• Part change of use at ground floor level from office use to warehouse / logistics use (with a Gross Floor Area (GFA) of 944 sq.m) and light industry- manufacturing / food processing use (GFA of 1,860 sq.m), including ancillary staff welfare facilities, with the remainder of the existing floorspace (GFA of 712 sq.m) unchanged from the existing office use; • Proposed extension to the rear / south elevation of the existing building (with a GFA of 861 sq.m), comprising one level with a height of 7.47m, to provide an additional ancillary store to the proposed light industry- manufacturing / food processing use; • Proposed two storey extension (GFA of 13 sq.m) to the north elevation to provide an additional lift shaft and proposed extensions to the northern and west elevations to provide additional lobby / entrance areas (12 sq.m); • Provision of additional floorspace at first floor level (within the existing building envelope) to provide an additional 1,040 sq.m (GFA) of office floor space, ancillary staff welfare facilities, ancillary innovation and testing rooms, storage and plant rooms, and an additional 163 sq.m (GFA) of a mezzanine storage area; • Associated internal reconfigurations and installation of new internal partition walls, and associated alterations to the elevations including materials and fenestration arrangement, additional loading bays and roller shutter doors; • Provision of associated signage including an internally illuminated sign adjacent to the security entrance gate, a directional sign, internally illuminated signage over the entrance doors to the unit and 2 no. signs over entrance canopies; • Reconfigured car parking to provide 72 no. car parking spaces (a reduction from 134), widening of the internal service road, provision of new pedestrian footpaths from the estate road, internal segregated pedestrian footpaths and crossing, and the provision of a security fence and gate; • The proposal includes dock leveller, landscaping, bicycle store, external store with WC/garden store/bin store, plant compound, PV panels to new rear extension roof and bicycle store roof, surface water drainage, including detention pond and swale, and all associated works. The proposed development results in an overall increase of 2,089 sq.m in the total GFA of the unit from 3,516 sq.m to 5,605 sq.m, comprising office, warehouse / logistics, light industry manufacturing / food processing uses, and ancillary staff welfare facilities, innovation and testing rooms, storage and plant rooms.
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Change of use of the fifth floor level from office to hotel use to provide for 26 hotel suites; Associated modifications to the layout and elevations at fifth floor level and to the stair cores at ground to fifth floor levels to facilitate access and egress; Introduction of lobbies to the stair cores at basement level; Provision of a green roof to the existing building on site; Revisions to the existing car and bicycle parking arrangements at basement level; All associated site development works.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
The development will consist of (a) the removal of the existing fascia signage, (b) the installation of green powder coated aluminium cladding panels overlaid on the existing shopfront, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs to the shopfront, (d) the installation of new internally illuminated fascia signage, (e) the installation of a new internally illuminated projecting sign and (f) all associated site works.
Conversion of detached single storey garage to side of dwelling to family flat with alterations to front and rear elevations
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
The proposed development will consist of: Change of use of part of the ground floor level (492 sqm) from bar/restaurant to gym. Change of use of the basement floor level (618 sqm) from night club to gym. Removal of the mezzanine levels at ground and basement floor levels. Associated modifications to the layout at ground and basement floor levels to accommodate the proposed change of use and All associated site development works.
Full planning permission for construction of new detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden.
Permission for construction of 2 new semi -detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden of number 26 Cois Na hAbhann.
Construction of 2 new semi-detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden.
Removing of existing garden wall and palisade fence along western boundary and for constructing a new 215mm tk. x 2.1m high rendered block perimeter wall complete with piers and concrete capping along south and west boundary to incorporate part adjoining site (area 481.3sq.m.). Permission sought for construction of 2 new semi-detached 3 bedroom houses to side (floor area to be 126.85sq.m per house, with a proposed ridge height of 8.325m above ground level), including 900mm deep bay window to front elevations at ground and first floor levels, single storey flat roof extended ground floor across rear and first floor windows to east and west elevations. Permission also sought for the construction of 2 new 3m wide driveway entrances with 750mm high block wall and 450mm.sq. x 1.2m high brickwork piers across front/n.east boundary, to form vehicle access onto new 6.15m long extended roadway across front of site, complete with dished footpath and kerbing to tie into existing, together with all associated site works.
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
Change of use of a vacant unit to four one bedroomed apartments.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
A community Mural on the wall at 1 the rear of 1a Knockmore Avenue, Tallaght. This community mural is a project funded by the Creative Ireland Mural Grant in collaboration with the Connect 4 project, connect for life and members of the local community. The mural draws its inspiration from the poem authored by Emmet O'Brien in partnership with Sean Farrell and the Connect 4 project. The central theme of both the mural and the poem concerns the positive impact of sport on mental health.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
Retention permission for ground floor front extension with pitched roof over and 1 roof light on front slope of roof at attic level; permission for first floor side extension with pitched roof over and extension of attic room.
Change of use from Licensed Premises to Commercial/Retail units at first floor level and alterations to layout of 2 entrance lobbies of the licensed premises at ground floor to accommodate independent entrance and fire escape from first floor.
Retention of existing garage conversion with raised pitched roof extended to rear over utility room and at front over hall door.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
Change of use from office to medical/dentist use with revisions to front elevation.
Demolition of existing shed in rear garden. Construction of proposed shed with pitched roof in rear garden. Construction of ground floor rear extension with flat roof, door and window in gable wall at ground floor, ground floor internal alterations, first floor internal alteration, conversion of existing attic space and 2 roof lights on rear slope of roof at attic level, first floor side extension with pitched roof over
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
Construction of a detached, three bedroom dwelling at the vacant garden plot to include dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off-street parking space and all associated site works.
Detached 2 bedroom dwelling at the vacant garden plot site including dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off street parking space and all associated site works.
Installation of new railing to front of building including pedestrian gate; installation of new access control system to car park; 2 new standalone illuminated identity signs; revisions to landscaping and associated site development and facilitating works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
Two-storey, 4 bedroom detached dwelling with vehicular access and 2 off-street, parking spaces and all associated site works at side garden plot.
Two bedroom, double storey house.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
The construction of a two storey extension (c.70m.sq.) to the side of the existing two storey dwelling along with the widening of the existing vehicular access including dishing of kerb, alterations to the existing boundary treatments and all other ancillary site development works at 1 Cloonmore Drive. Retention permission is also sought for the existing single storey shed (c.35m.sq.) to the rear of the existing dwelling.
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.