High power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4 electric vehicle charging bays with 4 Tesla illuminated charging units and associated signage. II. Installation of associated purposed Tesla supercharger power cabinet equipment. III. Associated revisions to existing paved & landscaped areas including permeable paving asphalt installation in 4 proposed EV spaces. IV. Existing Tesla main ID Entrance signage and services column to be relocated. V. Erection of associated EV signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
A single storey extension to the side of the existing house (circa 66 Sq/M). The proposed extension consists of a new master bedroom with flat roof construction and a mono pitched roof over a new open plan living space & a link hallway with flat roof construction & all associated works.
Planning permission is sought for an extension to the existing Leopardstown Park Hospital, Foxrock, Dublin 18, D18 XH70. The proposed development on a 5.97 ha. site at Leopardstown Park Hospital which includes the Protected Structure Leopardstown Park House (RPS no. 1634) will comprise of the following: • The demolition of existing buildings comprising c. 248 sqm. of space including: existing single storey estates stores/ground staff building (c. 186 sqm. gross floor area) and the existing link building (c. 62 sqm. gross floor area) that connects the Glens building to the existing hospital. • The construction of a new c. 8,997 sqm. gross floor area extension to be developed to the south of the existing Leopardstown Park Hospital building which will consist of 2 no. residential care building blocks providing 125 no. single en-suite bedrooms (1 no. 2 storey residential care block containing 50 no. bedrooms and 1 no. 3 storey residential care block containing 75 no. bedrooms) along with day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities connected by a new single, 2 and 3 storey central circulation street which links back to the existing hospital at ground floor level. The new development will also include minor refurbishment to the existing hospital to accommodate the connection point to the new link for the proposed central circulation street. • The construction of a new single storey MEP Compound which will contain the replacement single storey estate stores and workshop (c. 457 sqm. gross floor area) with an enclosed external area of c. 595 sqm. The MEP Compound also contains a new ESB Substation. • Alterations to the existing 16 no. car parking spaces surrounding Leopardstown Park House (Protected Structure) and replacement with 66 no. car parking spaces, including 3 no. disabled and 12 no. EVC spaces. The addition of 3 no. car parking spaces and the realignment of the existing 30 car parking spaces to the north of the existing hospital (adjacent to the main entrance), including 3 disabled spaces and 5 P&T spaces. The addition of 10 new car parking spaces to the west of the main hospital building. The scheme proposes a total of 109 car parking spaces within the application red line boundary. •A new single storey, secure bicycle store enclosure (c. 27 sqm.) located to the east of the main entrance providing 12 no. long-stay bicycle spaces. Provision of 21 no. short-stay bicycle spaces (20 no. existing and 1 no. new cargo-bike space). •The demolition of a 16.5m section of the Walled Garden wall and a 14m section of the low-level garden wall (1990's construction), reduction in height of a 5m section of the garden wall, the creation of a new 3.5m window opening, the re-opening of an existing closed-up door way within the wall, and the relocation of a 33m section of gates and railings within the walled garden •The planting of 150 new trees to mitigate the removal of 106 trees (net increase of 44 trees). •Proposed modifications to the existing road network within the campus to access the new extension and associated MEP Compound, planted perimeter landscaping with fence along the north and west boundaries (c.1.8m high on northern boundary and 2.4m high on western boundary), temporary construction compound and construction road to the west of the hospital and general landscaping modifications including tree removal. •The proposed development also includes all ancillary site clearance, enabling, construction, site development and landscaping works, which include but are not limited to: temporary haul road and temporary construction compound, the diversion and upgrade of existing hospital campus site services, new infrastructural services, attenuation, watermains and communications networks, the upgrade of surface water services along the access road to the north of the hospital and all required phasing, sequencing and site development works. The Protected Structure stables building (RPS no. 1630) is outside, but immediately adjacent to, the application red line boundary. An Environmental Impact Assessment Report (EIAR) and a screening for Appropriate Assesment Report have been prepared in respect of the proposed development.
The proposed development will consist of: i) The demolition of existing buildings comprising c.104 sqm. of floor space including: the existing link building (c.62sqm. gross floor area) that connects the Glens building to the existing hospital, and three existing rooms to the south side of the main spine corridor, adjacent to the Day Care Centre (c.42 sqm); ii) The construction of a new c. 9,284 sqm. gross floor area extension to be developed to the south of the existing Leopardstown Park Hospital building which will consist of 2 no. residential care building blocks providing 125 no. single ensuite bedrooms (1 no. 2 storey residential care block containing 50 no. bedrooms and 1 no. 3 storey residential care block containing 75 no. bedrooms) along with day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities connected by a new single, 2 and 3 storey central circulation street which links back to the existing hospital at ground floor level. The new development will also include minor refurbishment to the existing hospital to accommodate the connection point to the new link for the proposed central circulation street. No works are proposed to Leopardstown Park House (A Protected Structure). iii) The construction of a new single storey Mechanical and Electrical Compound (c. 370 sqm. gross floor area).The Mechanical and Electrical Compound also contains an ESB Substation; iv) Reconfiguration of existing car parking layout to provide a total of 109 car parking spaces within the red line boundary, comprising: 99 standard spaces, 6 accessible spaces, and 5 parent and child spaces. A total of 22 spaces will have electric vehicle charging points, and ducting will be provided for an additional 44 electric vehicle charging points. A total of 5 motorcycle parking spaces will be provided. v) A new single storey, secure bicycle store enclosure (c. 27 sqm.) located to the east of the main entrance providing 12 no. long-stay bicycle spaces. Provision of 21 no. short-stay bicycle spaces (20 no. existing and 1 no. new cargo-bike space); vi) The relocation and repair of a 33m section of walled garden boundary railings and gates to replace the low-level garden wall (1990s construction), the reopening of an existing closed-up door way within the wall, and repair and refurbishment works to the original walled garden wall; vii) The planting of 4,940 new trees (168 semi-mature trees, 4,772 small trees) to mitigate the removal of 39 trees (net increase of 4,901 trees), and relocation of 5 existing orchard trees into woodland; viii) Proposed modifications to the existing road network within the campus to access the new extension and associated Mechanical and Electrical Compound, planted perimeter landscaping with fence along the north and west boundaries (c. 1.8m high on northern boundary and 2.4m high on western boundary), temporary construction compound and construction road to the west of the hospital and general landscaping modifications including tree removal and compensatory planting; ix) The proposed development also includes all ancillary site clearance, enabling, construction, site development and landscaping works, which include but are not limited to: temporary haul road and temporary construction compound, the diversion and upgrade of existing hospital campus site services, new infrastructural services, plant, SuDS drainage and attenuation measures, watermains and communications networks, the upgrade of the combined sewer and a new watermain along the access road to the north of the hospital and all required phasing, sequencing and site development works; x) An Environmental Impact Assessment Report (EIAR) and a Screening for Appropriate Assessment Report have been prepared in respect of the proposed development.
Permission is sought for Conversion of the attic space with three dormer windows to the front roof slope and one dormer to the rear of the house.
The development will consist of: Attic conversion for storage with dormer window to the rear. Raised gable to the side, New gable window to the side. Velux window to the front roof area.
Permission for development at this site. The development will consist of: A single storey ground floor extension to the rear and side with 4 no. roof lights.
Permission is sought for relocation of pedestrian
Permission is sought for a pedestrian
Permission for development at this site. The development will consist of: A single-storey ground floor extension to the rear and side with 3 no. roof lights.
Permission for A: Change of use of the existing stores
Permission for development at this site
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, roof windows to the front and flat roof dormer to the rear.
BHR Developments Ltd. intend to apply for Permission and Retention Permission on this site of c.1.768 ha at the former FAAC Site, Leopardstown Road and Burton Hall Road, Sandyford, Dublin 18. Planning permission will comprise of the following: • Demolition of the existing commercial building on site (c.4,600 sq.m Gross Floor Area (GFA)). Retention permission consists of the following: • Retention of the temporary site hoarding (2.4m high) erected along the site perimeter.
Permission sought for the erection of a part 2-storey, part single storey 3-bedroom, detached house on a site to the side of existing house, to include new vehicular entrance and 2 no. off-street car parking spaces and associated alterations and modifications
Permission for development. The development will consist of revisions to the single storey dwelling previously permitted under Reg Ref: D19A/0994 (PL06D.2307727) to provide additional accommodation comprising a bedroom and ensuite at ground floor level and associated internal reconfiguration at ground floor level. The floor area of the permitted dwelling increases from 316.4 sqm to 424sqm and the number of bedrooms increases from 3 to 4. The overall height of the building increases from 3.5m to 3.9m. The permitted access point from Ballyogan Road to the south is proposed to provide access to the site. The proposed development incudes all associated landscape and site works. Lisieux Hall is a Protected Structure (RPS No. 1662). No works are proposed to Lisieux Hall itself as part of the application.
Permission for development. The development will consist of
Single Storey Extension with pitched lean-to roof to side and rear comprising of dining/kitchen area and utility room.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, roof windows to the front and flat roof dormer to the rear. Conversion of existing garage to dining room comprising of replacing garage door with new window and new access door from existing hall. Construction of single storey flat roof extension to the rear comprising of family room, replacement of existing rear patio doors and window with larger slider and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Permission sought for: Ground floor extension to side
Permission for development. The development will consist/consists of the installation of an advertising sign promoting the Fónfix repair services. The sign will measure 3 metres high from path level and 1.8 metres wide.
Permission for development. The development will consist of: New dormer to rear of existing first floor roof, and associated works.
Conversion of attic to create store and work from home office with dormer to rear and 3no. velux rooflights to front.
Attic conversion for storage, including three dormer windows to the front roof slope and dormer to the rear roof slope.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, roof windows to the front and flat roof dormer to the rear.
Revision to Previously granted planning application register reference D23B/0260 comprising of attic conversion for two bedrooms with reduced dormer width to rear and 3 velux rooflights to front.
A) Retention of a single storey pitched tiled roof kitchen extension to rear with 4 no. rooflights and b) The attic conversion for two bedrooms with dormer windows to rear and 3 velux rooflights to front.
The development will consist of: a) A new 2 storey side extension with attic level accommodation. This includes the conversion of the existing garage and utility room at ground floor level. b) A new single storey extension to the rear. c) Alterations to the front elevation to include a new canopy over the entrance and bay window at ground floor level. d) All associated site works.
Atlas GP Limited intend to apply for planning permission for a Large-Scale Residential Development at this site of c. 0.89 ha at the Former Avid Technology site, at the corner of Blackthorn Road and Carmanhall Road, Sandyford, Dublin 18. The development will consist of: 1) 183 no. apartments within four blocks ranging from 4 to 13 storey high over basement as follows: 25 no. studio units, 29 no. one-bed units, 54 no. two-bed units, 75 no. three-bed units All residential units are provided with private balconies / terraces. A creche of c. 337 sq.m. to be located in block D. Communal amenity space (internal) c. 379 sq.m. to be located in Block D (facing Carmanhall Road) Public communal space (internal) c. 351 sq.m. to be located in Block E. Landscaped communal and public open space as follows: 1215 sq.m. of public open space plaza in the courtyard at ground level, 384.49 sq.m. of communal open space and 186.51 sq.m creche play area at ground level and 583.02 sq.m of communal open space at roof level across all blocks. 2) The provision of car, motorcycle and bicycle parking as follows: 64 no. car parking spaces at basement level, 428 no. cycle spaces, 388 of which are long term at basement level and 40 no. short term spaces at ground floor, 4 no. motorbike spaces at basement level, Residential storage space at basement level. 3) Provision of a new vehicular entrance from Carmanhall Road and new vehicular egress onto Blackthorn Road. 4) Telecom mitigation measures to be included 6 no. 300 mm microwave link dishes mounted on 3 no. steel support poles affixed to ballast mounts at roof level on Block D. The development also includes lighting, plant space, site drainage works and all ancillary site development works above and below ground. The application may also be inspected at the following website set up by the applicant: www.carmanhallroadlrd.ie
Permission for retention of the development consists of retaining existing storage structure with pitched roof to side and rear of existing dwelling.
Permission for demolition of vacant detached single storey
Development shall consist of 334 Build to Rent Residential Apartment Units within 4 No. apartment blocks and as follows: 79 No. Studio, 175 No. 1 bed, 80 No. 2 bed, All Residential units provided with private balconies/terraces to the north/south/east and west elevations, Creche 272 sqm., Residential amenity spaces 893 sqm. (including a unit of 146.5 sqm. open to the public, resident's gym, business centre, multipurpose room, staff facilities, multimedia/cinema room, shared working space, concierge and games room). Height ranging from 5 to 16 storeys (over basement). Landscaped communal space in the central courtyard. Provision of a new vehicular entrance from Carmanhall Road and egress to Blackthorn Road. Provision of pedestrian and cycle connections. 125 No. Car Parking, 6 No Motor Cycle Parking and 447 cycle spaces at ground floor/under croft and basement car park levels. Plant and telecoms mitigation structures at roof level. The development also includes 2 No. ESB substations, lighting, plant, storage, site drainage works and all ancillary site development works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan. The application contains a statement indicating why permission should be granted for the proposed development having regard to a consideration specified in Section 37 (2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. Website: https://carmanhallroadshd2022.ie/
Permission for a strategic housing development consisting of: (i) construction of a Build-To-Rent residential development within a new part six, part eight, part nine, part eleven storey rising to a landmark seventeen storey over basement level apartment building (40,814sq.m) comprising 428 no. apartments (41 no. studio, 285 no. one-bedroom, 94 no. two-bedroom & 8 no. three-bedroom units) of which 413 no. apartments have access to private amenity space, in the form of a balcony or lawn/terrace, an d 15 no. apartments have access to a shared private roof terrace (142sq.m) at ninth floor level; all apartments have access to 2,600sq.m of communal amenity space, spread over a courtyard at first floor level and roof terraces at sixth, eighth and ninth floor levels, a 142sq.m resident’s childcare facility at ground floor level, 392sq.m of resident’s amenities, including concierge/meeting rooms, office/co-working space at ground floor level and a meeting/games room at first floor level, and 696sq.m of resident’s amenities/community infrastructure inclusive of cinema, gym, yoga studio, laundry and café/lounge at ground floor level. The café/lounge will primarily serve the residents of the development and will be open for community use on a weekly/sessional basis; provision of 145 no. vehicular parking spaces (including 8 no. mobility parking spaces, 2 no. club-car spaces and 44 no. electric charging spaces), 5 no. motorcycle parking spaces, bin stores, plant rooms, switch room and 2 no. ESB sub-stations all at ground floor level; provision of bicycle parking (752 no. spaces), plant and storage at basement level; permission is also sought for the removal of the existing vehicular entrance and construction of a replacement vehicular entrance in the north-western corner of the site off Carmanhall Road; provision of improvements to street frontages to adjoining public realm of Carmanhall Road & Blackthorn Road comprising an upgraded pedestrian footpath, new cycling infrastructure, an increased quantum of landscaping and street-planting, new street furniture inclusive of bins, benches and cycle parking facilities and the upgrading of the existing Carmanhall Road & Blackthorn Road junction through provision of a new uncontrolled pedestrian crossing; and, All ancillary works including provision of play equipment, boundary treatments, drainage works - including SuDS drainage, landscaping, lighting, rooftop telecommunications structure and all other associated site services, site infrastructure and site development works. The former Avid Technology International buildings were demolished on foot of Reg. Ref. D16A/0158 which also permitted a part-five rising to eight storey apartment building. The development approved under Reg. Ref. D16A/0158, and a subsequent part-seven rising to nine storey student accommodation development permitted under Reg. Ref. PL06D.303467, will be superseded by the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2016- 2022 and the Sandyford Urban Framework Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.carmanhallroadshd.ie
Attic conversion to 2 no. habitable rooms and w.c. with dormer roof window on rear slope of roof and 3 no. Velux windows on front slope of roof at attic level. Stairs from first floor to attic level.
Proposed attic conversion to 2No. Habitable rooms & W.C. with dormer roof window on rear slope of roof & 1No. roof light on front slope of roof at attic level. Stairs from first floor to attic level.
Planning permission for (A) alterations to existing dwelling comprising (i) the extension of the existing rear dormer and the provision a new dormer to the front. (ii)the change of existing roof profile from hipped roof to gable roof. (iii) the removal of 2 no. chimneys (1 no. chimney at eastern elevation and 1 no. chimney at western elevation) and (iv) the provision of 5 no. rooflights. The alterations will facilitate an extended first floor level (87sqm) comprising 1 no. master bedroom (with en-suite and walk in wardrobe). 2 no. en-suite bedrooms with wardrobes, and hallway with staircase. (B)permission is also sought for all ancillary works necessary to facilitate development.
Retention & completion permission for development. The development consists of the retention and completion of bin & bike store, alteration to external ground levels approved under reg. ref. D18A/1000, and associated site works.
Permission for a strategic housing development at this site of c. 0.7 ha. The development will consist of 207 build to rent residential apartment units within 3 no. apartment blocks and as follows; 48 No. studio, 103 No. 1 bed, 55 No. 2 bed, 1 No. 3 bed. All residential units provided with private balconies/terraces to the north/south/east and west elevations. Creche 306 sqm. Residential amenity spaces 415 sqm. Height ranging from 6 to 10 storeys (over basement). A public pocket park on the corner of Carmanhall Road and Ravens Rock Road and landscaped communal space int he central courtyard. Provision of new vehicular entrance from Ravens Rock Road and egress to Carmanhall Road. Provision of pedestrian and cycle connections. Demolition of two light industry/office structures (total 1,613.49 sqm). 79 Parking spaces and 288 cycle spaces at ground floor/under croft and basement car park levels. Plant and telecoms mitigation structures at roof level. The development also includes 2 no. ESB substations, lighting, plant, storage, site drainage works and all ancillary site development works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan. The application contains a statement including why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Assessment Report has been prepared in respect of the proposed development
Permission for development at this site.
Retention permission for development. The development consists of fence enclosure to perimeter and associated access gates all to rear and sides of the premises
Permission fro the proposed demolition of existing
Permission is sought for a pedestrian
Permission for development. The development will consist of: Provision of 1no dormer type window and 1no velux type window to the rear and 3no velux type windows to the front of existing terraced house.
Planning permission for the installation of 180 No. Solar PV Panels across c.350m2 of roof, and all associated works on the roof
Attic conversion for one bedroom, and separate office area with dormer window to the rear roof area. Three new Velux windows to the front roof area.
Retention permission for development and permission for development on a site of approximately 0.25 ha, at an existing vehicle service workshop. The development for which retention permission is sought consists of the continued use of part of the building as a vehicle service workshop (c. 1,707 sq m). The development for which permission is sought consists of the change of use of part of the existing vehicle service workshop to motor sales showroom (c. 694 sq m). The proposed development will also include: internal and external (eastern (front) elevation facing Bracken Road and the southern (side) elevation facing the Audi Centre) alterations to the building to facilitate the proposed change of use; the erection of 5 no. new illuminated signs comprising 4 no. on the eastern (front) elevation facing Bracken Road (2 no signs c. 2.40 sq m each and 2 no. signs 2.23 sq m each), along with 1 no. (c. 2.40 sq m) on the southern (side) elevation facing the Audi Centre; together with all associated site development works.
A) Extension to existing kitchen to rear with recessed sides to bedroom and en-suite extension at first floor level. B) Attic conversion for home office and store with dormer window to rear and 3no. velux rooflights to front.
Permission for conversion of attic to non-habitable storage space with roof windows to front roof, Dormer to rear roof, gable window to side, first floor extension to rear and all with associated ancillary works.
Attic conversion for storage with full raised gable to the side, dormer windows to the front and rear, and a new window to the side gable.