Permission for 1) Removal of existing conservatory & the construction of a single storey flat roof extension to western side of house. 2) The construction of two new bay windows to front elevation of house. 3) Removal of existing chimneys and fireplaces to facilitate proposed internal alterations at first floor level to improve layout at "Ballydarton House", Forrest Road, Swords, Co. Dublin.
Permission is sought for single storey extension to side and rear of existing house, new side access gate to side boundary wall to rear of site, attic conversion, raising of gable end to change roof profile with dormer projecting window to rear and all associated site works.
Permission for Conversion of existing attic space comprising of modification of existing roof structure, side dormer with A-style roof c/w window, new access stairs and flat roof dormer to the rear.
Planning permission is sought for the following: The construction of a new single storey, 2 Bedroom detached house to the rear of 2A & 2B Boroimhe Oaks, Plus All associated Site Works including new vehicle entrance.
Permission for the construction of a new two storey, 2 bedroom semi-detached house to replace existing family flat to the side of 2A Boroimhe Oaks, plus all associated site works including new vehicle entrance. AI received 17/6/2022 SAI received 17/6/2022
Permission for conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to rear. Add Omfo received 21st May 2020.
Permission for retention of: A. Single storey lean too enclosed seating area to side of existing bar/lounge premises, B. All associated site works on site.
An attic conversion with dormer roof to the rear plus building up of existing gable wall to meet newly extended ridge line and a single storey rear extension and all associated site works.
The development will consist of amendments to the previously approved planning application F23A/0462. A. Conversion of attic space to a non-habitable storage space/home office. B. Addition of dormer style window to the rear roof and window to south gable wall. C. Addition of 2 No. Velux style roof lights to the front roof pitch.
The development will consist of A) The construction of a two storey, 3 bedroom detached dwelling house to the side of the existing two storey semi-detached dwelling house, B) Modifications to the existing driveway to create two separate driveways including piers with all associated site works. AI Rcvd 09/10/2023
We, Golden Port Homes Limited, intend to apply for permission for a Large-scale Residential Development on lands at Forest Road, Swords, Co. Dublin. The proposed development will consist of a total of 109 no. residential units (42 no. duplex units; 41 no. apartments; 26 no. houses) as follows: (i) 42 no. duplex units within 3-storey buildings comprising 21 No. 1 bed units at ground level and 21 No. 3 bed units over first and second floor levels with balconies/terraces, private and communal open space; (ii) 41 no. apartments within 2 blocks. Block A will be a 4 storey building with 14 no. apartments (5 no. 1 bed units and 9 no. 2 bed units) with balconies/terraces to the north, south and west elevations, and bin, bicycle parking and plant at ground floor level and pv panels at roof level; Block B will be a 5 storey building with 27 no. apartments (13 no. 1 bed and 14 no. 2 bed units) with balconies/terraces to the east and west elevations and bin, bicycle parking and plant at ground floor level and pv panels at roof level; (iii) 26 no. houses (comprising 5 no. 2 bed, 2 storey terrace houses; 6 no. 3 bed, 2 storey terrace houses; 4 No. 3 bed, 2 storey semi-detached houses; and 11 no. 4 bed, 3 storey houses); (iv) 96 no. Surface level car parking spaces and 4 no. surface level motorcycle parking spaces as well as bike parking stores and spaces; and bin stores; (v) 1 no. ESB substation; (vi) Landscaping, including the provision of new public open spaces with play areas and a MUGA; footpaths and cycle paths, new vehicular access/egress from Forest Road; public lighting; boundary treatment and all associated site, drainage and development works necessary to facilitate the proposed development.
The development will consist of the construction of a dormer window to the rear and two number Velux roof lights to the front.
Intend to apply for Planning Permission
Planning permission is sought for the construction of a dormer window to the rear of dwelling and two number Velux style windows to the front.
The subdivision of existing retail unit for use as retail with new shopfront & signage onto east elevation of shopping centre with associated site works. Add Info received 13th November 2019. Revised Public Notices received 13th November 2019. Clarification of Add Info received 6th December 2019. Clarification of Add Info deemed Significant 10th December 2019. Revised Public Notices received 12th December 2019.
Permission to construct a single-storey side extension to the right-hand side of the existing dwelling, incorporating the existing rear garage into the new extension, together with a structural opening to the right-side gable wall to link the extension with the existing living area, and re-roofing of the existing rear extension.
Permission sought for change
(a) Change of use from office space to veterinary clinic with kennels, surgery room, and a small retail shop, (b) New signage to include 1no. acrylic lettering and logo sign above the front door, (c) Internal alterations and associated works at, Unit 5, The Manor Shopping Centre, Swords Manor Avenue, Swords, Co. Dublin.
Planning Permission for loft conversion including removal of hipped end of roof and the construction of a jerkinhead roof, with window at loft level in new side elevation also dormer structure with window to rear roof profile and Velux windows to rear and front roof profiles.
Alterations to previously granted application reference No. F18B/0220 alterations consisting of two storey extension to front side and rear allowing for additional bedrooms and enlargement of front bedroom and additional storage space in attic and all associated site works.
The works to include the provision of suitable size roof lights and secondary means of escape window to north and south roof slopes for attic conversion already granted planning permission for habitable use (ref F23A/0137). AI received 31/10/24
The works to include the conversion of existing attic space
The development contains the following mix of apartments: 104 No. 1 bedroom apartments, 111 No. 2 bedroom apartments (including 12 No. 2 bed 3 person apartments and 99 No. 2 bed 4 person apartments), 4 No. 3 bedroom apartments, together with a creche (GFA of 170 sqm) set out in 5 No. blocks in line with zoning objective RS – Residential as set out in the Fingal Development Plan 2017 – 2023. The breakdown of each block will contain the following apartments: • Block A1 comprises 15 No. apartments in a block of 3 storeys; • Block A2 comprises 17 No. apartments in a block of 3-4 storeys; • Block B1 comprises 40 No. apartments in a block of 3-5 storeys; • Block B2 comprises 74 No. apartments in a block of 5-8 storeys; • Block B3 comprises 73 No. apartments in a block of 5-9 storeys. The proposed development will also provide for public open space of 1,510 sqm, communal amenity space of 2,020 sqm and a creche (c.170 sqm) with associated play space. Provision of private open space in the form of balconies or terraces is provided to all individual apartments to all elevations. The proposed development will provide 470 no. bicycle parking spaces of which, 348 no. are long term spaces provided in secure bicycle stores, 116 no. are short term space for visitors - mainly distributed at surface level and 6 no. spaces are provided for creche staff. A total of 144 no. car parking spaces are provided, located at surface and undercroft level. This car parking provision includes 14 no Electric Vehicle Chargers, 2 no. car parking spaces to serve the creche staff, 12 visitor spaces (with 3 of those spaces allocated for car sharing) and 2 no. universally accessible spaces. In addition, 6 no. motorcycle spaces are also to be provided. Vehicular, pedestrian and cyclist access routes are provided from a new entrance to the west off Boroimhe Oaks, north of Boroimhe Elms. Pedestrian and cyclist access is also provided along the eastern and the southern boundaries. Improvements to the public footpath are to be provided to the west at the entrance along Boroimhe Oaks and to the south at the boundary to the L2300 (Boroimhe Road). The development will also provide for all associated ancillary site development infrastructure including site clearance / demolition, demolition and partial demolition of boundary walls, the construction of foundations, telecommunications infrastructure, ESB substations, switch room, water tank rooms, storage room, meter room, sprinkler tank room, comms room, bin storage, bicycle stores, green roofs, photovoltaic panels, hard and soft landscaping, two playgrounds, boundary railings and wall, attenuation area and all associated works and infrastructure to facilitate the development including connection to foul and water supply and surface run off. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. ABP 314253
The development will consist of building (i) a tiled roof one storey bay window and porch at the front of the house (ii) a hip roof dormer with obscured glazing in the roof-hip (iii) a dormer window in the roof at the back of the dwelling (iv) converting the attic space for non-habitable use with stair access from the bedroom landing and (v) all associated internal work, site and drainage works.
Conversion of existing attic space
A Protected Structure: Installation of a lift in the main house with alterations at ground and first floor level to accomodate this, provision of a conservation roof light to the upper landing, demolition of previous extensions to the gate lodge to be replaced with a new 30sqm single storey extension, relocation of existing sash window in the gate lodge to take account of the new extension and conversion of the existing bathroom into a second bedroom, alteration of existing rear window in the gate lodge to become an external door and miscellaneous landscaping works around the gate lodge including the provision of a parking space. Add Info received 10th December 2020.
Permission for (i) demolishing the substandard single-storey kitchen annex at the rear of the house (ii) building a part single-storey and part two-storey extension at the side and rear of the dwelling, (iii) widening the existing vehicular entrance at the front with new raised front garden wall and gate piers, and (iv) all associated internal, site and drainage works.
Planning permission is sought for 3 no. skylights on front (West) roof elevation
The construction of a dormer window to the rear.
Construction of a single storey flat roof extension to the rear of the property. Removal of existing hipped roof to existing single storey return of adjoining family flat and replaced with flat roof. Along with consequential alterations internally.
Single storey extension to front of existing house.
(1) Replacing the existing hip roof with a 'half-hip' type.
Planning Permission for conversion of attic space with a new dormer roof to the rear of the existing house roof and all ancillary works.
Permission for Retention of Steel Temporary Container and Canopy. Container measures 2300mm x 2500mm x 3500mm. For the use as a Carwash/Valet Business. AI Rcvd 09/01/24 CAI Rcvd 14/3/24
Retention Planning Permission for Steel Temporary Container and Canopy. Container measures 2300mm x 2500mm x 3500mm. For the use as a Carwash/Valet Business and new SUDS solution to incorporate rain water collection and permeable paving.
Retention & continuation of use in side extension for existing sessional use as a Montessori pre-school.
Permission for (1) Hip roof dormer with obscure glazing in existing roof-hip on the side elevation. (2) Roof lights in the roof to the front of the dwelling. (3) Converting the attic space for non-habitable use with stair access from the first floor landing. (4) All associated works.
Planning permission is sought for attic conversion, raising of gable end to change roof profile with dormer projecting window to rear and all associated site works
Planning permission for the construction of
Retention will consist of changes to planning application F18B/0111. The retention changes are the removal of a door to the rear of the new works and moving the window to the centre of the rear new works and replacing a window to the side of the new works with a door and all ancillary works.
The development will consist of: (i) change of use of 2 no. existing two storey veterinary buildings to commercial office use and repurposing of existing single storey stables to refuse/bicycle storage building; (ii) construction of new veterinary campus with new vehicular/pedestrian links to existing access infrastructure off Pinnockhill and comprising 1 no. two-storey (with rooflights and solar panels) veterinary clinic, 1 no. two-storey (with solar panels) equine facility, an animal recovery paddock, single-storey kennels/plant building, staff (5 no. spaces) and customer (16 no. spaces) parking areas, loading bays and emergency vehicle area; and, (iii) all ancillary works, including SuDS drainage, hardstanding areas, landscaping and boundary works, necessary to facilitate the development. Additional Information Received 24/04/2026
Planning permission is sought for attic conversion, raising of gable end to change roof profile with dormer projecting window to rear for study/ play use and all associated site works.
Permission sought to demolish existing porch to front, to provide new windows to existing front and side walls, remove existing front door, remove existing roof and replace existing roof structure and roof tiles to match existing, to demolish existing chimneys, to demolish all existing partition walls, and build new partition walls on new concrete floor, existing floor to be removed throughout, and provide new 200mm concrete floors with 100 mm insulation and damp proof membrane, on sand blinding on 150mm hardcore. Existing external walls not being demolished to be treated for dampness by D.P.C. injection system and removal of mould by specialist company. Demolition of existing single storey flat roof extension to rear and side of existing, New single storey extension to rear and side of existing cottage, complete with triple glazing to new windows and doors. New flat roof to support twelve no. solar panels concealed behind new parapet walls finished with new pressed metal capping to new parapet. New geotextile lined surface water soakaway to BRE 365 Design. Together with new detached, tiled, pitched roof garage to rear of site. AI received 7/9/2022 CAI received 6/10/2022
Side and rear two storey extension, front entrance porch, reconfiguration of the roof for attic conversion with roof lights to the rear, new pedestrian access to the rear garden off Ormond Avenue, and all associated site works.
PLANNING PERMISSION TO CHANGE FROM SESSIONAL TO PART-TIME CHILDCARE WITH NEW OPENING HOURS OF MONDAY TO FRIDAY FROM 9am TO 2pm AND FOR RETENTION PERMISSION FOR CHANGES TO THE ORIGINAL MONTESSORI (PLANNING REFERENCE F98A/0873), WHICH INCLUDES; • THE 2007 CHANGE OF USE OF THE FRONT MONTESSORI ROOM BACK TO ITS ORIGINAL USE AS A LIVING ROOM • THE 2007 CHANGE OF USE OF THE EXISTING SIDE EXTENSION WHICH WAS CONSTRUCTED UNDER PLANNING REF: F97B/0434 INTO A MONTESSORI ROOM (MONTESSORI ROOM 1) RETENTION PERMISSION IS ALSO SOUGHT FOR THE FOLLOWING UNAUTHORISED EXTENSIONS OF THE ORIGINAL MONTESSORI; • THE 2007 CONSTRUCTION OF A FLAT ROOF EXTENSION TO THE SIDE OF MONTESSORI ROOM 2 • THE 2021 CONSTRUCTION OF THE COVERED OUTDOOR PLAY AREA TO THE REAR OF MONTESSORI ROOM 2 • AND ALL ASSOCIATED SITE WORKS AI received 21/11/24
Construction of 9 no. two storey houses consisting of 8 no. three bedroom units and 1 no. four bedroom unit with ancillary private and public open spaces, boundary treatments and all associated site works to facilitate the development. The lands are located adjacent to the Boroimhe Hazel housing development (granted under F04A/0888 as amended) and borders the recently approved Fosterstown Place development (planning ref: F18A/0306) to the East and North. Vehicular access to the new housing will be from the existing public Boroimhe Hazel access road. AI received 10/03/23
Construction of 9 no. two storey houses consisting of 8 no. three bedroom units and 1 no. four bedroom unit with ancillary private and public open spaces, boundary treatments and all associated site works to facilitate the development. AI rcvd - 12/09/2023
Development will consist of a proposed new Dutch hip gable wall & new window to the side of the existing house and a new dormer roof to the rear of the existing house roof and all ancillary works.
Permission for development at this (c. 0.54 ha). The subject site overlaps and will supersede part of planning permission Reg. Ref.: F18A/0306 adjoining to the west resulting in the omission of 8 no. apartments as permitted. The development will consist of: 1. Demolition of existing residential dwelling Hollytree House (c. 449.2 sqm). 2. Construction of 85 no. residential apartments (35 no. 1-bed, 37 no. 2-bed units and 13 no. 3 bed units) within a 5 - 8 no. storey (over undercroft) building, with all apartments served by private terrace or balcony. 3. Access shall be via internal road branching south from Boroimhe Link Road L2300 serving permitted development Reg. Ref.: F18A/0306 adjoining to the west. 4. Landscaped public open space in the northern part of the site fronting the Boroimhe Link Road L2300 (on lands zoned Open Space) and additional public open space across the site and communal open space including children's play area. 5. Provision of 50 no. car parking spaces. 49 no at basement level (including 2 no. disabled access spaces) - all accessed via vehicular ramp and 1 no disabled access space at ground level. 6. provision of 293 no. bicycle parking spaces: 218 no. at basement level accessed via cycle ramp and 75 no. bicycle parking spaces at ground level. 7. ESB substation, switch room, bin storage and bicycle storage at ground level at the southern perimeter, with green roof and PV panels at roof level, as well as plant at basement level and all associated works and infrastructure to facilitate the development. AI received 12/05/23 SAI received 19/05/23 CAI received 26/7/2023
Alteration/extension of the existing two storey semi-detached house. comprising demolition of the existing front porch, rear shed, rear conservatory and free-standing side garage/home office, and construction of a new single storey rear extension, a new two storey side extension including extension of the existing hipped roof profile, with 5 no. new velux rooflights to front and rear roof slopes, and a new front porch extension, plus modifications to the existing fenestration and associated site development.