW LEAN-TO STRUCTURE AND ALL ANCILLARY SITE DEVELOPMENTS.Decision record indexed
Construction of a single new dwelling house with a domestic garage, installation of new tertiary wastewater treatment system with polishing filter and all ancillary worksDecision record indexed
CONSTRUCT 2 NO. BUNGALOWS/INDEPENDENT LIVING UNITS AND 2 NO. GARAGES. THE EXISTING ENTRANCE TO EXISTING HOUSE SHALL BE USED FOR THE BENEFIT OF THE DEVELOPMENT TOGETHER WITH CONNECTION TO EXISTING SERVICES AND ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
DEMOLISH GARAGE, EXTEND DWELLING AND ALTER ELEVATIONS AND CONSTRUCT ATTACHED GARAGE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCTION OF AN EXTENSION TO THE EXISTING ELECTRICAL SUBSTATION COMPOUND,INCLUDING NEW PALISADE FENCING, BUNDED CONCRETE PLINTHS,UP TO 12 NO. BATTERY STORAGE UNITS, ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT AND ALL ANCILLARY SITE WORKS AND APPARATUS.THIS APPLICATION REPRESENTS AN ALTERATION TO THE DEVELOPMENT ALREADY PERMITTED UNDER PL.REF. P18/241.Decision record indexed
Demolish existing stone ruin of dwelling house and construct new dwelling house, garage and connect to public sewer all as per drawing documentation submitted together with all ancillary site works and services. The site entrance will be via the existing entrance on siteDecision record indexed
RETENTION PERMISSION OF A SINGLE STOREY BUILDING COMPRISING 121M2 FLOOR AREA FOR MANUFACTURING, OVERHEAD SERVICE LINK TO EXISTING BUILDING, SURROUNDING CONCRETE HARD STANDINGS OF 602M2, EXTERNAL TOILETS, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKS AT REAR OF EXISTING FACTORY; RETENTION PERMISSION OF 2 NO. ROLLER ACCESS DOORS TO REAR OF EXISTING BUILDING; PERMISSION FOR REVISED SITE LAYOUT PROVIDING ADDITIONAL STAFF PARKING, SEPARATED TRUCK ACCESS TO REAR OF MAIN BUILDING, 1.8M HIGH SECURITY FENCE AND GATES TO PROTECT REAR AREA OF MAIN BUILDING; PERMISSION TO INSTALL 30000L OVER GROUND LIQUID STORAGE TANK COMPLETE WITH BUNDED AREA AND HARDSTANDING OF 100M2 FOR TRUCK UNLOADING TO OVER GROUND LIQUID TANK, REVISED STORM DRAINAGE INCLUDING DOWNSTREAM DEFENDER; PERMISSION TO CONSTRUCT NEW DOCK LEVELER TO REAR OF EXISTING BUILDING AND ASSOCIATED RAMPS, PROTECTION WALLS AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCT A DWELLING HOUSE AND GARAGE AND TO INSTALL A PACKAGED WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Erecting 8 no. pole top 18 meter high lantern columns with phillips LED 350 Lux floodlights as per specification together with all ancillary site works and servicesDecision record indexed
CONSTRUCT A MANURE PIT AND 3 BAY ENCLOSED LOOSE HOUSE WITH UNDERGROUND EFFLUENT STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS.Decision record indexed
175kW OF ROOF MOUNTED SOLAR PV PANELS OVER THREE STRUCTURES PLUS 100kW OF GROUND MOUNTED SOLAR PV PANELS AND ALL ASSOCIATED WORKSDecision record indexed
Demolition of part of the existing woodwork/construction studies building and prefabricated classroom building to rear of existing school. Construction of a single-storey standalone extension on lands to the north-east, consisting of 2 mainstream classrooms, 3 SET rooms, 2 construction studies/woodwork rooms, storage areas and toilet facilities along with hard and soft landscaped areas, upgrading of foul connections and surface water system, connections to all services, construction of a temporary traffic meeting point setback on L55513 and a temporary site access road off L55513 on the north eastern boundary of site and all other associated site worksDecision record indexed
Extend and renovate existing dwelling house including new site entrance and an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
The development will consist of the partial demolition, extension and attic conversion of an existing single storey bungalow and all associated site works. Amendments will be made to the elevations of the existing building including increased ridge height, reconfiguration of the existing openings and the addition of new openings. The extension of the bungalow will result in an increased ground floor area of 82sqm.Decision record indexed
The construction of a community centre, incorporating indoor changing rooms, recreation rooms, multi-function playing court, function room and parking facilities,Decision record indexed