New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
Development comprising 4 no. two storey, three bedroom semi-detached houses, 8 parking spaces and associated site works at site at Corbally Close off Blessington Road Dublin 24.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Two storey extension to rear of 9 Ferneood Avenue Springfield Tallaght Dublin 24
Single storey family flat side extension and all associated site works.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
Provision of 527.2 sqm of photovoltaic solar panels on the roof of the existing building.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Single storey family/utility room extension to front, side and rear; porch extension to front and associated site works to existing dwelling.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
Installation of 2 x 3 meter high extract flues from proposed laboratories; construction of a covered boat storage compound within a secured parking area formed with a new 3 metre high security fence with access gates to the rear (north-west) side of the site, internal alteration within the existing building and all associated site works.
Provision of a roof dormer to the rear of aspect of the roof.
Two storey 44sq.m extension to the rear accommodating a ground floor kitchen extension and new first floor bedroom with roof to be pitched; wall and roof finishes to match existing dwelling.
Extension to the side at first floor level only comprising a staircase from the rear first floor bedroom to attic level; the enclosure to the stairs to be 1m wide external with off-white T&G effect cedral cladding finish.
The development seeking retention consists of the construction of a ground floor extension to the rear of the dwelling.
Roof dormer to the rear aspect of the roof and retention of the 'Velux' rooflight to the front aspect of the roof.
Erection of a three storey with front dormer, three bedroom detached dwelling in the side garden of existing dwelling with one pedestrian entrance and one vehicular entrance; creation of a new boundary wall between existing house and new dwelling to be known as No. 2A.
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
6 two storey, 3 bedroom semi-detached houses and all associated site works on a 0.19 hectare site bound by Silken Park to the north, an existing office development to the south, undeveloped residential zoned lands to the east and Kingswood Road to the west.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Attic conversion for storage incorporating a dormer window to the front, a dormer window to the rear, and a new gable window to the side.
Attic conversion and dormer roof window on rear slope of roof at attic level.
Retention permission, of the dormer to the rear aspect of the roof, a velux rooflight to the front aspect of the roof, and planning permission for an extension to the front of the dwelling, comprising a porch, and a bay window, with standing seam zinc roof and wall finishes to match existing.
Roof dormer to the rear of aspect of the roof and the retention of the widened vehicular access.
Construction of kitchen extension to rear.
Attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic as non-habitable storage space with roof windows to front all with associated ancillary works.
The development will consist of a single storey extension to side and rear of existing dwelling (overall floor area 54.3m.sq.) incorporating a new common entrance hallway & toilet (10.6.m.sq.) located at the front of the proposed extension leading to a new 'family flat' (43.7m.sq.) located at the rear of the proposed extension and associated site works.
Construction of three 3 storey office buildings, with a total floor area of approx. 16,732sq.m. The proposed development also provides for plant rooms at roof level, all associated site development works, landscaping, café (57sq.m), bicycle parking, car parking at surface level, basement level & a two level podium car park in the north-east corner of the site incorporating shower & changing facilities (152sq.m), ESB substations & service plant, and bin storage, all on a site area of 3.74ha. The effect of the proposed development will be a modification to part of an extant permission under Reg.Ref. SD06A/0737 & SD06A/0737/EP. The proposed development also provides for 2 vehicular access points off Kingswood Road ( Old Naas Road) and 2 vehicular access points of Kingswood Avenue.
Retention of non-habitable attic with dormer to rear and widened vehicle access to front.
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
Detached two storey house with new vehicular entrance to side of 54 Fernwood Avenue as per previously granted application SD16A/155
Single storey and 2 storey extension to front of existing dwelling.
For development comprising of an Attic conversion including a dormer roof and window to rear of house for the purpose of storage. The addition of a window to first floor to the rear elevation. Addition of two windows on the side elevation, one at first floor level and the other at attic level. Internal alterations to first floor layout to allow for the addition of staircase serving attic level, relocation of bathroom and addition of an ensuite. Storeroom relocated from the first floor to the attic level.
Retain the amalgamation of both units for single occupancy and external alterations comprising of removal of external timber panel doors and replacement with PVC double glazed doors, removal of an external window and replacement of same with a double leaf door, installation of external signage and installation of external security shutters to windows and doors.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Detached two storey, four bedroom dwelling in side garden with attic conversion with dormer roof to rear; new vehicular entrance & partial dishing of kerb.
Construction of single storey garden room consisting of home office and gym and all associated site works
Single storey extension to the front of the existing two storey terraced dwelling with a tiled roof and external finishes to match existing; internal alterations and associated site works.
Proposed attic roof space conversion to attic bedroom with dormer window to front part of roof and 2 rooflights to rear part of roof with all associated internal and external alterations to dwelling house.
Construction of single storey extension to side of existing dwelling comprising 2no. bedrooms, office, playroom, living room, bathroom, and associated site works.
Conversion of Attic Space comprising of modification of existing roof structure, new gable window new access stairs, 2no roof windows to the front and flat roof dormer to the rear.
Planning Permission for the erection of a fully serviced detached dwelling house. All with associated and ancillary site works
Retention of conversion of a portion of an existing industrial unit for exclusive residential use for associated rewinds staff as residential accommodation over two floors consisting of 7 en-suite bedrooms; communal recreational area; communal kitchen and dining area; Permission for landscaped open space; bin and bicycle store and all associated site works.