The construction of Building 'A', a single storey 6.6metre high 1,060 sq.m motor vehicle service and sales facility building; Building 'B' a single 6.6 metre high 895 sq.m. motor vehicle service and sales facility building; Annexe building to the west of Building 'A & B', a single storey 605 sq.m. ancillary valeting and wash building; Building 'C' a single storey 55 sq.m. ancillary building providing an ESB substation, bin storage and security office; associated site-works including on-grade car parking/display spaces, attached and freestanding signage, flagpoles, proposed new vehicular site entrance of Holywell Dale extension, associated boundary treatments, landscaping and drainage. Add Info received 21st August 2020. Add Info deemed Significant 26th August 2020. Revised Public Notices received 1st September 2020. Clarification of Add Info received 12th November 2020.
Amendment to previously permitted development Fingal County Council Reg. Ref F20A/0023 (An Bord Pleanala ABP-309158-21) on a site area of 1.4 hectares (increased from 0.91 hectares in permitted development to accommodate additional buildings). The proposed development will consist of construction of additional Building 'D', a single storey 6.85 metre high, 1.220 sq.m motor vehicle service and sales facility; Construction of additional Building 'E', a single storey 5.1 metre high, 160 sq.m wash and valet building; Provision of additional (47 no.) parking spaces, hard and soft landscaping, drainage and boundary treatments, attached and free standing signage; relocation of permitted Building 'C' (a single storey 55 sq.m ancillary building providing ESB substation, bin storage and security) and main vehicle and pedestrian site entrance, all on the south boundary. These changes result in revisions to permitted parking and driveway layouts, permitted hard and soft landscaping and permitted drainage. (construction of permitted Building 'A' and Building 'B' has now commenced on site), at their existing site.
Permission for the installation of 2700 Solar panels over the roof of 2 no. retail buildings and all associated site works and services. AI received 26/01/22
Permission for proposed new ground floor only extension to the side and part of the front of the existing house and all ancillary works.
For permission for development on this site located on lands at Kettles Lane, Glebe, Cloghran, Co. Dublin. The site is located north of Kettles Lane and immediately east of Metropoint Business Park. The proposed development will consist of the construction of: (1) a multi-storey (up to 5 storeys) car park of 362 no. spaces ( with valet service) and ancillary single storey staff facilities block; (2) a 3 storey block of industrial units (3 no. ). Provision of new vehicular entrance from Kettles Lane to the south and closure of existing access (from private lane) to the east of the site. Provision of on-site wastewater treatment system including septic tanks and percolation areas. All assoicated site development, services provision, landscaping and boundary treatment works.
APO Valet Parking Dublin Limited intend to apply for PERMISSION for development on this site located on lands at Kettles Lane, Glebe, Cloghran, Co. Dublin. The site is located north of Kettles Lane and immediately east of Metropoint Business Park. The proposed development will consist of: • The construction of a Light Industrial/Warehousing development comprising of 9 no. units ranging in size from c.174sqm to c.343sqm with a total gross floor area of c.2,915 sq.m. • Each unit includes ancillary office/admin/kitchenette at first floor level. • Provision of 26 no. car parking spaces and 36 no. cycle parking spaces. • Provision of on-site wastewater treatment system including septic tanks and percolation areas. • Provision of new vehicular entrance from Kettles Lane to the south and closure of existing access (from private lane) to the east of the site. • All associated site development, services provision, landscaping and boundary treatment works.
The development will consist of the construction of a two-bedroom single storey Parish Priest accommodation of 132 sq.m. as an extension to the southwest of the existing church building. The proposed Parish Priest Accommodation is linked directly to the existing church and previously granted Parish centre via a covered walkway. The Parish Centre extension was granted under ABP REF: 314040-22, 3 No. parking spaces and all associated landscaping and site works.
Retention planning permission for the existing Portacabin Units A, B & E located along the South West Boundary of the site.
Widen existing double pedestrian access gate onto Forest Park by extending existing gate by 1 No. additional pedestrian gate of 1500mm(w) X 2400mm(h) and provision of 1 No. new double pedestrian access gate onto Forest Dale of 3125mm(w) X 2400mm(h) plus replacement of existing Temporary School Buildings marked B&E with 2 No. similar sized units marked as G&H to include reorientation of Unit D (all previously approved under Planning Ref: F17A/0676), plus retention permission is sought for Unit F. To include all necessary site works. Add Info receiveed 22nd February 2021. Add Info deemed Significant 24th February 2021. Revised Public Notices received 12th March 2021.
The development will consist of a Large-scale Residential development (LRD) of 530no. residential units and creche in 4no. blocks (Blocks A to D) with a total gross floor area (GFA) of 49,210sqm (excluding basement car parking) with associated ancillary accommodation, private balconies, communal amenity spaces and public open spaces as follows: Block A: 1 to 7 storey block comprising 74no. apartments (37no. 1 bed units and 37no. 2 bed units), Block B: 6 to 9 storey block comprising 108no. apartments (44no. 1 bed units and, 55no. 2 bed units and 9no. 3 bed units), Block C: 1 to 9 storey block comprising 138no. apartments (49no. 1 bed units, 61no. 2 bed units and 28no. 3 bed units) and a creche (462.5sq.m) with external play space, Block D: 1 to 9 block storey comprising 210no. apartments (114no. 1 bed units, 82no. 2 bed units and 14no. 3 bed units). A total of 163no. car parking spaces are provided in a combination of surface spaces and at basement level beneath Block D. The development will be accessed from the south via a connection to the existing roundabout on the Holywell Distributor Road and from the north via a fully signalised junction with the R132 including works to the north and south bound carriageways and central median of the R132 to provide for the fully signalised junction with associated turning lanes and a separate pedestrian and cycle crossing on the R132. Permission is also sought for hard and soft landscaping in public realm and public open spaces within the development, cycle and motorcycle parking, bin stores, water supply and foul water connections, surface water infrastructure, connections to public utilities, ESB substations, plant areas, roof mounted photovoltaic (PV) panels, building and directional signage and all associated site and development works. A 10 year permission is sought. The planning application may be inspected online at www.barrysparks-lrd.ie An Environmental Impact Assessment Report (EIAR) and a Natura Impact Assessment (NIS) have been prepared in respect of the proposed development. Additional Information Received: 16/02/2026 Deemed Significant Additional Information: 11th March 2026. Revised Public Notices received 12th March 2026.
The development will consist of the construction of a temporary primary school building, single storey with two classrooms, by way of construction of a prefabricated modular building with associated site works. Retention planning permission is also sought for two existing primary school modular buildings, single storey with two classrooms. Temporary Permission for a period no longer than 5 years is being sought. AI Received 22/05/2025 SAI Rcvd 10/06/2025
ABP-313223-22 The development will consist of the following: (i) demolition of the existing 1-3 storey public house, restaurant, off-licence and associated storage buildings (totalling 1,197sq.m) and removal of associated surface car park; (ii) construction of a residential development of 146 no. apartments (69 no. one-bedroom, 68 no. two-bedroom and 9 no. three-bedroom) in 4 no. blocks (ranging in height from four to sixstoreys over basement level) as follows:-Block A containing 15 no. apartments (3 no. one bedroom, 9 no. two bedroom and 3 no. three-bedroom) and measuring four storeys in height;-Block B containing 41 no. apartments (23 no. one bedroom, 17 no. two bedroom and 1 no. three bedroom) and measuring part-five part-six storeys in height;-Block C containing 54 no. apartments (33 no. one bedroom, 16 no. two bedroom and 5 no. three bedroom) and measuring part-five part-six storeys in height; and,-Block D containing 36 no. apartments (10. no one bedroom and 26 no. two bedroom) and measuring part-four part-five storeys in height. (ii) all apartments will have direct access to an area of private amenity space, in the form of a terrace/balcony, and will have shared access to internal communal amenities including a gym (211sq.m), communal store rooms (158sq.m) and a cinema/playroom (89sq.m), 3,551sq.m of external communal amenity space and 2,041sq.m of public open space; (iii) provision of 109 no. vehicular parking spaces (including 5 no. mobility parking spaces, 5 no. car-share spaces and 11 no. electric charging spaces), 6 no. set-down parking spaces and 332 no. bicycle parking spaces at basement level accessible via new vehicular access from Church Road; (iv) provision of 5 no. commercial units (746sq.m total) located at basement/ground floor level in Blocks A and B; and 1 no. childcare facility (424sq.m) located within the basement level of Block C; (v) removal of existing culverts, installation of new culverts to facilitate pedestrian/vehicular access and diversion of the Glebe Stream on site; and, (vi) all ancillary works including public realm/footpath improvements, landscaping, boundary treatments, internal footpaths, provision of surface level bicycle parking (56 no. spaces), bin storage, foul and surface water drainage, green roofs, ESB substation and all site services, site infrastructure and associated site development works necessary to facilitate the development. A Natura impact statement has been prepared in respect of the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant county development plan and local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
To view details of this Strategic Housing Development please visit www.mainstreetswordsshd.com. ABP-306771-20 (i) Demolition of the existing 1-3 storey public house, restaurant and off-licence and associated storage buildings (totalling 1,197 sq.m. and removal of associated car park; (ii) Construction of a residential development providing a total of 172 no. residential apartments (comprising 67 no. one-bed units, 101 no. two-bed units and 4 no. two-bed units) in 4 no. four-seven storey blocks over basement. Each apartment has associated private open space in the form of a ground floor terrace or balcony and has access to 3 no. communal amenity spaces (totalling 296 sq.m.), including a communal gym (77 sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from Church Road) providing a total of 132 no. parking spaces (including 6 no. mobility impaired user parking space and 5 no. club car parking spaces), and 408 no. bicycle spaces (336 no. resident spaces at basement level and 72 no. visitor spaces at ground floor level in the central courtyard; (iii) 2 no. commercial units (comprising 394 sq.m. and 296 sq.m. and accommodating Class 1,2 and 8 uses as per the Planning & Development Regulations, 2001-2019, as amended); a c235 sq.m. creche and 87sq.m café at ground floor level; (iv) removal of existing culverts, installation of new culverts to facilitate pedestrian and vehicular access and diversion of the Glebe Stream on site; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development. Please note all submissions to be lodged with An Bord Pleanála, 64 Marlborough Street, Dublin 1 and must be accompanied by the prescribed fee of €20.00.
Bounded generally by Malahide Road and Longlands to the north, Pavilions car park and the R132 to the east, Carlton Court to the south and Dublin Road to the west. The proposed development comprises a change of use of ground (c. 282 sqm gfa) and mezzanine (c. 295 sqm gfa) levels within existing retail unit F01A (permission ref F09A/0357) to Leisure-Virtual Reality Gaming Rooms (c. 552 sqm gfa). And all associated site works, including internal unit reconfiguration and insertion of a new shopfront entrance and bridge link to the existing suspended walkway at 1st floor level within the shopping mall.
Bounded generally by Malahide Road and Longlands to the north, Pavilions car park and the R132 to the east, Carlton Court to the south and Dublin Road to the west. The proposed development comprises a change of use of ground (c. 282 sqm gfa) and mezzanine (c. 295 sqm gfa) levels within existing retail unit F01A ( permission ref F09A/0357) to cafe/restaurant (c. 550 sqm gfa) and all associated site works, including internal unit reconfiguration and insertion of a new shopfront entrance and bridge link to the existing suspended walkway at 1st floor level with the shopping mall.
(1) Change of use from current retail unit (as previously approved under Reg. Ref. No's F96A/0702, F98A/1100,F99A/0699, F99A/0829, F00A/0446, F00A/0635, F00A/1058, F00A/1377, F00A/1378, F01A/0637 and F05A/1287) to a Financial Services institution with associated meeting rooms, toilet facilities and canteen with associated drainage. The total GFA of the unit is 150.8sq.m. (2) Carry out all necessary ancillary site works including full height glazing to shop unit facade and tenant signage all at ground floor level.
The development will consist of the change of use from the existing Financial Services Use (Class 2a), as previously approved under Planning Permission Ref. No.: F20A/0481, into Retail Use (Class 1).
Shopfront alterations to comprise of: fitting of new branded signage (after removal of existing signage) onto existing glazing of unit, replacement of existing ATM with new ATM (location retained). 3 No. internally located digitally marketing LED screens, to be viewed externally through the existing glazing. Minor internal alterations to existing front backing hall to consist of new internal SSBM/ATMs within a new room.
Permission for development to construct a single storey porch extension to the front, two storey side extension containing study and kitchen on ground floor and en-suite bedroom on first floor, single storey kitchen-living room rear extension, attic conversion with rear dormer type window and velux and associated site works. AI received 19/04/21
Retention Planning permission is being sought for the retention of a standalone structure divided into 2 units E1 and E2 (with a total floor area 61m2) for commercial storage use located adjacent to main entrance at Metropoint Business Park, Kettles Lane, Cloghran Swords Co. Dublin.
The development will consist of the installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 1,650 m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
For the change of use of existing ground floor garage and previously used childcare facility to a one bed family flat, a single storey kitchen to the rear of existing dwelling and the construction to the side of a new two storey detached dwelling with amendments to existing boundary walls to included for adjustment to existing site access to allow for second access and landscaping, boundary treatments, connection to existing services and all associated works necessary to facilitate the development
Permission is sought for the change of use of existing ground floor garage and previously approved childcare facility to a one bed family flat, a single storey kitchen to the rear of existing dwelling and the construction to the side of a new two storey detached dwelling with amendments to existing boundary walls to include for adjustment to existing site access to allow for second access and landscaping, boundary treatments, connection to existing services and all associated works necessary to facilitate the development.
The proposed development comprises 1 no. V-shape LED digital signage structure (2 no. signs) in lieu of 1 no. existing temporary container advertising sign (to be removed) at the entrance junction to the Swords Pavilions shopping centre off the R132 regional road. The 2 no. billboard signs each measure 3.7m x 6m in area, with the area of proposed LED digital advertising screen amounting to 18sqm (3m x 6m) in each case. The 'Swords Pavilions' logo branding signage is positioned above. The digital billboard screens are mounted on a steel framework which sits in a new concrete slab platform. The height above ground of the steel framework/digital billboard screens is 8.5m overall.
The development will consist of the construction of
The development will consist of:
The development will consist of a single storey side/rear extension to be used as a self-contained family flat and all associated site works.
(a) The demolition of existing garden boiler house/shed and construction of ground floor extension at rear. (b) Alterations at first floor level to provide bedrooms in new enlarged roof space with 2 no. escape windows and dormer at rear (north east elevation. (c) Re-locate existing roof-light at rear (north east elevation). (d) 3 no, additional escape windows to side with obscure glazing (south east elevation). (e) including alterations to existing house and associated site works.
Planning permission is sought by Rubymint Ltd for the retention of a café reduced in size along with associated signage to that previously approved under planning application reference No. - F17A0555, specifically in relation to the change of use from part of the integral off-licence to a café all with associated internal and external alterations including signage to Peacocks Lounge & Bar, Rivervalley, Swords, Co. Dublin.
Retention permission for the subdivision of the restaurant from adjacent dwelling, and minor internal alterations. Additional Information Received 29/01/2026
Continued use on a permanent basis of the existing access and exit roadway off the western carriageway of the R132 regional route, south of the existing Malahide Road roundabout. The existing access road serves internal circulation and car parking areas within Swords Pavilions Shopping Centre. The access road and associated site development and landscape works and lighting exist as previously permitted under register reference nos. F03A/1331, F05A/1201, F06A/1693, F07A/1195, F10A/0392, F15A/0179 and F16A/0440, but is subject to a condition restricting the period of its use.
Proposed development comprises the continued use on a permanent basis of the existing access and exit roadway off the western carriageway of the R132 regional route, south of the existing Malahide Road roundabout. The existing access road serves internal circulation and car parking areas within Swords Pavilions Shopping Centre. The access road and associated site development and landscape works and lighting exist as previously permitted under register reference nos. F03A/1331, F05A/1201, F06A/1693; F07A/1195, F10A/0392, F15A/0179, F16A/0440 and F20A/0180, but is subject to a Condition restricting the period of its use.
Construction of a front canopy extension, two storey side extension, attic conversion with rear dormer window and all associated site works
Permission is sought for the construction of a single storey extension to side existing dwelling.
A flat roof, single storey extension to rear and for Off Licence subsidiary to the main retail use (4.2sqm) of existing Retail Unit at Unit 4.
Permission for the construction of a new attic conversion
Planning Permission for a flat roof, single storey extension to rear of existing commercial unit and new signage to front.
The proposed development comprises a signage zone measuring c.50.51 sq m. containing individual shop name and logo signs (may vary with change of tenants) in stainless steel or aluminium, back lit lettering affixed to existing external terracotta cladding, located at 1st floor level on the eastern elevation of the Pavilions Shopping Centre building.
The proposed development comprises landscape enhancement works at the Malahide Road entrance to the Pavilions Shopping Centre. This includes the creation of new landscaped areas incorporating existing and new trees, planting and fencing, modular seating pods, modular seating and tree/planting units, the removal and relocation of 3no. existing benches, 2no. new smart bicycle pods (4no. bicycle lockers), 1no. new split double sided and covered ‘Transport Hub’ shelter accommodating 18no. bicycle/scooter parking spaces, a bus stop and integrated advertising panels and associated modifications to entrance concourse, kerb treatments and roundabout planting in this area.
Permission for a 2.5m headframe extension to the existing 15 metre high telecommunications structure for the purposes of carrying antennae and communication dishes, along with ancillary lighting finial, (overall proposed height of main structure 17.5 metres) to be shared with multiple operators.
The development comprises a seasonal events area, to remain in situ for a temporary period of 4 years and to be managed by the Swords Pavilions Shopping Centre, which includes, Permission sought for: • 1no. stand-alone single storey marquee structure (c.6.7m high and c.1,090 sqm gross floor area) and associated plant and site works, for use as an Ice Rink over the Christmas period (November to January), and as a Roller Rink or other similar uses categorised under Class 11 of the Planning & Development Regulations 2001 (as amended) during the Easter (March-April), Summer (May-August) and Halloween (September-October) periods. • 1no. associated advertising sign c.2.15 sq m on the existing metal arch entrance adjoining Swords Pavilions Car Park ‘A’ to the west. Retention Permission sought for: • 1no. single storey event building (c.78 sq m gross floor area), to also accommodate a range of seasonal events, including for use as Santa’s Grotto over the Christmas period (November to January), and for other themed events each season, including the Easter Bunny and egg hunt (March to April), Summer events categorised under Class 11 of the Planning & Development Regulations 2001, as amended (May-August) and Halloween haunted house (September-October). • A c.4.8m high metal arch facilitating pedestrian and service entrance from the adjoining Swords Pavilions Car Park ‘A’ to the west for a temporary period of 4 years.
Permission for a new gable wall to the side of the existing house and new dormer roof to the rear off the existing house roof. A new ground floor only extension to the rear of the existing house. A new window also in the existing side elevation and all ancillary works.
Construction of a Scout Den consisting of a single storey portal frame building with ancillary services and associated site works. This application is concurrent with an application on the adjoining site providing access to services. AI received 25/4/2022 AI deemed significant * Revised public notices (SAI) received 05/05/22
NIS The development will consist of a Healthcare Facility of 4,425.8 sqm gross floor area (GFA), across three storeys over a lower ground floor level car park and all ancillary site works on a site of 2.1 ha. At ground floor level, the proposed Healthcare facility accommodates a welcome area with café and community space, a physiotherapy unit with a gym, support spaces, administrative areas, staff and visitor welfare facilities and storage areas. The upper floors of the proposed Healthcare Facility accommodate an urgent care unit and diagnostics imaging services, together with all associated clinical support rooms, administration spaces, storage and welfare spaces. The proposed lower ground floor level contains car parking (77 no. car parking spaces including 2 no. disabled parking spaces), storage areas, services and utilities (including medical gas room; ESB substation; switch room; pump room; fan room; medical and general waste areas; linen storage; generators; a water storage tank; and an external service yard). A total of 100 no. car parking spaces are proposed (23 no. surface level and 77 no. spaces at lower ground floor level). 10 no. motorcycle spaces are proposed as lower ground floor level. A set down area, an ambulance set down area, a facilities management set down area, and 60 no. bicycle spaces (comprising 32 no. long stay covered spaces and 28 no. short stay spaces) are proposed at surface level. Ancillary signage comprises of; 1 no. high-level sign of 18 sqm on the eastern elevation; 1 no. high-level sign of 12 sqm on the southern elevation; 4 no. wayfinding totem signs; and 2 no. finger post signs. The proposed healthcare facility will be accessed from the existing roundabout via a 150-metre extension of the Holywell Distributor Road. It is proposed to connect to existing wastewater service infrastructure at Drynam Road, and to water services at the Holywell Distributor Road via the proposed road extension. These, and all associated site and infrastructural works including surface water drainage, attenuation areas, plant and photovoltaic panels (at roof level), open space, boundary and landscape treatments on a site of 2.1 ha. This application will be accompanied by a Natura Impact Statement (NIS).
The development will consist of a proposed dormer window in the attic to the rear roof slope of the existing terraced house.
Permission is sought for a Development that will consist of a proposed 2 storey extension to the rear of the existing terraced house. A proposed extension to the attic with a new pitched roof that will tie into the existing roof with 4 no. proposed Velux windows in the new roof to the rear and 1 no. proposed Velux windows in the existing roof at the front.
The development will consist of a proposed 2 Storey extension with dormer window in the attic to the rear of the existing terraced house. 1no. proposed velux windows in the existing roof to the front.
For upgrade of the phone kiosk on the public footpath. The development will consist of the replacement of the existing telephone kiosk with a new telephone kiosk, with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a dept of 0.762m and a width 1.096m.
A new standalone, four-storey hotel (3,376.5 square metres), comprising 104 bedrooms and ancillary services, including day café, toilets, reception, foyer, administrative and staff facilities, etc., over a two-level basement car park (1,915 square metres), providing 52 no. car parking spaces, and all associated landscaping, site works and services. Permission is also being sought for demolition of an existing, two storey, pitched roof building within the site, a former builders' providers outlet. The site is bounded to the north by a protected structure, The Old Borough Schoolhouse, a Wetherspoon's Public House, and to the south by a Colortrend Paint outlet. The site is also bounded to the west by the Well Road. The proposed hotel will be built to 'Passive-House' standards of construction and energy conservation. Upon completion, this will be Ireland's first Passive-House certified hotel.
NIS Planning permission sought for a hotel development on lands at 76 Main Street, Swords, Glebe Swords. The site is also bound to the rear by Well Road. The proposed development will consist of the demolition of the existing 2 storey building and boundary walls to the south and west of the site, and removal of all associated sheds and structures within the site, and the construction of 1 no. new 5 storey building over basement level (part 3-storey and part 4-storey over a lower ground floor level) hotel building with balconies/terraces, comprising of: (a 1 no. 66-bedroom hotel at ground to 4th floor levels; (b) a licensed restaurant and back of house facilities at ground floor level with external dining areas; (c) a licensed bar at lower ground floor level and a licensed bar at basement level (2 licensed bars in total); (d) 14 no. car parking spaces, 32 no. bicycle parking spaces and 1 no. motorcycle parking space at basement level with plant, bin and bar stores, and 3 no. surface bicycle parking spaces; set down area on Main Street; (e) a new vehicular access from Well Road; (f) pedestrian access from Main Street and Well Road; (g) signage to the front and rear elevations, all along with hard and soft landscaping, boundary treatment, public lighting, and all associated site works necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and is submitted to the planning authority with the application. AI received 24/06/24 SAI received 27/06/24