PROTECTED STRUCTURE: PERMISSION & RETENTION: Retention of modifications and amendments of works commenced under Planning Permission Ref 3397/15 (now expired) which included the reconfiguration and alterations to walls and partitions to facilitate the proposed cafe/bar use at ground floor level, stairs access from basement level (not implemented) including raised level of part of existing floor to facilitate drainage pipes, demolition of part of internal wall to provide for access to neighbouring fire escape corridor at 29 Fleet Street (not implemented) and insertion of void within existing floor to basement level below (not implemented.) The works previously approved at basement level of existing licensed premises comprised of alterations to existing internal doors, corridor and stairs to provide access from the existing basement level to the ground floor level of 29 and 30 Fleet Street (partially implemented). Retention of works required on foot of the granted Fire Safety Certificate (FSC 3256/21) & Regularisation Fire Safety Certificate (3004742) which is pending and includes the blocking up of the existing escape route that previously discharged through the adjoining Hostel and retention of a new protected escape stair and protected escape route from the basement to the ground level at 30 Fleet St in lieu of previously approved fire escape route. Retention of other completed works including kitchen, stores and dumb waiter, alterations to bar counter and new toilet facilities at basement level. Removal of contemporary accommodation stair connecting the basement and ground floor bar area. Alterations to ground floor betting office (vacant) include new disabled WC and bar counter. Retention of external works consisting of reinstatement of the doorway entrance to 30 Fleet Street. Planning permission is also requested for works previously approved but not completed under planning permission (Ref 3397/15) which include the refurbishment of the building facade and change of use of ground floor betting office (vacant) to licensed cafe/bar and proposed dumb waiter (not previously approved), refurbishment and maintenance of the 1st, 2nd and 3rd floor facade of 29 and 30 Fleet Street and lighting and all ancillary site and development works.
PROTECTED STRUCTURE (RPS No. 282): permission to previously granted planning DCC Ref. no. 3182/19 & 3188/12 (An Bord Pleanala Ref. PL 29S.241330) at this site. The permission is sought for the change of operational time to 7.30am - 2.30 am on any day as noted in the planning condition no. 2 (DCC Ref. No. 3182/19 & 3188/12) which states that the proposed development shall not be operated between midnight and 7.30 hours on any day.
PROTECTED STRUCTURE: The development will consist of proposed six non-permanent signs to railings of Custom House, which is a Protected Structure.
PROTECTED STRUCTURE: Permission is sought for the change of use of part first floor from existing office use to apartment use, consisting of 1 no. studio and 1 no. 1 bedroom apartments, and all associated site works.
PROTECTED STRUCTURE: PERMISSION AND RETENTION: For development at this site (0.0185 hectares) within the existing 4-storey over basement properties comprising the former Irish Yeast Company at 6 College St. (RPS Ref. 2010), The Times Hostel (upper floors only) at 31 Fleet St. (RPS Ref. 2925), and minor changes to the rears of 7 College St. (RPS Ref. 2011) and 30 Fleet St. (RPS Ref. 2924) at 1st floor only, Dublin 2. (PROTECTED STRUCTURES). The proposal provides for the conservation and restoration of historic fabric and the refurbishment and restoration of active use to No. 6 College St. providing for change of the historic retail use to use as a café/bar and reception area at ground floor level, and the provision of 3 no. one-bedroom apartments at the upper floors. The proposal also includes minor alterations within the upper floor interiors only of 31 Fleet St. in order to provide universally accessible bathrooms. It will further include for the removal of the existing two-storey extension to the rear of 6 College St. and the 1st floor extension to the rear of 31 Fleet St. New works include a replacement extension to the rear of 6 College Street with a glazed atrium containing a lift and enhanced circulation spaces and interconnection which provide for universal access and compliant fire safety and escape to the upper floors of both buildings. In addition to the above, the proposal will also provide for the following works at ground, 1st, 2nd and 3rd floor levels: • Ground Floor Level: (i) Conservation works to existing historic fabric, reinstatement of original cabinetry, panelling, fire upgrading of door and partitions to lobby on west side. (ii) Change of use at ground-floor level of No. 6 College St. from retail to use as a café/bar and reception area and use of the existing stairwell as access to proposed new apartments at 1st, 2nd & 3rd floor levels. (iii) Retention permission is sought for minor alterations including the removal of 2 no. modern partitions. • First, Second and Third Floor Levels: (i) Provision of new opes in the rear façade of 6 College St. and the side façade of 31 Fleet St. (ii) Reconfiguration of non-original partition walls to existing en-suite in 30 Fleet St. at 1st floor level only. (iii) Demolition of non-original timber-clad structure to the rear of 7 College St. and reinstatement of original, multi-pane sash window to rear façade of 7 College St. at 1st floor level only. (iv) Provision of 1 no. apartment at each of the 1st, 2nd & 3rd floor levels including extension to rear of 6 College St. (v) Glazed atrium to rear of No. 6 College St. containing a lift and enhanced circulation spaces and interconnection which provide for universal access and compliant fire safety and escape to the upper floors of both 6 College Street and 31 Fleet St. (vi) Reconfiguration of existing modern partitions and en-suites to provide universally accessible bathrooms to 2nd and 3rd floor levels of 31 Fleet Street. (vii) Demolition of modern extension at 1st floor level of 31 Fleet St. to reveal and reinstate the original multi-pane sash window to the rear façade and removal of cementitious render and repair and repointing of brickwork to rear façade. (viii) Structural repair works to the basement of 6 College St. in order to save the ground floor structure and coverings. Permission is also sought for works to stabilise the debonding brickwork on the front façade, cleaning and repair of brickwork, repointing of the brickwork, reinstatement of quoins and stencilled historic paintwork, repairs to carved timber shopfront, refurbishment and reinstatement of multi-pane, single-glazed sash windows to the rear façade of 31 Fleet St and reinstatement of the original front entrance door to the east side all to front of 6 College Street.
PROTECTED STRUCTURE: PERMISSION & RETENTION: For development at this site (0.0185 hectares) within the existing 4-storey over basement properties comprising the formed Irish Yeast Company at 6 College St. (RPS Ref. 2010), The Times Hostel (upper floors only) at 31 Fleet St. (RPS Ref. 2925), and minor changes to the rears of 7 College St. (RPS Ref. 2011) and 30 Fleet St. (RPS Ref. 2924) at 1st floor only, Dublin 2. (PROTECTED STRUCTURES). The proposal provides for the conservation and restoration of historic fabric and the refurbishment and restoration of active use to No. 6 College St. providing for change of the historic retail use to use as a café/bar and reception area at ground floor level and the provision of 3 no. one-bedroom apartments at the upper floors. The proposal also includes minor alterations within the upper floor interiors only of 31 Fleet St. in order to provide universally accessible bathrooms. It will further include for the removal of the existing two-storey extension to the rear of 6 College St. and the 1st floor extension to the rear of 31 Fleet St. New works include a replacement extension to the rear of 6 College Street with a glazed atrium containing a lift and enhanced circulation spaces and interconnection which provide for universal access and compliant fire safety and escape to the upper floors of both buildings. In addition to the above, the proposal will also provide for the following works at ground, 1st, 2nd and 3rd floor levels: Ground Floor Level: (i) Conservation works to existing historic fabric, reinstatement of original cabinetry, panelling, fire upgrading of door and partitions to lobby on west side. (ii) Change of use at ground-floor level of No. 6 College St. from retail to use as a café/bar and reception area and use of the existing stairwell as access to proposed new apartments at 1st, 2nd & 3rd floor levels. (iii) Retention permission is sought for minor alterations including the removal of 2 no. modern partitions. First, Second and Third Floor Levels: (i) Provision of new opes in the rear façade of 6 College St. and the side façade of 31 Fleet St. (ii) Reconfiguration of non-original partition walls to existing en-suite in 30 Fleet St. at 1st floor level only. (iii) Demolition of non-original timber-clad structure to the rear of 7 College St. and reinstatement of original, multi-pane sash window to rear façade of 7 College St. at 1st floor level only. (iv) Provision of 1 no. apartment at each of the 1st, 2nd & 3rd floor levels including extension to rear of 6 College St. (v) Glazed atrium to rear of No. 6 College St. containing a lift and enhanced circulation spaces and interconnection which provide for universal access and compliant fire safety and escape to the upper floors of both 6 College Street and 31 Fleet St. (vi) Reconfiguration of existing modern partitions and en-suites to provide universally accessible bathrooms to 2nd and 3rd floor levels of 31 Fleet Street. (vii) Demolition of modern extension at 1st floor level of 31 Fleet St. to reveal and reinstate the original multi-pane sash window to the rear façade and removal of cementitious render and repair and repointing of brickwork to rear façade. (viii) Structural repair works to the basement of 6 College St. in order to save the ground floor structure and coverings. Permission is also sought for works to stabilise the debonding brickwork on the front façade, cleaning and repair of brickwork, repointing of the brickwork, reinstatement of quoins and stencilled historic paintwork, repairs to carved timber shopfront, refurbishment and reinstatement of multi-pane, single-glazed sash windows to the rear façade of 31 Fleet St and reinstatement of the original front entrance door to the east side all to front of 6 College Street.
PROTECTED STRUCTURE: Change of use from general retail to café with takeaway service, with opening hours from 8:00 AM to 8:00 PM, Monday to Sunday
The development consists of the demolition of all existing structures (which includes the existing apartment building known as The Brokerage, vacant ground floor retail unit and existing bar unit and basement -1, site clearance, site excavation works and associated boundary hoarding.
PROTECTED STRUCTURE: Permission for a period of 7 years at a site, 'Dublin Central - Site 3' (c. 0.37 Ha), at Nos. 36 - 41 Henry Street, Nos. 1 - 9 Moore Street, Nos. 3 - 13 Henry Place (formerly known as Nos. 2 - 13 Henry Place), Clarke's Court and Mulligan's Lane, Dublin 1. Also, the site includes the rear of Nos. 50 - 51 and Nos. 52 - 54 Upper O'Connell Street, No. 13 Moore Lane, No. 14 Moore Lane (otherwise known as Nos. 1 - 3 O'Rahilly Parade and Nos. 14 - 15 Moore Lane or Nos. 1 - 8 O'Rahilly Parade and Nos. 14 - 15 Moore Lane), Dublin 1. The site is otherwise bounded by Henry Street to the south, Moore Street to the west and Henry Place to the north and east. The proposed development comprises a mixed-use scheme (c. 15,842.4 sq. m gross floor area) accommodated in 2no. blocks, ranging in height from 1 - 9 storeys over 2no. new independent single level basements. A proposed new passageway separates the 2no. blocks (Block 3A & Block 3B), connecting Henry Street and Henry Place. The proposed blocks comprise: - Block 3A (Eastern Block) (c. 7,806.3 sq. m gfa), fronting Henry Street, Henry Place and the new passageway, with modulating building height at 4, 5, 7 and 9 storeys, over single storey basement. Block 3A accommodates: - A hotel (c. 7,175.3 sq. m gfa) with 150no. bedrooms from 1st to 7th floor and ancillary facilities at ground floor and basement, including: hotel reception addressing Henry Place; 1no. licensed hotel restaurant / cafe with takeaway / collection facility (c. 138.1 sq. m) at ground floor on the new passageway and Henry Place; and, 1no. licensed hotel restaurant / cafe with takeaway / collection facility (c. 194.2 sq. m) and 2no. associated external terraces (c. 38.8 sq. m in total) at 8th floor of the proposed hotel; 1no. retail unit for use as a 'shop' or 'licensed restaurant / café unit with takeaway / collection facility' (Unit 1 - c. 127.2 sq. m) at ground floor on the new Passageway; 1no. retail unit for use as a 'shop' (Unit 2 - c. 326.5 sq. m) at basement, ground floor and first floor level on the new passageway and Henry Street; Block 3B (Western Block) (c. 8,036.1 sq. m gfa), fronting Henry Street, Moore Street, Henry Place and the new passageway, with modulating building height at 1, 3, 5, 6 and 7 storeys, with top storey set back, over single storey basement. Block 3B accommodates: - 79no. 'Build-to-Rent' apartment units (c. 6,451.5 sq. m gfa), including 14no. 1-bed studios, 56no. 1-bed apartments and 9no. 2-bed apartments from 1st to 5th floor, with access from residents' lobby at ground floor on Henry Place; Internal residents' amenity areas at ground and 6th floors (c. 325 sq. m in total) and external terrace areas (c. 517.7 sq. m in total) at 6th floor; Private residential balconies and 'wintergardens' from 1st to 5th floor inclusive on elevations facing into the open courtyard areas and facing east to the new passageway. Balconies / terraces at 4th floor on west elevation to Moore Street and at 5th floor on south elevation to Henry Street; 5no. retail units, each for use as a 'shop', including: Unit 6 (c. 245.2 sq. m) at ground and 1st floor on new passageway and Henry Street, Unit 7 (c. 382.4 sq. m) at ground and 1st floor on Henry Street and Moore Street, and Unit 8 (c. 182.2 sq. m), Unit 9 (c. 57.2 sq. m) and Unit 10 (c. 52.5 sq. m) at ground floor on Moore Street; 4no. retail units, each for use as 'shop' or 'licensed restaurant / café units with takeaway / collection facility', including: Unit 3 (c. 148.9 sq. m), Unit 4 (c. 53.5 sq. m) and Unit 5 (c. 55.1 sq. m) at ground floor on the new passageway, and Unit 11 (c. 160 sq. m) at basement and ground floor on Moore Street and Henry Place; 1no. 2-storey building for cultural / gallery use with restaurant / café (c. 123.4 sq. m) replacing No. 10 Henry Place. All associated and ancillary site development, conservation, demolition, landscaping, site infrastructure and temporary works, including: - Conservation, repair, refurbishment and adaptive reuse of part of the existing building fabric, including: - Retention of Nos. 36 - 37 Henry Street, with modifications, a vertical extension and new shopfronts; Retention of No. 39 - 40 Henry Street (upper floor façade); Retention of Nos. 8 - 9 Moore Street, with internal and external modifications and new shopfronts; Retention of Nos. 11 - 13 Henry Place, with internal and external modifications and new shopfronts; Works to include repair and upgrade works (where required) of existing masonry, external and internal joinery, plasterwork and features of significance; New Passageway linking Henry Street and Henry Place; Demolition of all other existing buildings and structures on site (c. 6,701 sq. m), including No. 38 Henry Street to form new passageway linking Henry Street to Henry Place; Demolition of boundary wall onto Moore Lane at the rear of properties at Nos. 50 - 51 and Nos. 52 - 54 (a protected structure) Upper O'Connell Street; 160no. bicycle parking spaces within secure bicycle facility (24no. within Block 3A, 126no. within Block 3B and 10no. in the public realm); 1no. external residential courtyard at ground floor in Block 3B; Plant at basement and roof level; 2no. ESB sub-stations; Building signage zones and retractable canopies; Removal of existing boundary fence at junction of O'Rahilly Parade / Moore Lane within that part of the site including No. 13 Moore Lane, No. 14 Moore Lane (otherwise known as Nos. 1 - 3 O'Rahilly Parade and Nos. 14 - 15 Moore Lane or Nos. 1 - 8 O'Rahilly Parade and Nos. 14 - 15 Moore Lane). The application site is within the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application. The planning application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours and a submission or observation in relation to the application may be made to the authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the authority of the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
PROTECTED STRUCTURE The development will consist of upgrade works to replace existing exterior signage with new signage with updated colours and logo.
The development will consist of change of use of existing ground floor hearing centre to an internet cafe with new associated signage to existing shop front.
PROTECTED STRUCTURE: Planning permission will comprise of (i) replacement of windows to front with new double glazed timber sashes and rear facade with aluclad windows, (ii) demolition of later addition extension to second and third floor return to rear of No.40 (15m sq) and construction of new flat roof extension at second floor return (9 m sq), (iii) demolition of later addition extension at second and third floor levels to rear of No. 41 (25m sq), new flat roof to lower section of building, (iv) internal alterations to include new en suite facilities within bedrooms with associated services and new kitchen, (v) upgrade of internal walls and floors and new lobbies for fire safety requirements, (vi) works to facades to include, repairs as necessary and localised repointing to existing brick work and new render reveals. New lime based render finish to areas of existing render on rear elevation and lime based paint to areas of existing paint on rear elevation, vii) provision of new drainage works below basement floor and externally in courtyards.
Permission is sought for the change of use from a commercial to retail and restaurant use. Works to include linking the three premises, internal alterations, new frontage with all associated site works.
PROTECTED STRUCTURE: Planning permission to permanently retain the pre-fabricated learning resource room, (15m.sq), on the south side of the site, previously granted three year temporary permission, under Dublin City Council decision no. P5586 (7th November 2019) - a Protected Structure (RPS 2290).
PROTECTED STRUCTURE: permission for the change of use from Office to Hospitality to the Mezzanine Level a Protected Structure (Area 165.8m2) of the Westin Hotel 5 College Green (previous grant of permission 3914/17) to become the Presidential Suite for the hotel. The building is a protected structure (RPS:2009). The works will include soft refurbishments to change existing office space into a lounge, bedroom, cloak room and ensuite with an upgrade to mechanical and electrical and all associated works.
Fitzwilliam Real Estate Developments Ltd intends to apply for permission for development at this site of c.0.555 hectares at: No. 97 Middle Abbey Street, Dublin 1; 16/17 Prince's Street North, Dublin 1; the area previously known as Nos. 19/25 Prince's Street North, Dublin 1; the 'Arnotts' Car Park', with an address of Nos. 98-101 Middle Abbey Street, Dublin 1 and the associated roof of the car park over Arnott's Store at Nos. 102-107 Middle Abbey Street, Dublin 1; Nos. 2-3, 4 and 4A Proby's Lane, Dublin 1; and Nos. 7/7A and 8 Liffey Street Upper, Dublin 1. The proposed development will consist of a hotel development consisting of the: demolition of the existing 3 No. storey Eircom structure to the rear of No. 97 Middle Abbey Street (c. 2,201 sq m), rooftop stairwell enclosures (c.128 sq m) and of the existing rear extensions No. 97 Middle Abbey Street (second and third floor levels) (c. 11sq m) decommissioning and demolition of the top three open-air levels of the Arnotts' car park (resulting in the removal of 145 no. car parking spaces, with 225 no. car parking spaces remaining); development of a 9 no. storey (with setbacks) over basement element fronting William's Lane, a 3 no. storey (with setbacks) element above Arnotts' car park and 2 no. storey (with setback) element above Arnotts store, to provide hotal (254 no. bedrooms and related ancillary hotel facilities and restaurant uses (including reception area, lobby, public bar, restaurant, cold room, storage areas, administration and staff facilities, plant, refuse area and bicycle parking area) with a total new build gross floor of c. 10,689 sq m (including c. 632 sq m basement, and ESB substation with switchrooms); and the change of use (from basement to fourth floor levels to hotel), refurbishment (internal and external alterations) and extension (to link with the new build hotel in the rear) of No. 97 Middle Abbey Street (total floor area of c. 404 sq m (including c. 124 sq m basement); the continued use of the Arnotts' car park stairs (ground, first, second and their floor levels) and Arnotts' store stairs (ground, first, second, third, fourth and fifth floor levels) (c. 205 sq m and c.142 sq m respectively); associated lighting, pedestrian access via no. 97 Middle Abbey Street and William's Lane; sustainable urban drainage systems (including green roofs and attenuation tanks; associated site servicing (foul and surface water drainage and water supply); associated hard and soft landscaping and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply). The total gross floor area of the overall development is c. 11,440 sq m. The development will also consist of: the erection of no. side-lit signs, 1 no. on the south elevation (entrance to no. 97 Middle Abbey Street) and 1 no. on the east elevation (William's Lane) measuring c.0 49 sq m each.
Fitzwilliam Real Estate Developments Ltd intends to apply for permission for development at this site of c.0.568 hectares at: No. 97 Middle Abbey Street, Dublin 1; 16/17 Prince's Street North, Dublin 1; the area previously known as Nos. 19/25 Prince's Street North, Dublin 1; the 'Arnotts' Car Park', with an address of Nos. 98-101 Middle Abbey Street, Dublin 1 and the associated roof of the car park over Arnotts Store at Nos. 102-107 Middle Abbey Street, Dublin 1; Nos. 2-3, 4 and 4A Proby's Lane, Dublin 1; and Nos. 7/7A and 8 Liffey Street Upper, Dublin 1. The proposed development will consist of the development of a Build-To-Rent residential development consisting of the: demolition of the existing 3 No. storey Eircom structure to the rear of No. 97 Middle Abbey Street (c. 2,201 sq m); decommissioning and demolition of the top three open-air levels of the Arnotts' Car Park (resulting in the removal of 145 No. car parking spaces, with 225 No. car parking spaces remaining); development of a 12 No. storey over basement element fronting William's Lane, a 5 No. storey element above Arnotts' Car Park, and 2 No. storey element above Arnotts Store, to provide 155 No. apartments (56 No. studio units; 85 No. 1-bed units; and 14 No. 2-bed units). The development also provides for hard and soft landscaping including the provision of: a landscaped public plaza (including bicycle parking) along the William's Lane frontage; a landscaped communal courtyard as well as a communal terrace and private terraces on the southern elevation all at Sixth Floor Level; a landscaped communal courtyard as well as private terraces at the southern elevation, communal terraces at the southern elevation and part of the western elevation, and outdoor exercise area and basketball court at the northern elevation all at Seventh Floor Level; and terraces on the eastern and western elevations of the Eleventh Floor Level. Private open space in the form of terraces are also provided on the east-facing, west-facing and south-facing elevations of the two courtyards at Sixth and Seventh Floor Levels. Juliette balconies are also proposed on the eastern, western, southern elevations as well as the east-facing, west-facing and south-facing elevations of the two courtyards. Pedestrian access to this part of the development will be provided via William's Lane. Additional proposed works include the provision of: communal residential amenities (c. 459 sq m) (including co-working space, toilets, multimedia room, gyms and exercise studios, dog-washing room, private dining, storage hire, multi-purpose space and communal lounge); residential support facilities (c. 471 sqm) (including entrance foyer and concierge, post room, bicycle storage and bicycle repair station, maintenance rooms / management stores, general storage and bin store); communal amenity open spaces; a substation and a switchroom (c. 30 sq m); water tank and sprinkler rooms (c. 117 sq m); Sustainable Urban Drainage systems (including green roofs and attenuation tanks (c. 121 sq m); and plant at Basement Level. The total gross floor area of this part of the development is c. 12,766 sq m.. The development will also consist of the following works to No. 97 Middle Abbey Street comprising the demolition of part of the existing basement (c. 16 sq m) and the existing rear extensions (Second and Third Floor Levels) (c. 11 sq m); change of use of the Basement Floor Level from retail (storage) to café (storage) (c. 112 sq m); continued use of the Ground Floor Level as a café (c. 89 sq m); change of use of the First, Second, Third and Fourth Floor Levels to provide 4 No. Build-To-Rent studio apartment units (one on each level) (which will be operationally linked to the 155 No, apartments scheme); and associated internal and external alterations to the building. Pedestrian access to this part of the development will be provided via Middle Abbey Street. The total gross floor area of this part of the development is c. 423 sq m. The development will also consist of: associated lighting; associated signage; associated hard and soft landscaping; and all bother associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply). The development will consist of the extension of the opening hours of the existing multi-storey car park ('Arnotts' Car Park) from its current operating hours of: Monday - Wednesday (07:00 - 20:00); Thursday (07:00 - 21:00); Friday - Saturday (07:00- 20:00); and Sunday (09:00 - 20:00) to the operation of the car park on a 24 hours per day, 7 days per week basis for temporary period of 5 years.
The development will consist of: - The installation of new external roller shutter at entrance door, to replace previously instated internal roller shutter at entrance door. - The replacement of the existing fascia to Henry Street, Moore Street and corner of Henry Street and Moore Street. - New signage to the Henry Street and Moore Street fascia to replace previous signage. - New internal signage on the corner of Henry Street and Moore Street. - New projecting signage to Henry Street and Moore Street. The building is located within the O'Connell Street Architectural Conservation Area.
The development will consist of change of use at first, second and third floors from storage / retail to residential creating eight new residential apartments (2x studios apartments, 5 x one-bed and 1 x two-bed) and part change of use at basement level to provide residential storage and 13 bicycle storage. Internal works comprise removal of internal walls and staircase, fit out of residential units and installation of timber secondary glazing system. External works comprise replacement of existing entrance door and installation of new entrance porch on Moore Street, installation of new granite cill above shopfront on Henry Street and Moore Street, reinstatement of rear elevational windows, new external communal residential amenity space at rear first floor roof level with 1.8 metre high privacy screen, replacement / new plant at first floor roof and upper roof level, repair of existing parapet, new lift overrun at roof level and all associated works.
Permission for an extension to The Abbey Hotel consisting of additional floors to existing hotel, to increase accommodation from 21 bedrooms to 45 bedrooms, comprising the following development: A) Demolition of localised internal walls & floor structure at Ground, First, Second, & Third Floor levels and demolition of pitched roof to rear at Second Floor Level and to flat roof at front at Fourth Floor Level. B) Proposed infill floor extension at first Floor Level to rear C) Proposed floor extensions at Second, Third & Fourth Floors to rear D) Proposed new Fifth & Sixth floor extensions E) Revisions & alterations to upper floor facade to Abbey Street Elevation and proposed new shopfront/entrance & facade to North Lotts elevation with alterations to all elevations, with localised internal floor layout modifications at all levels. F) Provision of lightwells and rooflights at First Floor and at Sixth Floor Level G) Proposed surface water attenuation at basement level and all associated site and development works.
The development will consist of (a) the removal of the existing stall risers and general modifications to the existing shopfront, (b) the removal of the existing fascia signage, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs and modifications to the shopfront, (d) the installation of new internally illuminated fascia signage, and (e) all associated site works.
The development will consist of amendment to the previously approved planning permission, DCC application no. 3991/17 comprising of the change of use of the 2no. existing ground floor retail units at nos. 181 & 185 Townsend Street from retail to residential use to provide 2 no. 1 bedroom ground floor apartments; North façade (front elevation to Townsend Street): removal of ground floor shopfronts and redundant fascia, repair and renewal of underlying brickwork; replacement of existing windows and doors; enlargement of existing door opening and provision of a gate for service access at no. 180 Townsend Street, South façade (rear elevation): the removal and reconstruction of 2 no. rear yard structures to unit no's 181 & 185 with a flat roof concrete deck structure as per adjacent approved units; 4 no. new openings to provide individual apartment windows & entrance doors accessed from the rear yard; omission of approved access gate to adjacent laneway to west of site; relocation of approved bin store to the east of the approved stair core on the south boundary; and all associated siteworks.
The subject site is principally bounded by: Arnott's Department Store and Henry Street to the north; Middle Abbey Street to the south; William's Lane to the east and Liffey Street Upper to the west. The development will consist of the extension of the opening hours of the existing multi-storey car park from its current operating hours of: Monday - Wednesday (7.00-20.00); Thursday (7.00-21.00); Friday - Saturday (7.00-20.00) and Sunday (9.00-20.00) to the operation of the car park on a 24 hours per day, 7 days per week basis.
PROTECTED STRUCTURE: Permission for development on lands (c. 0.791 ha) at 64, 65 and 66, Gardiner Street Lower, and all associated sites to the rear addressing Moland Place, Dublin 1. Nos. 64, 65 and 66 Gardiner Street Lower are Protected Structures. The development will consist of the following: - Refurbishment/ alterations and change of use of existing buildings on the site and construction of new buildings to the rear to provide a hotel development (72 bedrooms) with ancillary public restaurant (c. 96 sq.m) and associated ancillary uses. The overall building will comprise a gross floor area of c. 2,747 sq.m of which c. 1,071 sq.m is accommodated within the existing buildings and c. 1,676 sq.m is new build. The refurbished existing frontage buildings incorporating Nos. 64, 65 and 66 Gardiner Street Lower contain 32 bedrooms and involve internal reconfiguration to restore many of the formal rooms to their original layout. The frontage buildings which are to change to hotel use are currently arranged as follows: Nos. 64, 65 and 66 Gardiner Street Lower (former medical, office and related uses, now vacant), lands to the rear of these properties is an existing car park. -The development will include the demolition of non-original internal partition walls and replacement with appropriate internal wall treatments, demolition of the rear modern concrete boundary wall fronting Moland Place, modifications to existing returns of 64 and 65 at basement and ground floor level to allow interconnection between the new rear block and the protected structures to the front. -The main entrance to the hotel and lounge area is proposed at No. 65 Gardiner Street Lower. -The development involves works and change of use of the protected structures (recent use as medical, office and associated uses including a car park to the rear) and rear returns to the rear of Nos. 64-66 Gardiner Street Lower to use a hotel, restaurant and ancillary uses. -The new build element is located to the rear and is located along the boundary with Moland Place where a second hotel entrance is proposed. 2 no. new external landscaped courtyard spaces (c. 139 sq.m total) are provided on either side of the link building to the rear of Nos. 64-66 Gardiner Street Lower. The new building contains 40 bedrooms, a kitchen at basement level, a restaurant space at ground level, a services room, customer toilets and ancillary accommodation, all over 6 levels (including a basement level) with balconies at fifth floor level. -No on-site car parking is proposed. -Works to the existing front buildings (Nos. 64-66 Gardiner Street Lower) will include conservation repairs to existing historic sliding sash windows and repointing of front and rear brick elevations to include wigged pointing on the Gardiner Street Lower elevation. -The roofs will undergo re-slating with new natural slate. -The existing buildings will accommodate the hotel reception, 32 no. hotel bedrooms, lounge areas and will retain an existing customer lift all over 5 levels (including basement level). -The development will also consist of signage consisting of a projecting sign and associated lighting at the entrance on Gardiner Street Lower elevation and a surface fixed sign over the secondary entrance at Moland Place; and all ancillary works associated with the development.
PROTECTED STRUCTURE: Proposed alterations to the existing shopfront and new signage to signboard, at 78 Marlborough Street, Dublin 1 (a protected structure).
PROTECTED STRUCTURE: RETENTION/PERMISSION: Retention and permission for alterations to development approved under Reg. Ref. No. 4014/20 (and later amended under Reg. Ref. Nos. 4910/23 & 5024/23). Retention is sought for (i) a revised and reconfigured internal floor plan layout from basement to third floor level of all three properties comprising all ancillary works necessary to facilitate, inclusive of new partition walls, wall removals, new door openings, creation of fire lobbies, creation of suspended ceilings, provision of vertical service risers, provision of bulk heads over ensuite bathrooms and lobby areas and new mechanical and electrical services installations; (ii) at basement floor level provision of wall to contain existing staircase in No. 66; (iii) at third floor level - provision of a new opening in the party wall between No. 64 and No. 65. Permission is sought for (i) a revised and reconfigured internal floor plan layout from basement to third floor level of all three properties comprising all ancillary works necessary to facilitate, inclusive of new partition walls, wall removals, new door openings, partial removal of suspended ceilings, reduction in size of vertical service risers and new mechanical and electrical services installations; (ii) removal of velux rooflight to No. 65 and replacement with a larger access hatch; (iii) provision of a new chimney flue to the rear of No. 64; and, (iv) general refurbishment works to floors, ceilings, windows and internal joinery. The works for which retention and permission is sought will result in the provision of a 24 No. bedroom Hotel. Each of the buildings on site is a protected structure.
PROTECTED STRUCTURES: Amendments to a permitted development under Reg. Ref.: 4014/20 at Nos. 64, 65 and 66 Gardiner Street Lower and all associated sites to the rear addressing Moland Place, Dublin 1. Nos. 64, 65 and 66 Gardiner Street Lower are Protected Structures. Nos. 64, 65 and 66 Gardiner Street Lower are Protected Structures (RPS Ref. Nos. 3065, 3066 and 3067). The proposed amendments consist of: •Omission of the basement level to the permitted hotel to the rear of the site addressing Moland Place; • The provision of a new stair core to the rear of the permitted hotel addressing Moland Place; • Revised internal layouts at ground, first, second, third and fourth floor levels; • The provision of a new substation and plantroom/water storage area at ground floor level; • Revised doors and windows on the Moland Place elevation at ground floor level; • Removal of two permitted windows to the rear elevation at ground floor level; • No amendments are proposed to the permitted development within the protected structures, Nos. 64, 65 and 66 Gardiner Street Lower and; • All associated site development works, and elevational changes as a result of the amendments and associated site development works.
PERMISSION for amendments to a permitted development Reg. Ref: 4014/20 at Nos. 64, 65 and 66 Gardiner Street Lower and all associated sites to the rear addressing Moland Place, Dublin 1. Nos. 64, 65 and 66 Gardiner Street Lower are Protected Structures (RPS Ref. Nos 3065, 3066 and 3067). The proposed amendments consist of: Installation of an external wheelchair accessible platform lift between ground and basement level to the front of the property. Removal of a section of existing granite plinth and two sections of railings to accommodate two new gates to the proposed platform lift and all associated works to facilitate the development.
PROTECTED STRUCTURE:PERMISSION & RETENTION:Works at ground and basement level change of use at upper floor levels restaurant and from office to hotel use at No.7 Westmoreland Street, D02 XF76 and 39 Fleet street D02 EK07 and associated development works, protected structure, and alterations to Temple Bar Inn hotel at basement, ground and fourth floor levels at 40-47 Fleet St, Temple Bar, Dublin 2, D02 NX25 Retention Permission is for: 1. modification to mezzanine level at ground floor,2. retention of basement opening connection to Temple Bar Inn 3. retention of rear yard deck at ground floor level 4. retention of alteration of existing window at ground floor to form an opening to rear yard 5. retention of dumb waiter unit between basement (restaurant) and ground floor (restaurant) Planning Permission for development works to consist of: 1. Upgrade of the building to include passive fire upgrade works, alarm and detection system, electrical and mechanical services upgrade for adaptive reuse to hotel from office use. 2. Refurbishment of interior and reordering layout to provide 10-bedroom suites with ancillary facilities. 3. Alterations to, including extension of existing Lift shaft at rear to provide new lift serving all floors. 4. New Internal connection to the Temple Bar Inn Hotel, 40-47 Fleet Street at basement and ground level. 5.New secondary means of fire escape enclosed external link at the rear providing internal connection between third and fourth floor to the Temple Bar Inn Hotel, 40-47 Fleet Street with enabling works to rear façade and alteration to chimney stack base at the rear 6. Removal of external fire escape stairs at fourth floor level of Temple Bar Inn Hotel 7. New dormer windows to mansard roof onto Fleet Street 8. Alterations to ground floor shopfront. 9. Removal of modern secondary internal casement windows at first floor level 10. Provision of an aov rooflight above stair well at roof level.
RETENTION: Planning permission is sought for retention for use as short term letting of one bedroom apartment, no. 55 College Gate located at fourth floor level of existing apartment development at College Gate, Townsend Street, Dublin 2.
PROTECTED STRUCTURE:PERMISSION:For the change of use of a protected structure, from retail/ancillary office use to residential use as a single six- bedroom townhouse. The development will include the following alterations: a) the reopening of the area at the front of the building at basement level; b) addition of railings and a new shop front; c) demolition of the existing 20th century rear extension and rebuilding of a contemporary 2 storey return to the rear; d) the removal of existing pitched roof over 3rd floor room to the rear and replacement with a flat roof to achieve sufficient headroom to provide for an additional bathroom and bedroom with open terrace to the rear of the bedroom; e) extend existing pitched roof to the front over staircase to meet party-wall of 76 Marlborough Street; f) the conservation and repair of all existing historic fabric including staircase, joinery, facades, brick-stone vault structure and external stone stair to the rear; g) the addition of a landscaped garden amenity space to the rear.
Vaibhava Lakshmi Retail Limited is applying for planning permission for a change of use to add alcohol off-license sales to the existing ground floor retail premises at Day Today, 10 Bachelors Walk, Dublin 1, D01 NP78.
PROTECTED STRUCTURE: The development will consist of the following: Change of use from bank to restaurant with associated internal and external works including the following: Removal of alterations to internal elements of the former, contemporary bank layout (including removal of glazed screens and other partitions) and provision of new partitions/internal doors to facilitate a restaurant layout that includes a concierge, bar area, dining areas, servery/drop off area, kitchen, WC's, staff/back of house areas, storage/plant at ground floor and basement level -1. Provision of entrance/window signage (7 no. totalling c.2.5 sqm), upgrade of existing main entrance door (on Westmoreland Street) and installation of a new window (to replace existing timber screen) to left (north) of main entrance. All associated site development and services provision including ductwork.
PROTECTED STRUCTURE: PERMISSION & RETENTION: Permission for proposed change of use of no. 33 Gardiner Street Lower/ Deverell Place Dublin 1 and the ground floor & basement level of the interlinked building to the rear of no. 33-34 Gardiner Street Lower / Deverell Place, from office use to guesthouse use, providing an additional 17 no. ensuite bedrooms and ancillary rooms situated in both buildings, all to function as a single guesthouse in both no. 33 and 34 Gardiner Street Lower, Dublin 1, both of which are Protected Structures. Retention permission is also sought for minor alterations to interiors of no. 34 Gardiner Street, alterations to the courtyard elevational treatment of the building to the rear of 33-34 Gardiner Street / Deverell Place together with the retention of the sub-basement level partially beneath the building to the rear of 33-34 Gardiner Street / Deverell Place, Dublin 1.
PROTECTED STRUCTURE: The development consists of installation of proposed awning and signage to the ground floor entrance door to the West Facade of 40/41 Westmoreland Street, (Record of Protected Structures 8549) in accordance with the lodged plans and documents to include all associated/ancillary works.
The development will consist of the partial demolition of the ground floor, to create a new vehicular access off Frenchman's Lane, resulting in the loss of 25sqm from Beresford Hotel. The proposal involves the partial removal of the existing facade at ground to create new openings, front and rear, with new metal gates added to Frenchman's Lane.
PROTECTED STRUCTURE: The development will consist of roof, chimney, valleys, parapet, rainwater good repair. Removal of redundant services on façade; shopfront signage investigation; front and gable brick repointing; repair of window openings; repair of rear façade render, with the intention of fully weathering the envelope of this protected structure.
We, HPREF Ireland (Georges Quay and Court) DAC, intend to apply for planning permission for development at One George's Quay Plaza, Georges Quay, Dublin 2. The development will consist of alterations to the façades at ground and first floor level at the North and East Elevations, including the provision of replacement entrance doors and associated amended glazing, cladding and panels surrounding the entrance areas, removal of existing secondary canopies and associated upgrade works to the retained canopies above the entrance doors, installation of new planters, and all associated site and development works.
Permission for development consisting of change of use of first & second floors from existing office/commercial space to 2 No. new two bedroom apartments for short term letting with associated minor internal alterations, all located at first & second floors, no.5 Aston Quay, Dublin 2, D02K504.
PROTECTED STRUCTURE: The development will consist of: (i) works at ground floor level to include the demolition of the rear return and construction of new rear return to provide 3 no. new bedrooms, new stairwell and new external courtyard; (ii) revision of first floor layout and extension of first floor to provide 5 no. new bedrooms and new stairwell; (iii) provision of three-storey extension atop non-original two-storey rear element to provide 12 no. additional bedrooms; and, (iv) all ancillary works, from basement to fourth floor level, necessary to facilitate the development. The cumulative works will increase the number of hotel bedrooms from 34 to 54 no. The subject property is a protected structure (RPS No. 7991).
The development will consist of: the change of use of the existing building from retail at ground floor and basement and offices overhead to a 38 bedroom hotel with the addition of a new extension floor at attic level, for hotel use. The development will include, Basement- kitchen, storage and other services, Ground floor level hotel reception / check-in area, bar/café, disabled WC, lifts, stairwells and circulation areas; First to Fifth storey - provision of general bedroom accommodation with en-suites, lifts, associated ancillary areas and circulation areas; a new extension at roof level to a smaller footprint than the lower building levels to provide storage, bedrooms with en-suites, and ancillary facilities. One of the two existing retail units at street level will remain unaltered. The ground floor elevation will be upgraded and there will be no changes to the elevations of the existing upper floors. The new attic level will be set back from the existing elevations.
The proposed development will include upgrade and refurbishment works to existing building at 1-3 Westmoreland Street (approximately 1080 sq.m) and its basement and provide a new extension at roof level to provide hotel accommodation and associated ancillary facilities. The development will consist of: Internal and external modifications, reconfiguration, refurbishment and change of use of no. 1-3 Westmoreland Street and its vacant floors (to be extended) from retail/office to provide hotel facilities including a reception area, kitchen, storage, bedrooms, ensuites, circulation space and ancillary facilities. External works include the upgrading of the facades addressing Westmoreland Street and College Green - provision of a new facade frontage, new window and doorway configurations at ground floor level of the eastern facade and provision of a new facade frontage to the southern facade facing College Green. An extension at roof level to the same footprint of the lower building levels to provide storage, bedrooms, en-suites, circulation space and ancillary facilities. All of the above, resulting in the provision of a 40 no. bedroomed hotel building and all associated ancillary facilities as follows: Ground floor level - hotel reception/lobby/check-in area, disabled WC, office areas, lifts, stairwells and circulation areas. First to Fifth storey - provision of general bedroom accommodation, ensuites, lifts, associated ancillary areas and circulation areas. Basement level - plant area, toilet facilities, kitchen, storage areas, ESB switchroom and comms room, lift and circulation areas (with an overall basement area of approximately 145sq.m) The development will also comprise 2 no. signage zones on Westmoreland Street approximately 0.25sq.m and approximately 0.24sq.m and 2 no. projecting signs off the ground floor facade approximately 0.3sq.m each. Drainage works and all associated site development and ancillary works.
Planning permission for development at a site of 0.018 ha at nos. 108/109 Middle Abbey Street, Dublin 1. The proposed development consists of the partial demolition of the rear of the retail / shop building from basement to second floor levels (c. 211 sq m in total), the change of use of the remaining retail / shop building to licensed restaurant / cafe use at all levels and the provision of new build areas to the rear from basement to second floor levels (c. 204 sq m in total) to provide licenced restaurant / cafe use, all resulting in a licensed restaurant / cafe building of c. 580 sq m (including ancillary space such as circulation cores and walls), which includes, provision of a licensed restaurant / cafe area including customer seating, associated ancillary office space, cook/servery, accessible toilets, kitchen (including food preparation area). dumbwaiter and storage and other related spaces. The proposed development also consist of the provision of a signage zone (c.1.2 sq m) on the Middle Abbey Street elevation; a new ventilation and duct system; associated plant; a louvre screen at roof level; associated internal and external alterations; changes in level; associated site servicing (foul and surface water drainage and water supply); and all other associated site excavation and site development works above and below ground.
PROTECTED STRUCTURE for development including amendments to previously permitted alterations (Dublin City Council Reg. Ref. 3270/22 at this c. 0.16 ha site at Temple Bar Inn and Tesco Metro, Nos. 40-47 Fleet Street and Parliament row, Dublin 2, D02 NX25, and the party wall to No. 39 Fleet Street, D02 EK07/No. 7 Westmoreland Street, D02 XF76 (Protected Structure). (The extant planning permission (Reg. Ref. 3270/22) which is partially implemented, permits inter alia the relocation of the existing electrical substation and switchroom from existing basement level to the rear service yard and subsequent change of use of the substation area to hotel use (43 sq m), provision of a new entrance door and glazed screen, provision of a new internal stairs to basement level directly from Fleet Street, and all associated works.) The development will consist of the following demolition: part of the Basement Level; the single storey structure to the rear of the Ground Floor Level; part of the First Floor Level to the front to create a double height main entrance; the rear return from First to Third Floor Levels; and the Fourth Floor Level. Total demolition Gross Floor Area 1,319 sq m. The development will consist of the construction of new hotel floor area comprising: rear extensions to Basement Level; rear extensions of the Ground to Third Floor Levels; an extended replacement Fourth Floor Level; new Fifth Floor Level; new set back Sixth Floor Level with a separate roof top access to the east and a roof top terrace bar to the north and west incorporating canopy structure and PV panels above; enclosed plant room at roof level set back from all facades with screened roof plant above (total new Gross Floor Area 5352 sqm); and the provision of opes to No. 39 Fleet Street/No. 7 Westmoreland Street at Basement, Ground, and Fourth Floor Levels. The development also includes the change of use of part of the Ground Floor Level retail unit to hotel use (848 sq m). The development will result in an increased number of hotel bedrooms by 111 No. (from 101 No. to 212 No. proposed), with associated hotel facilities (including licenced public bar/restaurant/hotel lounge at Basement Level (633 sqm) and licenced public bar/ restaurant at Ground Floor Level (363 sq m), external licenced public bar at Roof Level (375 sq m), reception and seating areas, storage, administration and staff facilities, other hotel-related back-of-house areas, enclosed service yard, plant (including substation and switchroom), waste storage and cycle parking) and an own-door Ground Floor Level retail unit (177 sq m). The proposed development also includes: new facades, recessed at the front at Ground Floor Level; alterations to internal layouts; new entrance doors to Parliament Row, Fleet Street and the rear; alterations to services (mechanical and electrical, piped services); PV panels; plant and all associated site development and excavation works above and below ground. The proposed development will result in a building with a total gross floor area that increases by 4,264 sqm (from 4,634 sq m, including the surface level substation, to 8,898 sq m proposed) resulting in a seven storey building (with setbacks) excluding enclosed roof plant room above, all over Basement Level.
Construction of a new electrical substation and switch room to the rear of the site, relocation of the existing electrical sub station and switch room (43m2) from existing basement level to the new location at the rear of the site, a change of use of the existing substation area to hotel use, provision of a new entrance door and glazed screen, provision of a new internal stairs to basement level directly from Fleet Street, repositioning of existing signage and all associated site works.
PROTECTED STRUCTURE: The development will consist of: Demolition of non-original single storey and 2-storey extensions to the rear resulting in the loss of 9 no. hotel bedrooms; Refurbishment and re-use of the original coach house structure fronting Mabbot Lane; Construction of 5-storey over ground level extension to the rear fronting Mabbot Lane to provide 30 no. hotel bedrooms (net addition of 21 no. bedrooms); The extension will be connected to the ground floor of No. 75 Gardiner Street Lower with a central glazed link creating 2 no. landscaped courtyards for hotel guests on either side; Demolition of existing non-original gantry fire escape and construction of new escape stairs to the rear of No. 75 Gardiner Street Lower to comply with building regulations; Replacement of non-original, aluminium windows in No.74 and 75 Gardiner Street Lower with period-appropriate timber sash windows; Bin storage, landscaping and all associated site works and services.
The development will consist of the upgrading and installation of 13 number new wayfinding information signs located within the George's Quay Complex. These signs will be located externally and mounted on existing structures and buildings at ground floor level. The proposed wayfinding signage is to assist pedestrians to identify buildings and facilities within the complex. All signs shall be high quality back painted glass and screen printed with powder coated metal frames and flush brushed stainless steel fixings. The proposed signage locations include: Block A: 3 no. surface mounted signs; 3310mm high x 1300mm wide. External stairway: 1 no. surface mounted sign; 2300mm high x 600mm wide; Low Planters: 3 no. surface mounted powder coated aluminium signs; to 900m high x 3000mm wide, 550mm high x 1020mm wide & 550mm high x 1020mm wide; Cafe wall: 1 no. surface mounted sign: 2800mm high x 1200mm wide; Glazed Walkways: 3 no. surface mounted signs; 2450mm high x 600mm wide, 2475mm high x 960mm wide & 2475mm high x 960mm wide; Glazed walkway; 1 no. suspended sign 2850mm high x 1300mm wide & Railway Arches; 1 no. freestanding sign 3610mm high x 1300mm wide on a solid polyester powder coated aluminium base.
PROTECTED STRUCTURE: Permission for a period of 7 years at a site, 'Dublin Central - Site 4', (c. 0.3 Ha) at Nos. 10 - 13 and Nos. 18 - 21 Moore Street, No. 5A Moore Lane (also known as Nos. 15 - 16 Henry Place), Nos. 6 - 7 and Nos. 10 - 12 Moore Lane and Nos. 17 - 18 Henry Place (also known as Nos. 4 - 5 Moore Lane), Dublin 1. Also, the site includes the rear of Nos. 50 - 51 and Nos. 52 - 54 Upper O'Connell Street, No. 13 Moore Lane, No. 14 Moore Lane (otherwise known as Nos. 1 - 3 O'Rahilly Parade and Nos. 14 - 15 Moore Lane or Nos. 1 - 8 O'Rahilly Parade and Nos. 14 - 15 Moore Lane), Dublin 1 and otherwise generally bounded by No. 22 Moore Street and No. 13 Moore Lane to the north, Moore Lane to the east, Moore Street to the west and Henry Place to the south. Nos. 14 - 17 Moore Street (National Monument / Protected Structures) is bounded north and south by the proposed development. The proposed development comprises a mixed-use scheme (c. 3,290 sq. m gross floor area) in 2no. parts located north and south of the Nos. 14 - 17 Moore Street (a National Monument / Protected Structures) ranging in height from 1 - 3 storeys including retained independent single storey basements comprising 15no. apartment units (c. 1,454 sq. m gfa), café / restaurant use (c. 864 sq. m gfa), retail use (c. 617 sq. m gfa), cultural use (c. 60 sq. m gfa) and office use (c. 295 sq. m gfa). The proposed development to the north of Nos. 14 - 17 Moore Street consists of: - Nos. 20 - 21 Moore Street are refurbished and adapted to provide 1no. café / restaurant / licenced premises with takeaway / collection facility (c. 80 sq. m in total) at ground floor addressing both Moore Street and proposed new public plaza to the rear and 1no. 1-bed apartment and 1no. 2 bed apartment located at 1st and 2nd floor level - 4no. in total (cycle and bin storage at ground floor level). No terraces or balconies are proposed to the residential units; Provision of a new 2 storey extension at the side of No. 17 Moore Street (National Monument / Protected Structure) to act as an extension for ancillary use to the National Monument - a cultural facility (c. 60 sq. m gfa); Provision of an archway between the gable of No. 20 Moore Street and the new 2 storey extension to No. 17 Moore Street (National Monument / Protected Structure) to form an entrance to a new public plaza off Moore Street; Provision of a 2 storey building with profiled roof consisting 1no. licenced restaurant / café unit with takeaway / collection facility (c. 250 sq. m gfa). This building sits independently of the northern boundary of No. 9 Moore Lane at the rear of Nos. 14 - 17 Moore Street; Provision of part of a new public plaza (1,085 sq. m) and associated temporary works pending completion of the combined plaza with the concurrent planning application for the adjoining Site 5 immediately to the north (1,253 sq. m public plaza overall); The proposed development to the south of Nos. 14 - 17 Moore Street consists of: - 11no. apartment units (7no. 1-bed apartments and 4no. 2-bed apartments), accessed from proposed central courtyard from Henry Place in 2 - 3 storeys buildings (1 storey to rear) contained above ground floor within No. 10 Moore Street (refurbished and adapted), Nos. 11 - 13 Moore Street (replacement buildings with party wall of No. 12 and No. 13 Moore Street retained) and No. 5A Moore Lane (also known as Nos. 15 - 16 Henry Place - replacement building) and Nos. 17 - 18 Henry Place (also known as Nos. 4 - 5 Moore Lane - ground floor façade retained) with associated resident storage area at basement level of No. 10 Moore Street; 5no. retail units at ground floor: Unit 6 (c. 149 sq. m gfa ) and Unit 7 (c. 128 sq. m gfa) on Moore Lane, Unit 10 (c. 69 sq. m gfa), Unit 11 (c. 149 sq. m gfa - including basement level) and Unit 12 (c. 58 sq. m gfa) on Moore Street; 2no. licenced restaurant / café units with takeaway / collection facility at ground floor: Unit 4 (c. 250 sq. m gfa - including basement level) onto Moore Lane and Unit 7 (c. 130 sq. m gfa - including basement level) onto Moore Street; 1no. office unit at first floor (c. 221 sq. m gfa) of 6 - 7 Moore Lane with access from ground on Moore Lane; A new courtyard is proposed between the rear of Moore Street buildings and Moore Lane buildings to provide communal open space (c. 155 sq. m) for the residential units; All apartment served by terraces / balconies with exception of Unit 13, No. 10 Moore Street. All associated and ancillary site development, conservation, demolition, landscaping, site infrastructure and temporary works, including: - Conservation, repair, refurbishment and adaptive reuse of part of existing building fabric including: - Retention of Nos. 20 - 21 Moore Street with internal and external modifications and new shopfronts; Retention of No. 10 Moore Street with internal and external modifications and new shopfront; Retention of Nos. 6 - 7 Moore Lane with internal and external modifications and new shopfronts; Works to include repair and upgrade works (where required) of existing masonry, external and internal joinery, plasterwork and features of significance; Demolition of rear boundary wall onto Moore Lane at the rear of Nos. 50 - 51 and Nos. 52 - 54 (a protected structure) Upper O'Connell Street, Dublin 1; Demolition of all other existing buildings and structures on site (c. 4,525 sq. m); 44no. bicycle parking spaces serving residential, retail and office; Plant at basement and roof level; 1no. ESB sub-station onto Henry Place; Building signage zone and retractable canopies; Removal of existing boundary fence at junction of O'Rahilly Parade / Moore Lane within that part of the site including No. 13 Moore Lane, No. 14 Moore Lane (otherwise known as Nos. 1 - 3 O'Rahilly Parade and Nos. 14 - 15 Moore Lane or Nos. 1 - 8 O'Rahilly Parade and Nos. 14 - 15 Moore Lane). The application site is within the O'Connell Street Architectural Conservation Area and adjoins a National Monument / Protected Structures. An Environmental Impact Assessment Report (EIAR) accompanies this planning application. The planning application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours and a submission or observation in relation to the application may be made to the authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the authority of the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
PROTECTED STRUCTURE: Permission for development for the remodelling of existing suites and rooms on 2nd, 5th and 6th floors to 25 no. ensuite hotel bedrooms to the Gresham Hotel (the T Wing), at 20-22, 23-24 Upper O' Connell Street, Dublin 1, D01 TW21. The development will consist of internal conversion of 2 rooms and suite (225m2) to create 8 no. new ensuite rooms on 2nd floor with internal remodelling of existing room and improved internal 6th floor access (60m2) on 5th floor, conversion of 4 suites (542m2) to create 16 no. new ensuite bedrooms with replacement of external glazing to Southern façade, balustrading, and screening to existing external roof terraces on 6th floor. The main Gresham Hotel building is a protected structure; however the proposed development has no impact on the protected structure building.
PROTECTED STRUCTURE: For the internal remodelling of existing gym (66m2) on 1st floor and storage room (23m2) on 6th floor to 4 no. ensuite hotel bedrooms (3no. on 1st floor & 1 no. on 6th floor) to the Gresham Hotel.