For development which will provide for the upgrade of the Dromoland Castle Wastewater Treatment Plant and will comprise of: (1) the demolition of the existing above ground wastewater treatment plant tanks; (2) construction of a new inlet works on a raised platform; (3) construction of two new SBR streams to provide secondary treatment; (4) construction of new stormwater holding tanks and sludge storage tank; (5) Construction of a supernatant pumping station, (6) Installation of new control panel kiosk enclosure on a raised platform; (7) Installation of a new chemical dosing system; and (8) all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
The development consists of the construction of a slatted unit and associated site works
For development which will consist of the construction of a slatted cubicle unit, silage slab and associated site works
For alterations, changes to elevations and floor area increase to the existing dwelling house including all ancillary site works
To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
Of a garage and tennis court to the rear of the dwelling
For new domestic entrance and all associated site works
To extend existing house at Carrowmeer, Newmarket on Fergus, Co Clare The application consist of a single storey extension to the rear of the existing house and all associated site works
For development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works
For the construction of an extension to existing shed/studio to comprise of home gym including ancillary site works
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
(planning ref. no P22-700) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a single storey detached work studio to the front and side of an existing dwelling and all ancillary site works.
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For the development of an extension to existing dwelling which will include a side and rear extensions and all associated site works
The development consists of the construction of a slatted unit and associated site works
To retain workshop
For the Construction of a Single Storey Dwellinghouse, New Vehicular Entrance & Proprietary Waste Treatment Plant including all ancillary site works
To install an Ancillary Living Unit, connections to services and all ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
To (a) Construct side extension and fenestration changes to existing cottage (b) Construct detached domestic garage together with all associated site development works and services
To carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4
To retain existing portacabin (granted planning under reference number P21/471) which is being used as a pre-school Building on site
To RETAIN existing portacabin (granted planning under reference number P16/227 which is being used as a pre-school building
For the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
The development will consist of the construction of a 64 square meter single storey freestanding music/exercise space and study to the rear of the existing dwelling house with alterations to site works and services
For a one storey dwelling house and garage with wastewater treatment system and polishing filter and associated site works
To change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the following works, (a) Modify the internal layout and make changes to the elevations of both the existing dwelling and granny flat. (b) Construct extension to rear and porch to front of dwelling, and (c) Construct extension to side of granny flat, all with associated site works
For (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
To erect signage to logistics (warehouse and distribution) building
To construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development
For development at this site in the townlands of Clonloghan and Caherteige, Co. Clare. The proposed development consists of an amendment to Condition No. 4 of the previously approved parent planning permission (Planning Ref. 18585), which relates to the operational life of the development. The proposed amendment seeks to extend the operational life of the permitted development from 25 years to 37 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
To construct a steel shed and all associated site works
For the installation of a Modular Home to be used as an Independent Living Unit with connection to existing wastewater treatment system including ancillary site works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house and garage, with wastewater treatment system of mechanical aeration system and polishing filter, and associated ancillary site works
For the proposed installation of solar panels on a steel frame structure to be erected over the roof of an existing telecommunication cabin (covering an area of approximately 48 sq.m to a maximum height of 4.8 metres above ground level). To include all ancillary development works and landscaping to the southwest of the telecommunications compound
To extend the existing 30 metre high, free standing lattice communication structure by an additional 3 metres in height to allow for additional antennae, dishes and all ancillary equipment at ESB Telecoms Ltd Telecommunications Compound at ESB Drumline 110kV Substation
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
Of the conversion of the attic to comprise of bedroom with en-suite and walk-in-wardrobe and games room with 5 existing roof windows to rear & retention of the garage as constructed including ancillary site works. PERMISSION to install two roof windows to the rear roof of the existing dwelling.
To construct an extension to existing dwelling to comprise of kitchen / dining / livingroom and utility including the refurbishment and modification of existing dwelling and permission to demolish existing extension to west of dwelling including all associated site development works
To construct a slatted cubicle unit, 3 bay machinery shed and all ancillary site works
For an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works
To retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works
For the construction of a domestic garage to the rear of the existing dwelling including ancillary site works