Planning records
Showing 151-200 of 5,089 public recordsThe development consists of the retention of ground floor
Demolition of existing detached garage (floor area 72 m2) and the construction of a single storey extension to the site of existing factory (floor area 482.50 m2).
Alterations to approved plans (Ref. No. F18A/0010). The alterations are the reduced floor area from 335m² to 163m² of a single storey extension to rear of existing industrial unit.
Attic development to include removal of existing hipped section of roof, construction of a raised gable end, with new flat roof type dormer extension & window to rear, 1 Nr. rooflight to rear, installation of new window to side and associated site works.
The development consists of the construction of additional floor space to Mezzanine floor area, including all associated site and ancillary works at this address in accordance with the drawings as submitted.
Single storey extension to front, side & rear of existing dwellinghouse. Attic conversion to include dormer window to rear (west facing) roofslope. New windows to landing areas in side gable (south facing) along with associated internal alterations and associated siteworks.
Retention Permission for internal modifications/alterations to the unit including a new internal staircase and the construction of a mezzanine level for storage and display purposes associated with the permitted use of the unit.
Permission for the demolition of existing house, revised vehicular entrance location and construction of an apartment development comprising 28 no. residential apartments arranged in 2 no. buildings ranging 4-5 storeys in height (total 2,742 sqm Gross Floor Area), all at a site of approximately 0.2773 hectares. The proposed development consists of: (a) 1 no. three-bedroom apartment (b) 20 no. two-bedroom apartments (c) 6 no. one bedroom apartments Block A contains 13 apartments; 1 no. 3 bedroom apartments, 9 no. two bedroom apartments and 3 no. one bedroom apartments. Block B contains 15 apartments; 11 no. two bedroom apartments and 4 no. one bedroom apartments. 28 vehicular parking spaces together with 44 no. bicycle parking spaces are proposed. Private and common open spaces, hard and soft landscaping, roads and pedestrian walkways, services (incl. SUDS), site lighting, solar panel arrays, and all other ancillary and associated site development works above and below ground level.
Retention is sought for as-constructed external stairs & balconies to front of duplex apartments, these were required in order to comply with Part B of the Building Regulations & revised car parking & associated siteworks
Planning permission is sought for alterations to approved plans (F23A/0114). Alterations are for 3 No. external stairs & balconies to front of duplex apartments (these are required in order to comply with Part B of the Building Regulations), minor internal & elevational changes, revised car parking & associated siteworks
The proposed development will consist of the following:
Retention of widening of the front entrance
The development will consist of: (a) amendments to condition no.3 in Planning Grant Reference F17A/0298 to include; (b) the increase in child numbers to be accommodated at any one time in the Childcare Facility from a maximum of 46 children to a maximum of 54 children. Additional Information received 10/09/25
The development will consist of (a) the demolition of a single storey rear extension (b) the demolition of a single storey front extension (c) the construction of a single storey extension to the rear of the existing house (d) the construction of a two storey extension to the front of the existing house (e) the works will include minor alterations to the existing house (f) associated site works including hard and soft landscaping.
Change of use from Doctor's Surgery to a health and fitness centre.
Proposed ground floor rear extension (8m2), first floor rear extension (4m2) which will include a pitched roof over the extended area on the first floor, and a lean-to roof with glazing and tiles on the ground floor level, and all associated site works.
The development will consist of (a) the demolition of a single storey garage; (b) the construction of a single-storey extension to the rear of the existing house and; (c) the construction of a part two-storey, part single-storey extension to the side of the existing house; (d) the works will include minor internal alterations to the existing house; (e) all associated site works including hard and soft landscaping and; (f) minor modifications to the existing foul & surface water drainage. Additional Information Received 14/07/2025
The development will consist of: (a) the demolition of a single storey garage; (b) the construction of a single-storey extension to the rear of the existing house and; (c) the construction of a part two-storey, part single-storey extension to the side of the existing house; (d) the works will include minor internal alterations to the existing house; (e) all associated site works including hard and soft landscaping and; (f) minor modifications to the existing foul & surface water drainage.
The proposed development will consist of the installation of a pedestrian access gate to the western boundary of the house.
Construction of a new single storey 4 bedroom detached dwelling (122 sq.m) to the rear of the site, shall include 1 new roof light, with new vehicular entrance exiting onto Hamlet Lane, development shall include boundary treatments and associated site works. AI received 30/03/21 AI deemed significant 31/03/21 Revised notices received 08/04/21 CAI received 11/05/21 CAI deemed significant SCAI received 02/06/21
The proposed development will consist of: change the use of domestic garage to use as a self-contained apartment together with all associated siteworks, including forming connections to mains water and sewage services.
Retention will consist of a flat roof
The development will consist of a new two storey attached dwelling to the side of existing dwelling site with shared vehicular entrance. Two storey extension to existing dwelling with demolition of existing single storey entrance and outbuilding sheds with all associated site works. AI received 18/12/24
The development will consist of a new two storey attached dwelling to side of existing dwelling site with shared vehicular entrance. Two storey extension to existing dwelling with demolition of existing single storey extension & outbuilding shed with all associated site works.
(a) Retention of single-storey porch extension to front of dwellinghouse. (b) Retention of single-storey extension to the rear of dwellinghouse. (c) Construction of a new shed/outbuilding in the rear garden along with all associated siteworks.
Planning Permission for hip to gable to side to create non habitable attic storage space with roof windows to front and rear.
The proposed development consists of advance infrastructure works on a 1.57 ha site at Castlelands, Balbriggan to facilitate intended future community facilities and residential development on lands zoned for residential use, to the east of the subject site, which will be the subject of separate planning applications. These infrastructural works include: 1. Construction of the first section of the proposed Castlelands link street from the existing Castlelands roundabout to the west for c. 420m to its junction with a north south neighbourhood street providing access to the FCC masterplan proposed school and swimming pool and to the local park and to the future Neighbourhood 5 in the proposed future residential development. This street to include dedicated footpaths and cycle lanes. 2. From its junction with the Castlelands Link Street, construction c. 130m of a north-south neighbourhood street providing access to the FCC masterplan proposed swimming pool car park, and to the proposed local park and Neighbourhood 5 in the proposed future residential development. 3. Foul, Surface Water and Water Supply Services to facilitate future community facilities and residential development within the Castlelands Masterplan Area. 4. Planting & landscaping of open space areas immediately adjoining proposed streets. Provision of Public Lighting along both Link street and neighbourhood street. 5. All associated and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of the proposed development and accompanies this application.
The development will consist of: A two-storey rear extension (39.62m²) and associated internal modifications - Garage demolition - Alternations to the existing rear access - All associated site works. Additional Information received 20/11/2025
Planning permission for a) new front porch extension and alterations to existing front windows, b) new two-storey extension to the side, c) new part single- storey/part two-storey extension to the rear of existing dwelling-house along with associated internal and external alterations and associated site works.
Permission for attic conversion. The attic will be used as storage and we would like to remove chimney and install two Velux type rooflight at attic level to the front roof and all associated site works.
The development will consist of side extension to existing dwelling including alterations to front elevation of existing house, conversion of attic to storage space, internal alterations.
A. Single storey granny flat to side and rear. B. All associated works. Add Info received 2nd September 2020.
Single storey side and rear extension incorporating a new utility room, dining area and living area, as well as a new pedestrian side entrance gate on the east facing boundary wall and all associated site works
The proposed development will consist
Permission for proposed single storey sunroom, (15.95 sq.m. gross) to the side of dwelling.
Conversion of existing attic space to habitable space to include for bedroom and en-suite together with all associated site works.
Planning Permission for attic conversion with dormer to rear to accommodate stairs to allow access to attic conversion as non- habitable storage space with roof window to front all with associated ancillary works.
Permission for Insulation and Workshop Unit (576 sqm) to the South of the Production Facility, for roofing the existing Lower Gantry Crane (3,713 sqm) to the East of the Production Facility, for a raised roof section over the Batching Plant (300 sqm) within the Production Facility, for retention of a Laboratory Unit (56 sqm) to the East of the lower gantry crane including associated site development works, and retention of modifications to the Main Entrance Gate. AI received 13/02/23 SAI received 27/02/23
Retention Planning Permission for as constructed non habitable attic conversion with gable style dormer to hip at side and Permission to alter gable style dormer to side to create hipped dormer to side and ancillaries.
Permission for 320kWp (1875m2) of roof mounted Solar PV Panels and all associatd works on manufacturing facility.
The development will consist of: a planning permission for a change of use from Retail to a Community Centre including all associated site works. Additional Information Received 27/01/2026
The development will consist of an attic conversion to habitable space to include one bedroom with ensuite internal alterations, one roof window to the front roof elevation, 3 no. roof windows to the rear roof elevation and all associated site works.
Revision to previously approved planning permission registration reference F18A/0098 to revise dwelling design with modifications to roof form and height, fenestration, footprint and rooflights.
Revisions to previously approved planning permission registration reference F18A/0098 to retain the existing driveway entrance to serve the existing dwelling only, revision to the extent of boundary walls to side and rear for the existing dwelling, location of the proposed dwelling to rear and associated onsite parking and private open space,
Retention for a temporary period of three years of the single storey log cabin / garden room (10m²) for use as an amenity space by the applicant, located adjacent to the eastern boundary within the rear garden of the existing dwelling.
Demolition of existing single storey porch to the front & a single storey extension to the rear of existing cottage and for minor alterations to the windows on front elevation of existing cottage and for the construction of a single storey extension to the side and rear of existing cottage with provision for 6 no. roof windows to the rear extension and for all associated site works.
Family flat incorporating (1) garage conversion at side of existing dwelling with raised roof and front bay window facing due east and single storey extension to the rear, linked directly to the northern side of the existing dwelling, accessed from house via proposed internal corridor/door and connecting lobby in side passage in addition to rooflights serving proposed bathroom along with associated site works.
Retention permission is sought to retain railings and gates which exceed 1.2m in height to the front of the property, and fencing which exceeds 2m in height to the side of the property, together with all associated site works.
The Development will consist of: The construction of a 4 storey building with part 3 storey building with roof garden. A) Two no. Commercial units at ground floor level, with bin and bike stores at ground floor level. B) 12 no. Apartments (5 no. two bed units, 6 no. one bed units, 1 no. 3 bed unit) connection to public foul, water and surface water sewer. C) Associated landscaping works including dedicated area for public art space, boundary walls and all associated site works.
The Development will consist