Construction of slate clad pitched roof structure not exceeding 8.950m in height above ground floor to cover existing flat roof, to include new dormer roof over stairwell and frosted window to new attic landing level, area 5.67sq.m with roof light over & 'Velux' window within front storage space to east elevation & 'Velux' window within rear storage space to north elevation & associated site works.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to attic landing level; roof light over and 'Velux' window to front storage space and all associated site works.
Retention for carwash facility.
Retention of carwash facility including a single storey portacabin office (10sq.m) with a covered carwash area (22sq.m).
Slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m with roof light over & 'Velux' window within front storage space to west elevation and all associated site works.
Modifications to dwelling incorporating relocation of entrance door to front elevation; insertion of a single entrance door and associated blockwork in lieu of existing up and over door to garage; new pitched tiled roof over existing single storey element to dwelling; modification to window and door openings at ground floor level on rear elevation; increase in width of existing vehicular entrance.
Ground floor partial front extension; ground floor side extension with 3 rooflights over; ground floor rear extension with 1 rooflight over; all with pitched roofs over; dormer roof window on rear slope of roof at attic level.
Opening ceremony of the Ireland Games comprising of a procession, ceremony, speeches and entertainment. Audient will include family members, supporters, sponsors and guests of Special Olympics Ireland.
Planning permission is sought for proposed dormer extensions to the rear and to front as well as attic Conversion and for single storey ground floor extension to front
Ground floor and front and side extension with pitched roof over, ground floor rear extension with flat roof over and 2 no. roof lights over.
Single storey side garage for demolition. Construction of 2 storey side extension with ground floor front extension and rear first floor extension with pitched roofs over and with 2 roof lights over in rear slope of roof.
Change of use of two existing retail units No's. 15-16 located at first floor level from retail use into a Pilates facility; demolition of the separating walls between the two existing retail units and the amalgamation of the two separate units No's. 15-16 into one large single unit with a new internal layout to include new treatment room; provision of one new external advertising sign to the front elevation at first floor level just below the existing parapet level to be similar in style to other existing adjacent signs to the Shopping Centre.
Change of use from retail pharmacy use to medical and related use and the incorporation of Unit 4 into existing Centric Medical Practice at Units 2 & 3 to include alterations to existing shop fronts; relocation of entrance doors and minor alterations to internal layout of Medical Practice.
Installation of gate and replacement of section of existing railings with higher railings all at the Western Pedestrian Entrance to Marlfield Mall, Kiltipper, Dublin 24
Single-storey flat roof extension to the side and rear, incorporating three rooflights. Partial demolition and height reduction of the front boundary wall. Relocation of the side access gate to the rear garden.
The development will consist of (a) the change of use of a retail unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, (b) the installation of 2 no. projecting signs, and (c) all associated site works.
Replacement of existing signage and lighting with 3 new signs (4.3sq.m each) and new lighting at end tower.
The proposed development will consist of: Change of use of part of the ground floor level (492 sqm) from bar/restaurant to gym. Change of use of the basement floor level (618 sqm) from night club to gym. Removal of the mezzanine levels at ground and basement floor levels. Associated modifications to the layout at ground and basement floor levels to accommodate the proposed change of use and All associated site development works.
Construction of a new single storey side extension on the western boundary of detached house and all associated works.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Change of use of the fifth floor level from office to hotel use to provide for 26 hotel suites; Associated modifications to the layout and elevations at fifth floor level and to the stair cores at ground to fifth floor levels to facilitate access and egress; Introduction of lobbies to the stair cores at basement level; Provision of a green roof to the existing building on site; Revisions to the existing car and bicycle parking arrangements at basement level; All associated site development works.
Install a 21 metre monopole carrying telecommunications and broadband equipment, together with associated equipment and cabinets enclosed within a 2.4 metre palisade fence compound at Thomas Davis GAA Club, Kiltipper Road, Tallaght, Dublin.
The installation of 1.8 m high, 1.42 wide, 0.51m deep above ground natural gas pressure reduction cabinet and an accompanying 3.25m vent stack with all ancillary services and associated site works.
New dormer roof structure in existing rear concrete tiled roof structure with two no. ventilated rooflights, convert existing attic area into a non-habitable attic area and internal alterations
Provision of a new lift to service the mezzanine & first floor of the building; construction of new sanitary facilities including accessible sanitary facilities on the first floor of the building; extension of existing internal mezzanine floor; internal modification to the existing building layout; no alterations are proposed to the external facade of the building as part of this planning application; all other associated ancillary site works.
Demolition of single storey rear extension and shed structure and the construction of new double storey rear extension. The works will comprise of new kitchen area with utility at ground floor and extension of bathroom and rear bedroom at first floor and all associated works.
Retention of existing signage to the front of the unit including: 1 no. 9m x 1.5m lightbox with printed graphic and returns; 3 high level vinyl graphic signs total area 46sq.m; 2 No. 6.56m high vinyl graphic signs to flanking windows; 1 No. 300mm vinyl graphic strip forming archway 3.58m wide by 2.36m high; 2 No. 300mm vinyl graphic strips to entrance doors; 80mm wide strip to windows either side of entrance door to total length of 6.14m; and 1 No. 4.32m wide by 0.8m high Dibond graphic panel to trolley bay.
Construction of a new 125sq.m (9.0m high) single storey side extension to existing facility for the storage of materials ancillary to the existing business currently operating on site with minor internal modifications and associated site development and ancillary works.
The development will consist of a 2-Story extension to the rear of the terraced house to increase living area on ground floor and bedrooms on first floor inclusive of internal modifications. Proposed external finishes to match and align with existing dwelling inclusive of all associated site works.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.
Retention Permission for a detached single storey garden room to the rear garden.
The permanent retention of a 174.4 sq.m extension to the rear of existing industrial/warehouse building and a two storey office and store (c. 56.4 sq.m) to the front that are subject to temporary planning permission per reg ref SD18A/0362.
Provision of a shopping trolley bay, and remove existing, and associated works at the surface level carpark of the Arena Centre, Whitestown Way, Dublin 24
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
Change of use from Licensed Premises to Commercial/Retail units at first floor level and alterations to layout of 2 entrance lobbies of the licensed premises at ground floor to accommodate independent entrance and fire escape from first floor.
Two bedroom, double storey house.
The development seeking retention consists of the construction of a fence on top of the existing block wall along the side and rear boundaries of the property
Change of use from coffee shop to hot food takeaway.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
Alteration of the external finish of the rear elevations of the duplex units to change from brick to plaster; This alteration also applies to the side and front of the end units to each row.
Proposal is to convert the existing attic space for occupation. Comprising of 1no bedroom, 1no en-suite and 1no wardrobe. Proposal includes erection of gable end wall to the side a flat dormer to the rear and a small Velux to the front. windows have been placed to match the existing surroundings while also providing a means of emergency escape should the access stairway become blocked. The dormer has been stepped back from the boundary wall of the neighbouring property in accordance with the SDCC House Extension Design Guide 2025. Dormer roof would be slopped approx. 1;80 to allow rain aggress via additional drainage which links into the existing drainage. 1no small Velux window is proposed to the front which also provides an additional emergency escape route, similar planning was sought and granted previously (2021), however with this application we have scaled back the extent of the proposal to only include the attic conversion. That planning reference was SD21B/0468. All external finishes will be such that they match the typical finishes within the area. The house is not overlooked directly from the rear. Sunlight / shadowing will not interfere with neighbouring properties due to the west facing orientation of the property. This proposal is similar to other dormers in the estate, one example is at SD19B/0465
Side extension consisting of ground floor living room & utility room; level 1 bedroom and attic conversion.
Single Storey Extension to the Front, Side and Rear. The front section being a Porch.
A 68.6sqm internal extension to the existing first floor, alterations to front elevation to include new sliding doors and change of use of the entire building from motor sales workshops to funeral home support services.
Conversion of attic space to non-habitable space with dormer window to side & 'Velux' rooflights to rear of existing dwelling and associated site works.
Build-up of existing hip in roof to side of roof into gable end with window in proposed gable wall at attic level; Attic conversion with W.C. dormer roof window and 1 roof light in rear slope of roof all at attic level.
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
Construction of a two storey extension to the side; zinc finish canopy, brick cladding and external alterations to front of house; single storey extension to rear of house; all associated site works and all ancillary minor works.
• Part change of use at ground floor level from office use to warehouse / logistics use (with a Gross Floor Area (GFA) of 944 sq.m) and light industry- manufacturing / food processing use (GFA of 1,860 sq.m), including ancillary staff welfare facilities, with the remainder of the existing floorspace (GFA of 712 sq.m) unchanged from the existing office use; • Proposed extension to the rear / south elevation of the existing building (with a GFA of 861 sq.m), comprising one level with a height of 7.47m, to provide an additional ancillary store to the proposed light industry- manufacturing / food processing use; • Proposed two storey extension (GFA of 13 sq.m) to the north elevation to provide an additional lift shaft and proposed extensions to the northern and west elevations to provide additional lobby / entrance areas (12 sq.m); • Provision of additional floorspace at first floor level (within the existing building envelope) to provide an additional 1,040 sq.m (GFA) of office floor space, ancillary staff welfare facilities, ancillary innovation and testing rooms, storage and plant rooms, and an additional 163 sq.m (GFA) of a mezzanine storage area; • Associated internal reconfigurations and installation of new internal partition walls, and associated alterations to the elevations including materials and fenestration arrangement, additional loading bays and roller shutter doors; • Provision of associated signage including an internally illuminated sign adjacent to the security entrance gate, a directional sign, internally illuminated signage over the entrance doors to the unit and 2 no. signs over entrance canopies; • Reconfigured car parking to provide 72 no. car parking spaces (a reduction from 134), widening of the internal service road, provision of new pedestrian footpaths from the estate road, internal segregated pedestrian footpaths and crossing, and the provision of a security fence and gate; • The proposal includes dock leveller, landscaping, bicycle store, external store with WC/garden store/bin store, plant compound, PV panels to new rear extension roof and bicycle store roof, surface water drainage, including detention pond and swale, and all associated works. The proposed development results in an overall increase of 2,089 sq.m in the total GFA of the unit from 3,516 sq.m to 5,605 sq.m, comprising office, warehouse / logistics, light industry manufacturing / food processing uses, and ancillary staff welfare facilities, innovation and testing rooms, storage and plant rooms.