to
to
Researching a specific site? Get a decision-ready site risk brief — €39 incl. VAT, PDF by email.Get a site risk brief

Planning records

Showing 151-200 of 35,696 public records
Page 4 of 20
  1. © OpenStreetMap
    SD22A/0047Granted

    41, Watermeadow Park, Oldbawn Tallaght, Dublin 24 D24CH7V

    Two-storey, 4 bedroom detached dwelling with vehicular access and 2 off-street, parking spaces and all associated site works at side garden plot.Decision record indexed
    Decision01 November 2022View record
  2. © OpenStreetMap
    SD19A/0358Granted

    27, Alpine Rise, Tallaght, Dublin 24

    Demolition of single storey detached garage in rear garden; construction of detached, two storey three bedroom dwelling with attic conversion in rear garden; new vehicular entrance & partial dishing of kerb.Decision record indexed
    Decision15 January 2020View record
  3. © OpenStreetMap
    SD25A/0013WGranted

    Belgard Retail Park, Belgard Road, Tallaght, Dublin 24

    Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.Decision record indexed
    Decision21 March 2025View record
  4. © OpenStreetMap
    SD26A/0046WRefused

    Unit 21, Site of c.1.28ha at, First Avenue, Cookstown Industrial Estate, Dublin 24

    Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.Grounds not yet categorised
    Decision14 April 2026View record
  5. © OpenStreetMap
    SD21A/0196Refused

    Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24

    Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.Grounds not yet categorised
    Decision08 September 2021View record
  6. © OpenStreetMap
    LRD23A/0010Refused

    Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24

    Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).Grounds not yet categorised
    Decision19 October 2023View record
  7. © OpenStreetMap
    SD22A/0361Refused

    Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24

    Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.Grounds not yet categorised
    Decision23 May 2023View record
  8. © OpenStreetMap
    SD19A/0397Granted

    Unit 11, Tallaght Retail Centre, Tallaght, Dublin 24

    Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.Decision record indexed
    Decision20 February 2020View record
  9. © OpenStreetMap
    SD24B/0218WGranted

    22, Cill Cais, Old Bawn, Tallaght, Dublin 24.

    Construction of single storey extension to the rear of existing dwelling comprising of open plan Kitchen/Dining and Living space.Decision record indexed
    Decision08 July 2024View record
  10. © OpenStreetMap
    SD25A/0001WGranted

    Sixth Floor, Tallaght Retail Centre, Belgard Road, Dublin 24, D24 Y66R

    Change of use of a vacant unit to four one bedroomed apartments.Decision record indexed
    Decision15 May 2025View record
  11. © OpenStreetMap
    SD26A/0099WGranted

    Sixth Floor, Tallaght Retail Centre, Belgard Road, Dublin, D24 Y66R

    Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.Decision record indexed
    Decision15 June 2026View record
  12. © OpenStreetMap
    SD20A/0050Granted

    Colberts Fort, Belgard Road, Tallaght, Dublin 24.

    Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.Decision record indexed
    Decision18 January 2021View record
  13. © OpenStreetMap
    SD21B/0369Granted

    26, Cúl Na Gréine, Dublin 24

    Attic conversion for storage with dormer window to the rear; garage conversion for additional bedroom; rear single storey extension 'Velux' window to the side.Decision record indexed
    Decision19 August 2021View record
  14. © OpenStreetMap
    SD21B/0303Granted

    73, Swiftbrook Drive, Dublin 24

    Single storey front extension and all associated site works.Decision record indexed
    Decision16 August 2021View record
  15. © OpenStreetMap
    SD20A/0203Refused

    Eir, Belgard Road, Dublin 24

    Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.Grounds not yet categorised
    Decision05 October 2020View record
  16. © OpenStreetMap
    SD24A/0134WGranted

    Roadstone Limited, Cookstown Road, Dublin 24, D24 PKK2

    To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone LimitedDecision record indexed
    Decision28 November 2024View record
  17. © OpenStreetMap
    SD25B/0572WGranted

    28, Watermeadow Drive, Oldbawn, Dublin 24, D24VCP2

    For the conversion of existing garage structure, new porch extension to the front elevation, new first floor extension over garage, new canopy roof alongside passage, new wall on party line on front elevation, new single storey Granny Flat Structure with new link to original house and all associated works. The Granny Flat space will consist of kitchen/living area, WC and bedroom.Decision record indexed
    Decision09 April 2026View record
  18. © OpenStreetMap
    SD24A/108WGranted

    5, Tig Mo Croí, Colbert's Fort Cottages, Tallaght, Dublin 24, D24 KW1E

    Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.Decision record indexed
    Decision04 September 2024View record
  19. © OpenStreetMap
    SD25B/0391WGranted

    8, Old Bawn Avenue, Oldbawn, Dublin 24, D24 DDC2

    The proposed development will consist of conversion of existing garage to living space, first-floor side extension above the existing structure, redesigned porch / entrance & ground floor extension to the rear and all associated site works.Decision record indexed
    Decision30 July 2025View record
  20. © OpenStreetMap
    SD20A/0010Granted

    Unit 8, High Street, Tallaght, Dublin 24.

    Change of use from office to medical/dentist use with revisions to front elevation.Decision record indexed
    Decision11 March 2020View record
  21. © OpenStreetMap
    SD21A/0070Refused

    75, Westpark, Tallaght, Dublin 24

    Two bedroom, double storey house.Grounds not yet categorised
    Decision18 May 2021View record
  22. © OpenStreetMap
    SD20A/0201Granted

    Technological University Dublin, Old Blessington Road, Tallaght, Dublin 24, D24 FKT9

    A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.Decision record indexed
    Decision18 December 2020View record
  23. © OpenStreetMap
    SD23A/0052Granted

    Plot Adjacent 4 Colberts Fort, Tallaght, Dublin 24.

    3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.Decision record indexed
    Decision04 July 2023View record
  24. © OpenStreetMap
    SD25A/0144WGranted

    Unit 81 A&B, Cookstown Estate Road, Cookstown Industrial Estate, Tallaght, Dublin 24, D24 YC0F

    Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.Decision record indexed
    Decision21 October 2025View record
  25. © OpenStreetMap
    LRD24A/0004WGranted

    Site at the Corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35

    Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.Decision record indexed
    Decision02 September 2024View record
  26. © OpenStreetMap
    SHD3ABP-305763-19Granted

    Site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35

    Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.Decision record indexed
    Decision20 February 2020View record
  27. © OpenStreetMap
    LRD24A/0005WGranted

    Corner of Airton Road and Belgard Road, Tallaght, Dublin, D24 HD35

    Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.Decision record indexed
    Decision02 September 2024View record
  28. © OpenStreetMap
    SD25A/0201WGranted

    Unit 2 / 3, Airton Plaza, Airton Road, Tallaght, Dublin D24 PY6R, & D24 HF6C

    The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.Decision record indexed
    Decision21 October 2025View record
  29. © OpenStreetMap
    SD25A/0113Granted

    ESB Telecommunications Compound, Belgard 38KV Substation, Belgard Road, Tallaght, Dublin 24

    Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.Decision record indexed
    Decision08 July 2025View record
  30. © OpenStreetMap
    SD20B/0342Granted

    123, Tymon Crescent, Dublin 24

    Demolition of the existing entrance porch and single storey converted garage to side; construction of a new single storey extension to front, side and rear; rooflight to side; front gate and associated external works.Decision record indexed
    Decision09 November 2020View record
  31. © OpenStreetMap
    SD24B/0227Granted

    121, Watergate, Tallaght, Dublin 24

    Construction of proposed first floor Extension above existing garage at gable end of house. Conversion of existing loft area and the construction of a dormer structure with window to rear roof profile also all associated site works.Decision record indexed
    Decision12 July 2024View record
  32. © OpenStreetMap
    SD21A/0293Refused

    Vacant garden plot site adjacent to 36, Montpellier View, Dublin 24

    Construction of a detached, three bedroom dwelling at the vacant garden plot to include dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off-street parking space and all associated site works.Grounds not yet categorised
    Decision13 December 2021View record
  33. © OpenStreetMap
    SD22A/0276Refused

    Vacant garden plot site adjacent to 36 Montpelier View, Dublin 24

    Detached 2 bedroom dwelling at the vacant garden plot site including dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off street parking space and all associated site works.Grounds not yet categorised
    Decision10 August 2022View record
  34. © OpenStreetMap
    SD23A/0217Refused

    1, Watermeadow Drive, Old Bawn, Tallaght, Dublin 24

    Demolition of side garage and building 2 new two storey dwelling houses on site, internal front garden alteration to existing vehicular access to public roadway to serve existing dwelling house. Forming new shared vehicular access to public roadway to serve the proposed 2 new dwelling houses, and all associated ancillary site works at 1 Watermeadow Drive, Old Bawn, Tallaght, Dublin 24, D24 NY7RGrounds not yet categorised
    Decision27 May 2024View record
  35. © OpenStreetMap
    SD24A/0228Granted

    1, Watermeadow Drive, Old Bawn, Tallaght, Dublin 24

    Demolition of side garage and building 2 dwelling houses on site (1 semi-detached, 1 detached) internal front garden alteration to existing vehicular access to public roadway to serve existing house. Forming new vehicular access on the eastern boundary to serve the 2 new houses, and all ancillary works.Decision record indexed
    Decision11 December 2024View record
  36. © OpenStreetMap
    SD22A/0005Refused

    1 Watermeadow Drive, Old Bawn, Tallaght, Dublin 24.

    Demolition of side garage and building 2 two storey dwelling houses on site, using existing vehicular access to public roadway to serve 1 new dwelling, forming 2 new vehicular access to public roadway to serve other new dwelling and existing dwelling.Grounds not yet categorised
    Decision27 September 2022View record
  37. © OpenStreetMap
    SD20A/0168Refused

    1, Watermeadow Drive, Old Bawn, Tallaght, Dublin 24.

    Demolition of side garage and building 2 new two storey dwelling houses on site, each new dwelling containing 1 family flat unit, using existing vehicular access to public roadway to serve 1 new dwelling house. Two new vehicular access to public roadway to serve other new dwelling house and existing dwelling house. All associated ancillary site works.Grounds not yet categorised
    Decision08 March 2021View record
  38. © OpenStreetMap
    SD20A/0347Granted

    89, Watergate, Dublin 24

    Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.Decision record indexed
    Decision20 July 2021View record
  39. © OpenStreetMap
    SD24B/0358Granted

    107, Watergate, Dublin 24

    The development will consist of a single storey rear extension and a single storey front extension to the existing two storey terraced house and will include internal alterationsDecision record indexed
    Decision03 October 2024View record
  40. © OpenStreetMap
    SD19A/0390Granted

    17/18, Tramway Court, Old Blessington Road, Tallaght, Dublin 24

    Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.Decision record indexed
    Decision18 February 2020View record
  41. © OpenStreetMap
    SD23A/0122Refused

    Unit 2-4, Tramway Court, Old Blessington Road, Tallaght, Dublin 24

    Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.Grounds not yet categorised
    Decision21 November 2023View record
  42. © OpenStreetMap
    SHD3ABP-309916-21/EPGranted

    Glen Abbey Complex, Belgard Road, Cookstown Industrial Estate, Dublin 24, D24 W2XA

    Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.Decision record indexed
    Decision24 November 2025View record
  43. © OpenStreetMap
    SHD3ABP-309916-21Granted

    Glen Abbey Complex, Belgard Road, Cookstown Industrial Estate, Dublin 24, D24 W2XA

    Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).Decision record indexed
    Decision21 September 2021View record
  44. © OpenStreetMap
    SD24B/0232Granted

    83 Tymon Crescent, Old Bawn, Tallaght, Dublin 24.

    Planning permission for conversion of attic to non-habitable storage space with partial Extension of ridgeline to accommodate a contemporary dormer to rear roof. Single Storey extension to rear of existing house, single storey porch extension and extended bay extension to front of existing house all with ancillary worksDecision record indexed
    Decision18 July 2024View record
  45. © OpenStreetMap
    SD23B/0210Granted

    27, Westpark, Tallaght, Dublin 24

    The development seeking retention consists of the construction of a fence on top of the existing block wall along the side and rear boundaries of the propertyDecision record indexed
    Decision29 June 2023View record
  46. © OpenStreetMap
    SD25B/0013WGranted

    22, Old Bawn Avenue, Old Bawn, Tallaght, Dublin 24, D24NC5F

    For the construction of new dormer structure to the rear and conversion of attic space with en-suite and associated works.Decision record indexed
    Decision28 February 2025View record
  47. © OpenStreetMap
    SD22A/0424Granted

    Glen Abbey Complex, Belgard Road, Dublin 24

    Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.Decision record indexed
    Decision24 May 2023View record
  48. © OpenStreetMap
    SD23A/0186Granted

    Building 1, Units 1a, 1b, 1c, Buildings 81a and 81b, Cookstown Estate Road, & Buildings 2 & 3, at Old Belgard Rd, Cookstown Industrial Estate, Dublin 24

    Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.Decision record indexed
    Decision28 September 2023View record
  49. © OpenStreetMap
    SD24B/0585WGranted

    64, Tymon Crescent, Tallaght, Dublin 24, D24PNH5

    The development consists of a first-floor side extension with tiled hip roof and parapet with roof light, attic conversion with dormer roof and windows to the rear, tiled canopy to the front elevation, two roof lights to the front of the existing roof, internal alterations, and all associated site works.Decision record indexed
    Decision25 February 2025View record
  50. © OpenStreetMap
    SD26A/0013WRefused

    1, Cloonmore Drive, Tallaght, Dublin 24

    For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.Grounds not yet categorised
    Decision12 March 2026View record
Showing 151-200 of 35,696
Page 4 of 20