RETENTION & PERMISSION: - RETENTION of existing 73.3 sq.m Admin Office pod, located at the East of the Centre, opposite the vehicular entrance and accessed independently from the Centre. - PERMISSION for the erection of a 58.4 sq.m extension of the existing Playroom, within the internal courtyard of the Centre, on the East courtyard elevation. - PERMISSION for the erection of a 31.5 sq.m pod, to the Northeast of the Centre, to serve as a den for the older children, and all associated site works.
Permission for (1) the construction of a single storey flat roof extension to rear of house and internal structural alterations to facilitate new open plan layout, (2) alterations to existing garage conversion to include a new tiled canopy and window to front with flat roof to side.
RETENTION Planning for retention of single storey portacabin extension to single storey portacabin-type structure for use as a senior centre and associated site works.
RETENTION: Of a single storey portacabin-type structure for use as a senior centre,and associated site works.
RETENTION for development consisting of the change of use of an existing 2 storey flat roofed building (floor area 1,590sqm) from former light industrial/office use to family hub providing short term emergency accommodation to homeless families, new internal layout to provide accommodation units (28 family units/84 bed spaces), stairs and lift, kitchen, dining, recreation and laundry facilities and full separation from adjoining building (Bargaintown) at ground floor level. The development also includes retention of alterations to elevations and fenestration, a front entrance doorway, a single storey, flat roofed structure (60sqm) used for storage, plant and waste storage, a children's play area (118 sqm), cycle parking (10 spaces), car parking (12 spaces including one accessible) all forward of the building, new front boundary railing over brick faced plinth wall (overall height 2.1m), closure of previous vehicular access onto Greencastle Road, formation of new vehicular access (4,993m) onto Greencastle Road, removal of roof top plant room and construction of new roof top plant room (37.5sqm) adjoining existing stairs/lift shaft and site development works and services all on a site of 0.18ha at the Salvation Army Family Hub (former Shamrock Appeal factory), Greencastle Road/Greencastle Parade, Coolock, Dublin 17, D17 XD29.
PERMISSION & RETENTION: The development will consist of: retention permission existing for detached single storey studio home and office asconstructed located to the rear of the existing house in the rear garden, with permission to replace the existing mono-pitch roof and raise the existing roof height by 700mm (and subsequently amending the height of existing windows) to meet building regulations and all associated site works.
Permission for development consisting of the construction of a single storey extension with pitched roof to the rear of the existing house, plus all associated site development works.
The development will consist of the demolition of the existing front entrance porch and the construction of a new porch to the front of the existing dwelling. The development is to include internal alterations, upgrades, and all ancillary site works and drainage.
The development will consist of installation of external security roller shutters above windows and exit door to west elevation of existing building.
RETENTION: The retention of the existing scrolling internally illuminated double sided ‘Metropole’ advertising display case mounted on an offset leg.
PERMISSION: The development will consist of a side single storey extension to an existing commercial development, relocation of existing access door with security shutter, new solar panels and all associated site development works.
The Development will consist of the installation of roof mounted solar photovoltaic panels to include all ancillary works and services.
Installation of RTO Equipment 15m (L) x 5.5m (W) x 11m (H), to the north side of the B1 Building, including a ground level pipe rack and associated works at Clonshaugh Business and Technology Park, Dublin 17, D17 E400. The site activity is subject of an Industrial Emissions Licence No. P0306-03.
RETENTION & PERMISSION: Retention planning permission for the following: (i) Two additional windows on the west elevation, one at ground floor level and one at first floor level, and (ii) Minor alterations to the existing internal layout previously approved, and B. Planning permission for an increase in the number of preschool childcare spaces from thirty six to fifty, involving both full time care and sessional care, all at The Kids Den, Unit 6, Malahide Road Industrial Estate, Coolock, Dublin 17.
Planning Permission for development will consist of: the use of the property as a warehouse with the inclusion of ancillary trade counters (for the sale of building related to products principally to trade). Proposed external changes comprise: new roof cladding; new metal cladding on south and east elevations; a new delivery entrance to be created in the east elevation along with the entrance to the trade counters; 2 no. concrete ramps to serve the new delivery entrance and existing entrance; new fire escape door on the south elevation; 8 car parking spaces and all ancillary works. General reconfiguarion of the internal ground and mezzanine floor areas to create trade counters, ancillary office space and warehouse are including the partial removal of part of the mezzanine area (reducing from 183 sq ms to 120 sq ms). Infill internal opening to the north of the unit thus reducing the ground floor area of the unit from 746 sq ms to 601 sq ms. Existing total gross floor is 929 sq ms, reducing to a proposed 721 sq ms.
Extension to the side of existing manufacturing facility to consist of single storey warehouse building (Block E) 627 sq.m gross area & all associated site works.
RETENTION: Permission is sought for alteration/extension of the existing semi-detached two-storey house. Retention planning permission is sought for the rear attic dormer with cladding and fenestration upgraded. Planning permission is sought for the change of use of the garage to habitable accommodation including alterations to the garage roof profile and fenestration to the front and rear a new rooflight, plus associated works.
Planning Permission to install 140kW (750m2) of roof mounted solar PV panels and all associated works on our warehouse at Clonshaugh Industrial Estate, Coolock, Dublin 17.
Single storey pitched roof extension with velux roof lights and associated works to front /side of 54 Kilmore Avenue Dublin 5 D05Y194 and for use of full Garage Conversion extension as home office for medical nurse.
Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation, Belcamp Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours.
PERMISSION:The development will consist of the installation of 1,009.3 sqm roof-mounted solar photovoltaic panels to include all ancillary works and services.
Permission for the construction of a new two storey dwelling to side garden of existing dwelling; new rooflight to side of existing house; new vehicular entrance to existing house (off Beechlawn Green) and all associated site works.
Permission to install up to 170kWp (c.800m2) of Roof Mounted Solar PV Panels and all associated works at our building.
Development will consist of a ground floor only extension to the front of the existing house connecting in with existing porch. A new first floor extension over the existing garage and extending the existing roof across. A ground floor & partial first floor extension to the rear of the existing house and a new dormer roof to the rear of the existing house roof and all ancillary works.
The development will consist of the removal of an existing 45m telecommunications support structure and the installation of a new 36m telecommunications support structure, together with antennas, dishes, equipment cabinets, fencing and all associated site development works. The development will provide high speed wireless broadband and data services.
Planning Permission for the installation of 3,036 sq.m of Solar PV Panels to the roofs of existing buildings, located within a solar safeguarding zone (SSZ) along with all associated ancillary works and services at our premises at No.4 Newtown Park, Malahide Road Industrial Park, Coolock, Dublin 17, D17 CP26.
Planning permission for the construction of an Electrical Substation including switch room along with all associated site works at No. 4 Newtown Park, Malahide Road Industrial Park, Coolock, Dublin 17, D17 CP26
Planning permission for modifications to previously permitted planning reference 2055/21 relating to the expansion of our existing food manufacturing facility. The modifications propose to achieve similar expansion objectives as the previously permitted development by better utilising existing buildings on site, thereby reducing the requirement to demolish a number of the existing buildings. These buildings will be refurbished and extended to provide a similar overall floorspace to the previously permitted proposals. The modifications will also include changes to the internal layouts, external elevations, modifications to the roof design with inclusion of roof mounted plant area, revised position of 2no. previously permitted flour silos to replace the 1no. existing flour silo along with all associated site works.
Planning permission for expansion of our existing food manufacturing facility which will include the demolition of 3no existing buildings, removal of an existing communications mast (with relocation forming part of a separate planning application by others), the construction of a new part single storey, part two storey extension to our facility, including plant and electrical rooms, 2 no flour silos, revisions to 2no existing vehicular entrances at the front of the facility (east) to form one larger vehicular access, repositioning of existing vehcular access at the rear (west) of the facility and all associated site works.
PERMISSION & RETENTION: The development seeking retention permission consists of the provision of a vehicular entrance 2.6m wide to the front of the property; the development seeking permission will consist of widening that vehicular entrance to 3.75m wide and all associated site works.
RETENTION: Permission for retention for the construction of a first floor internal extension (floor area = 21.1 sq.m) for use as an office space.
The development will consist of the erection of a single storey modular office building to be used as a car rental hub along with the construction of an adjoining canopy to be used as a car wash/valeting bay. Site development works to consist of a new vehicular entrance off Greencastle Road, car parking, Ev charging spaces, landscaping, bicycle provision, lighting, signage, boundary treatments, connection to all existing services and all ancillary works.
The construction of a new canopy structure to the front of the dwelling
PROTECTED STRUCTURE: PERMISSION: Permission to erect 9,724.00 m2m2 or 1.77MV of photovoltaic panels on the roof of the buildings in our factory, in the complex called Cadbury's chocolate factory, with all associates site works at Mondelez Europe Services GMBH, Old Malahide Road, Malahide Road, Dublin 5, D05 TOH4. That currently operates under an Industrial Emissions (IE) License (P0809-01). Exist a protecting structure on the owner's land (Ref. No: 4861. Volume 4 of the 2022-2028 Dublin City Plan) and the National Inventory of Architectural Heritage (NIAH) consider the Cadbury's chocolate factory to be a 'Regionally' important complex of architectural, social, and technical interest, (NIAH Ref: 50130221), however both records are not affecting the area of the solar panel's installation.
RETENTION:Retention development will consist of changes to planning reference: 3255/23. Flat roof on works changed to have tiles/pitched roof instead. 2No windows in side/front elevation facing onto Kilmore close road. The existing a-frame roof to be removed and replaced with new lean-to roof at existing front elevation to house and all ancillary works.
PERMISSION: Development will consist of a proposed ground floor only extension to the side of the existing house and all ancillary works.
The development will consist of: (i) The demolition of an existing 1950's, 4 no. storey concrete framed vacant office building located adjacent to the southern boundary of the subject site, including associated outbuildings, walls and foothpaths and; (ii) amendments to the existing car parking area located to the north of the office building proposed for demolition, to provide for a modified car parking area and a HGV/truck parking and marshalling area. More specifically, the development will include the following: (a) a modified car parking area for staff parking including 55 no. parking spaces (including 2 no. accessible parking spaces and 6 no. electric vehicle charging spaces); and b) a parking area for HGV's and trucks comprising 15 no. parking bays, together with space for loading and unloading of vehicles and a 'Pit' Type Weigh Bridge flush with the paved surface. The proposed development will also include all ancillary works necessary to facilitate the proposed development including hard and soft landscaping, a new bicycle shelter, foothpaths, EV car charging stations and the removal of existing gates and the provision new electric sliding gates to the HGV/truck parking area.
Planning permission for the development will consist of the demolition of an existing 68m x 16m x 18m high 4 no. storey concrete framed unoccupied office building and associated outbuildings, walls & footpaths and the construction of a replacement 62m x 20m staff car parking area and associated works.
The development will consist of the change of use from retail use to retail with ancillary off licence use.
The proposal consists of: (1) The construction of a new single storey shop unit (53 sqm) to the front of the existing building which will incorporate the change of use of 22 sqm of the existing building as part of the proposed shop unit. (2) New shop front signage fixed to the new building, which will be back lit. (3) The construction of a two storey extension (123 sqm) to the rear of the existing building to house a meat smoking room and additional storage space. (4) New pedestrian access to Greencastle Parade and alterations/improvements to the car parking layout on site. (5) Plus all associated site and enabling works. All of the above will be ancillary to the existing Meat Processing Facility as approved in Planning Reg. Ref: 3878/99.
The construction of a single storey porch extension to the front, single storey extension to the rear, to increase the height of the existing single storey extension at the side, construction of a dormer window to the rear elevation roof plane and two dormer windows and one roof light in the front elevation roof plane to facilitate the conversion of existing attic space to habitable/bedroom use.
To construct porch attached to front of house and sitting room extension attached to front and side of house with pitched and hipped roof finish.
Works to include modification & extension of approx. 8sqm to single storey main entrance lobby and relocation of existing façade mounted company signage.
Mayne Stability Limited intends to apply for permission for a period of 10 years development of a Synchronous Compensator Development (Grid Stabilisation Facility) on the site of c. 1.65 ha at lands south of Belcamp 220kV Substation, Belcamp, Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Fingal County Council: a) A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; c) A 220kV underground cable to the existing adjoining Eirgrid substation boundary; d) Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A concurrent planning application is being made to Dublin City Council which relates to a portion of lands to the south of the site of c. 0.94 ha which provides for a new access entrance from the R139 and a clear span bridge crossing over the River Mayne, internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. AI received 3/8/2022
RETENTION PERMISSION: for changes to already approved single storey building in rear garden for use as home gymnasium and playroom (Planning Ref:4191/23). Changes include increased floor area from 39.37 SqM to 46 SqM, also increased roof ridge height from 3.93M to 4.4M, as well as Retention of existing steel garden shed for use as domestic storage.
1. The construction of a single storey extension to front, rear & gable end of house including conversion of existing garage. 2. The construction of single storey building in rear garden for use as home gymnasium and playroom. 3. The widening of existing front garden vehicular entrance.
The development consists of construction of flat roof single storey garden shed to the rear of existing dwelling, relocation of existing rear 3m wide vehicular access off St Brendan's Terrace and all associated works to facilitate development.
Permission sought for: (i)The change of use from Existing Ground Floor Office Space to a New Childcare Facility including an ASD unit, (ii) minor alterations to the internal layouts and minor alterations to the fenestration of the existing building, (iii) new signage mounted on the existing building and (iv) the creation of a secure outdoor play area, bicycle parking, bin store, plus all associated site works.
The development will consist of the installation of new external steel racking for storage of builder's materials, to the existing materials yard to the side. The racking is to be mounted on the existing concrete hard standing.
Planning Permission for development consisting of a proposed new ground floor only extension to the front/side of the existing house and all ancillary works.