The development will consist of change of use from Retail use to retail use with ancillary off licence use
Design alterations to development permitted under ref. SD21A/0347 (extension to paint workshop) involving removal of existing 436sq.m store unit and enlargement of the permitted 980sq.m extension to 1,661.1sq.m (an increase of 681.1sq.m, bringing the total paint workshop unit to 3,216sq.m), together with new steel roof sheeting at the northern entrance to the permitted extension and the provision of 2 accessible parking bays and 2 electric vehicle parking bays and all associated site development works.
Construction of a single storey extension (980sq.m) to paint workshop with canopy; two access doors with roller shutters and all associated site development works.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
(I) Change of use of ground floor (1,002 sq.m gross) from wholesale light manufacturing uses for the clothing trade to light industrial with ancillary testing area (fitting rooms, club building workshop putting and chipping greens and fitting bays) for sports equipment manufacture and an area of display of golf equipment and clothing/accessories for wholesale, together with associated/ancillary reception area, refuse storage, bicycle parking (5 no. spaces) and circulation.(ii) Provision of a new first floor of 833 sq.m gross for use as light industrial use to facilitate electric buggy repair (428 sq.m) and staff canteen (75 sq.m), together with associated/ancillary circulation (iii) Provision of a new second floor of 810 sq.m gross for use as storage, including plant. (v) Minor amendments to roof to facilitate AOV's and air extract ducts (vi) 1 no. new non-illuminated sign of 20.2 sq.m on the south-west (rear) elevation and 1 no. illuminated (blacklit) sign at fascia level to the north-east elevation 2.15 sq.m.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
Retention permission is sought for an existing free standing advertisement sign located within the subject grounds fronting onto the junction of Upper Ballymount Road and Calmount Road Dublin 24.
Demolition of industrial shed attached to existing industrial building.
A new single storey ground floor extension to front side & rear of property with pitched roof and new roof windows, comprising of a bedroom, toilet & utility room.
The installation of 1No. Skylight and all associated works in the Roof
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Construction of a two storey motorcar retail showroom (c. 904sq.m); 2 floors of ancillary offices and associated uses; access to be provided from existing entrance the internal circulation road to the west; provision of 19 visitor and staff surface car parking (1 disabled access space, 2 electric vehicle charging spaces and 4 bicycle parking spaces); 89 spaces for the display and valet of vehicles, including display area; signage comprising 3 totem signs (2 x 6m and 1 x 7.5m in height) and 5 elevational signs (c. 20.19sq.m of signage in total); single storey substation and bin store as well as all associated infrastructure, landscaping and associated site development works including plant and PV panels at roof level all on a site of c. 0.59ha.
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Conversion of Attic Space to non-habitable space dormer to rear, 2no Velux to front, door to side, single storey extension to rear and all associated site works
Construction of an extension at first floor level to the front (north) elevation providing an additional 2 bedrooms to the property together with a single storey rear extension providing an additional living room area and wc; with all associated removal works to the existing roof, removal of wall sections, removal of existing windows, site development works, drainage and landscaping.
The change of use from warehouse to data repository facility, alterations to external facades, provision of a new 1100mm parapet, reclad roof, internal alterations, refurbishment of the existing office space, solar panels at roof level, external plant at ground and roof levels and equipment to include 12 condenser modules, an emergency back-up generator and associated fuel storage tank, transformer, extension to the existing sub-station (c. 13sq.m), 2 sprinkler tanks and pumphouse, bin store, 22 parking spaces including 2 electrical vehicle charging points, bicycle parking shelter, landscaping, planting, new security fence, external lighting, CCTV, altered vehicular gates, permeable hard surfaces, alterations to internal foul sewerage and water supply networks, provision of SuDS compliant surface water drainage system and all associated site works.
Change of use of c.12.25sq.m of floorspace within the existing warehouse building on site, from warehouse use to use for the temporary storage of shredded electrical & electronic equipment and components.
The installation of a new external door to the rear facade & internal alterations at ground floor.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
The construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, and associated ancillary drive thru lane, located to south of the permitted Apex Hub at Ballymount Industrial Estate (permitted under Reg. Ref.: SD22A/0099 as amended); The ancillary drive-thru lane, includes a canopy and service hatch on the northwestern elevation side of the unit, a height restrictor / entrance barrier on the access lane and a 3.5m wide drive-thru lane; The proposal includes associated drive-thru signage consisting of 1 no. directional sign, 1 no. order station, and 2 no. menu boards/advertisement signs and tenant signage on the southeastern, northeastern and northwestern elevations; The development includes associated soft and hard landscaping, associated outdoor seating area and external bin store for the proposed café/restaurant unit; The development includes a total of 19 no. car parking spaces including 4 no. EV spaces, 2 no. accessible spaces and 3 no. Staff parking spaces, waiting area, bin store and 10 no. cycle parking spaces; The development includes the repositioning of 2 no. permitted pedestrian crossing to the east of the site (permitted under Reg. Ref.: SD22A/0099); and All associated development. The proposed café/restaurant, with associated ancillary drive-thru lane, supersedes the permitted café unit on the subject site under Reg. Ref.: SD22A/0099.
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross Floor Area: 17 sq.m) including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi store at Belgard Road, Tallaght, Dublin 24 D24 VY77.
The retention of the change of use for the portion of site highlighted on the accompanying drawings into commercial use for the sale of motor vehicles. The retention of the additional staff cabin accommodation of 48.77 sq.m gross floor area, clad in aluminium to selected colours to match the adjacent main car showroom building The retention of the following site works; creation of new hard standing areas for the parking of cars, the construction of a new retaining wall boundary with railings over to the east, the erection of new palisade fencing and gate to delineate the new from existing site, removal of existing foliage The retention of building signage displaying company name and logo of 4.2 sq.m
Single storey outbuilding (29.14sq.m) to rear of overall property and associated site works.
Garage conversion and extensions at first floor to side and at ground floor with level access deck to rear.
Erect 525sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Construction of single storey extension with flat roof to the rear of existing house; alterations to ground floor plan; roof light to the rear and all associated works.
Planning Permission for the Demolition of existing Garden Shed and proposed creation of new work from home office/ home gym and garden toom to the rear of existing dwelling
Retention of 2 single storey extensions to the industrial use at Plant Area 2 including a 124sqm extension with a sliding door entrance and a sloping lean to roof to the east and a 34sqm extension with a rolling shutter and a sloping lean to roof at the south west; and all associated site works.
The development seeking retention permission consists of the construction of a single-storey porch to the front of the house, alterations to existing vehicular entrance and the application of stone cladding to the front of the house at ground floor level. The development seeking permission for development consists of narrowing the existing opening to 3.5m.
Demolition of previous flat roof rear extension; single storey mono pitched roof front extension (full width of existing house); single storey flat roof rear extension; conversion of existing garage to habitable use and internal alterations at ground and first floor levels; Attic conversion to include the reconfiguration of the side roof profile from hipped to half hipped and including dormer window structure within the rear roof slope; rooflights within the front and rear slopes; detached single storey flat roofed shed/home gym building within the rear garden; all necessary ancillary site development works to facilitate this development.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
Partial Demolition of Garage Area. Conversion of remaining portion with new ground floor extension to front, 2no of dormer type windows to front elevation, 1 no of dormer type window to rear elevation with internal modifications and associated site works
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Erection of a new 2 storey extension to the side, with internal modifications and associated site works.
Planning permission for a proposed change of use of 3,875 sq.m. floorspace from office-based industry to office use. The proposed development also includes reconfiguration of car parking area resulting in replacement of 4 no. existing car parking spaces with 40 no. bicycle parking spaces, along with all associated site works to facilitate the development.
Detached industrial unit comprising 960sq.m of workshop area plus 720sq.m stores/offices/staff facilities on two floors totalling 1680sq.m together with hardstanding area, diesel storage tanks, wash bay facilities, site boundary walls/fencing and all associated site development works.
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
The reconfiguration of 47No existing staff car parking spaces to allow for safer movement of vehicles and temporary storage of materials elsewhere in the existing yard, including new staff vehicular and pedestrian entrances and other associated minor works which are similar to what is currently permitted as part of a more substantial development Reg Ref SD19A/0222
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Alterations to Unit 6 permitted under Reg. Ref.: SD22A/0099 The proposed alterations to the permitted Unit 6 are as follows: Internal alterations at the ground floor level of the permitted warehouse/logistics unit to provide additional ancillary staff welfare facilities, an ancillary trade counter and associated office and storage area, and an ancillary innovation area / testing room; Repositioning of Stair Core 2 at ground and first floor level and proposed extension to the ancillary office floorspace at first floor level, with an additional gross floor area of 110 sq.m; Provision of a first-floor mezzanine level of additional warehouse/logistics floorspace with a GFA of 1,180 sq.m, accessed by new stairs from ground floor level; Alterations to the permitted elevational treatment, including: Reconfiguration and additional glazing on the south-east, south-west and north-east elevations as a result of the proposed internal layout alterations; Removal of the office entrance on the south-east elevation and opaque glazing screen from the WC core on the south-west elevation; Alterations to the cladding arrangements and parapet levels on all elevations (no increase in permitted building height); Central repositioning of grade and dock loading doors on the north-west elevation; Additional entrance doors along the south-west elevation to align with the revised internal layout; Other associated alterations including to the landscaped areas and the extent of boundary fencing; Reconfiguration of the car parking layout, including provision of 3 no. additional parking spaces (40 no. spaces in total, including 2 no. accessible spaces and 8 no. EV charging car parking spaces); Provision of 6 no. additional EV charging spaces for delivery vans to the north of the unit within the service yard; All associated site development works. The proposed alterations result in an overall increase of 1,279 sq.m in the total GFA of the warehouse/logistics unit from 3,997 sq.m to 5,276 sq.m (including ancillary office, trade and staff welfare facilities).
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Extension of the existing depot to provide additional bus parking facilities comprising a total of 221 bus spaces (including 45 electric bus parking spaces), 33 car parking spaces (including 15 electric car parking spaces), 5 motorcycle parking spaces and 30 bicycle parking spaces; revisions to the layout and configuration of the existing bus and car parking areas; the installation of electric vehicle charging units and associated infrastructure; new vehicular entrance/egress arrangement (including barrier and ramp) to Ballymount Avenue on the north-eastern site boundary; the provision of 4 pedestrian entrances located on the south-eastern, south-western and north-eastern site boundaries; internal roads and pedestrian pathways; minor elevational amendments to the existing transport depot building (relocation and addition of roller shutter doors and relocation of signage); hard and soft landscaping; boundary treatments; changes in level; lighting; surface water drainage; piped infrastructure and ducting, and all associated site excavation and development works above and below ground. (The development will also include the underground diversion of the existing ESB power line traversing the south-eastern corner of the site.)
Widening the existing main vehicle entrance by removing one pillar and replacing with a new pillar. That will widen the opening from existing width of 2750mm to a new opening width of 3500mm. All above together with all associated site works.
Single storey domestic extension to the rear of the existing dwelling incorporating an extended dining, sitting and kitchen area; the conversion of the existing garage to a living room; a new porch to the front of the dwelling; a new foul drain connection from the dwelling to the main public foul drain on the roadway. All of the above together with all associated site works.
Single storey domestic extension to the rear incorporating an extended dining, sitting and kitchen area; conversion of the existing garage to a living room; porch to the front and all associated site works.
New porch extension to front, demolition of existing sunroom/conservatory and erection of a new ground floor extension to rear, with internal modifications and all associated site works
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.