CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A GARAGE WITH GRANNY-FLAT TO THE NORTH SIDE, A SUN PORCH TO THE SOUTH SIDE AND A STONE PORCH TO THE FRONT OF EXISTING DWELLING AND UPGRADING OF EXISTING SEPTIC TANK WITH A TREATMENT SYSTEM TOGETHER WITH ALL ASSOCIATED SITE WORKS AND DRAINAGEDecision record indexed
(1) CONSTRUCTION OF AN EXTENSION TO THE EXISTING FITNESS CENTRE (2) DEVELOPMENT OF NEW ASTRO TURF PITCH WITH THE ERECTION OF FENCING AND ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION AN EXTENSION TO AN EXISTING DWELLING HOUSE WITH INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE & DETACHED PRIVATE GARAGE, SEWERAGE TREATMENT UNIT, PERCOLATION AREA, VEHICULAR ENTRANCE ONTO THE ADJOINING PUBLIC ROAD, ACCESS LANE TO THE HOUSE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ADDITION OF FIRST FLOOR ACCOMMODATION TO EXISTING STORAGE SHEDS, INCLUDING INCREASING THE RIDGE LINE AND EAVE LINE OF THE OLD STORAGE SHEDS TO PROVIDE FOR THE FOLLOWING: (1) HOME OFFICE AND ART STUDIO ON FIRST FLOOR (2) A GYM FACILITY TO THE GROUND FLOOR AND RETAINING EXISTING USE OF STORES TO GROUND FLOOR (3) CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
EXISTING DWELLING HOUSE AS ERECTED, WITH ASSOCIATED SEWAGE TREATMENT SYSTEM AND ACCESS LANE AND PERMISSION FOR DECOMMISSIONING THE EXISTING TREATMENT SYSTEM AND INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) EXTENSION TO THE SIDE OF THE EXISTING HOUSE AND (2) ATTIC DEVELOPMENT AND PERMISSION FOR CONSTRUCTION OF EXTENSION TO THE REAR OF THE EXISTING HOUSE AND ASSOCIATED SITE WORKSDecision record indexed
EXCAVATED FILL MATERIAL AND PERMISSION FOR (1) DEMOLITION OF EXISTING CONSERVATORY, (2) ERECTION OF (A) A NEW EXTENSION TO GABLE OF DWELLING HOUSE (B) NEW FRONT PORCH, (3) ELEVATIONAL AMENDMENTS AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF AN EXISTING SHED AND CONSTRUCTION OF A DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE AND ASSOCIATED SEWAGE TREATMENT SYSTEM, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
RELOCATION OF DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND DOMESTIC GARAGE FROM THAT PREVIOUSLY GRANTED UNDER 20/50706 AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CHANGE OF DESIGN OF A DWELLING HOUSE AND DOMESTIC GARAGE PREVIOUSLY GRANTED UNDER PLANNING REF: 13/50934 AND EXTENDED UNDER REF 18/50841Decision record indexed
MASSLOUGHDERRYDUFF LACKAGHATERMON, ARDARA, DONEGAL PO
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PROVISION OF A NEW SITE ENTRANCE (4) WIDENING OF 4 NO. BENDS AND 1 NO. JUNCTION ALONG THE PUBLIC ROAD L2563 (5) CONSTRUCTION OF (A) A CONTROL BUILDING / SUBSTATION WITH A FENCED COMPOUND PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE 14/50553 AND EXTENDED UNDER PLANNING APPLICATION REFERENCE 19/51227 (B) A NEW TEMPORARY SITE COMPOUND FOR USE DURING CONSTRUCTION (6) SITE DRAINAGE NETWORK (7) INSTALLATION OF INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING (7) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. A ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATIONGrounds not yet categorised
(1) REFURBISHMENT OF EXISTING COTTAGE TO INCLUDE A VIEWING WINDOW ON THE SOUTH-EAST GABLE WALL (SIDE ELEVATION WALL) AND ALL GLAZED PATIO DOORS ON THE NORTH-EAST WALL (REAR WALL) AND (2) CONSTRUCTION OF A NEW ENTRANCE AND DRIVEWAY FROM THE PUBLIC ROAD TO SERVE THE COTTAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) GROUND FLOOR EXTENSION TO EXISTING DWELLING HOUSE, (2) DORMER ROOF CONSISTING OF TWO BEDROOMS TO THE DWELLING HOUSE, (3) UPGRADING OF SEPTIC TANK AND INSTALLATION OF A PERCOLATION BED AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A TEMPORARY 100M METEOROLOGICAL MAST THAT WILL BE FIXED TO THE GROUND BY GUY WIRES, TOGETHER WITH ALL ANCILLARY SITE WORKS FOR A PERIOD OF UP TO FIVE YEARS FOR THE PURPOSE OF MEASURING LOCAL CLIMATE CONDITIONS AND COLLECTING METEOROLOGICAL DATAGrounds not yet categorised
CONSTRUCTION OF A NEW DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM & SEPARATE DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH RECONNECTION INTO EXISTING SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
MINOR INCREASE IN FLOOR AREA & ALTERATIONS TO THE FACADE PREVIOUSLY GRANTED UNDER 17/51333 AND PERMISSION FOR PROVISION OF OFF LICENCE AREA WITHIN EXISTING RETAIL SHOP AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
NO. 2 SHESKINATTINEY BRIDGE, GORTNAMUCKLAGH, GLENTIES LETTERKENNY PO
DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING WHICH WILL INCLUDE AN AMENDED DESIGN TO WHAT WAS PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 03/2597 AND AN EXTENSION TO THE SIDE AND REAR OF THE PREVIOUSLY APPROVED DESIGN TO INCLUDE A GRANNY FLAT AND CONNECTION TO ALL EXISTING SERVICES AND ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK DWELLING AND CONSTRUCTION OF A NEW REPLACEMENT DWELLING WITH CONNECTION TO ALL EXISTING SITE SERVICES & ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ST. COLUMBA'S COMPREHENSIVE SCHOOL, GORTNAMUCKLAGH, GLENTIES
ERECTION OF A CONTAINERISED BIOMASS PLANT ROOM AND A WOOD PELLET FUEL STOVE TO SERVE THE EXISTING SCHOOL AND ALL ASSOCIATED WORKSDecision record indexed
INSTALLATION OF A NEW TEMPORARY EFFLUENT TREATMENT SYSTEM IN LIEU OF CONNECTION TO THE PUBLIC SEWER PREVIOUSLY GRANTED UNDER PLANNING REF: 18/51241 AND ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE TO PROVIDE EXTRA LIVING ACCOMMODATION AND WITH MINOR ALTERATIONS TO THE FACADE OF THE EXISTING DWELLING TOGETHER WITH CONNECTION TO ALL EXISTING ON-SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CHANGE OF USE OF INDUSTRIAL SAWMILL TO A 16 BEDROOM TOURIST ACCOMMODATION FACILITY (2) CHANGE OF USE OF EXISTING DETACHED OFFICE TO COFFEE SHOP/SHOP (3) CONSTRUCTION OF 7 TWO-BED CABINS (4) CAR PARKING AND ASSOCIATED HARDSTANDING (5) TERTIARY WASTEWATER TREATMENT SYSTEM (WWTS) IN COMBINATION WITH SAND POLISHING FILTER (6) LANDSCAPING WALK INCLUDING A PEDESTRIAN BRIDGE OVER THE STREAM (7) STORMWATER DRAINAGE SYSTEM, INCLUDING AN OIL/PETROL INTERCEPTOR (8) DECOMMISSIONING OF 2NO. EXISTING SEPTIC TANKS (9) ALL ASSOCIATED SITE WORKSDecision record indexed
COMPLETION OF 22 NO. DWELLING HOUSES, PUMPING STATION, CONNECTION TO THE PUBLIC SEWERAGE SYSTEM, ENTRANCE AND ASSOCIATED SITE WORKS PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 06/31487Decision record indexed
REFURBISHMENT OF A DERELICT DWELLING AND CONSTRUCTION OF AN EXTENSION TO SAME WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed