Alterations to an existing hip roof to the side to create a gable roof to accommodate an attic stairs to allow conversion of an attic into non habitable storage space.
Planning permission for conversion of existing
Planning permission for an extension to existing access driveway to facilitate the construction of a garage (c. 63.8 m2) and all associated site works to the southeast of the existing dwelling.
The development will comprise:- (i) Construction of 36 No. houses, comprising of 10 No. four-bedroom, 2-storey, semi-detached houses; 18 No. three-bedroom, 2-storey, semi-detached houses; and 8 No. two-bedroom, 2-storey, terrace houses. Each dwelling will feature a private rear garden and roof mounted solar panel or photovoltaic panels; (ii) Construction of 28 No. apartment/duplex units, comprising of 14 No. two-bedroom apartments and 14 No. three-bedroom duplex units, in 3 No. 3-stoey blocks. Each apartment/duplex unit is provided with a private balcony or terrace. The 3 No. blocks proposed are served by 430sqm of communal amenity space and roof mounted solar panel or photovoltaic panels. The proposed development includes 111 No. car parking spaces, inclusive of 64 No. on-curtilage car parking spaces serving the houses (2 No. spaces per 3 and 4 bedroom house and 1 No. space per 2 bedroom house), 41 No. car parking spaces serving the apartments/duplex units and 6 No. visitor car parking spaces, and 72 No. bicycle parking spaces (36 No. provided in 3 No. secure bicycle storage areas and 36 No. provided throughout the development); (iii) Construction of a 1,800sqm public open space area, featuring a playground, in the north-western corner of the site; (iv) Creation of new vehicular entrance from New Road along the site's southern boundary; (v) Alterations to existing site levels through the importation of clean, uncontaminated soil and stones to the site; and (vi) All associated site, landscaping and infrastructural works, including tree planting, boundary treatments; street lighting; ESB substations; internal roadways, footpaths and shared surfaces; and foul/SuDS drainage, necessary to facilitate the development. Temporary permission (5 years) is also sought for; (i) the erection of 3 No. advertising signs (totalling 42sqm), for the purposes of marketing, on the sites eastern and southern boundaries. AI received 01/04/21 CAI received 15/07/21 CAI deemed significant 27/07/21 Revised public notices for CAI received 30/07/21
Alterations to development approved under Reg. Ref. F20A/0510 ABP Ref. No. 311447-21) comprising: (i) relocation of ESB substation; (ii) rearrangement of 3 no. vehicular parking bays with no resultant change in quantum of vehicular parking spaces; (iii) revision to roof level of apartment block including an increase in parapet height from 20.93m to 21.085m (0.155m increase) and the provision of a lift shaft overrun; (iv) revision to ground floor level of apartment block comprising the replacement of balconies with private paved patios; (v) minor revisions to the eastern and southern elevations of the apartment block comprising changes to fenestration details and revised finishing materials; (vi) minor revisions to the roof pitch and roof level of all House Types (A/A1/B1/B2/B3/F); (vii) minor changes to elevation finishing materials (brick to be replaced with render) to House Types B1/B3; (viii) minor changes to fenestration details to House Types A/B1/B2; and, (ix) all ancillary works necessary to facilitate the development. The proposed works have been necessitated by construction stage design assessment and are substantially compliant with the development approved under Reg. Ref. F20A/0510 (ABP Ref. No. 311447-21) Lands at Ballymastone (north-west of the intersection of New Road and the Donabate Distributor Road), Donabate, Co. Dublin
We, Charlie’s Childcare Limited intend to apply for planning permission, for a temporary period of 5-years, at ‘Charlie’s Childcare’,Rahillion Walk, Donabate, Co. Dublin. The proposed development will consist of the construction of a new single storey portacabin to the rear of the existing building to accommodate 1 no. classroom with ancillary office and toilet facilities along with an access ramp; the removal of an existing boundary wall and gate and the construction of a new boundary wall and railing to facilitate the increased site size; and all associated site and infrastructural works needed in order to facilitate the subject development.
The construction of a new single storey portacabin to the rear of the existing building to accommodate 1 no. classroom with ancillary office and toilet facilities along with an access ramp; the removal of the existing boundary wall and gate; and the construction of a new boundary wall and railing to facilitate the increased site size; and all associated site and infrastructural works needed in order to facilitate the subject development.
Planning permission to construct a 36 meter multi-user lattice mobile and broadband tower carrying telecommunications equipment and cabinets enclosed within a 2.4m palisade fence compound with access track at Kilcrea, Donabate, Co. Dublin.
Retention permission is sought for an existing attic conversion consisting of non-habitable space & three roof skylights, with one skylight on the rear roof and two skylights on the side roof of the property. Planning permissions is also sought for a new ground floor single storey extension to the rear and side of the property.
NIS Marshal Yards Development company Limited intend to apply for a No. 7 year permission for development at this 3.84 Ha site in Corballis East, Donabate, Co. Dublin. The site is generally bound to the north by greenfield lands, to the south by lands with an extant permission for a Residential Development (Fingal County Council Reg. Ref. F22A/0527), to the east by the Donabate Distributor Road and to the west by lands subject to a Live Planning Application for a Large-Scale Residential Development (as per Fingal County Council Reg. Ref. LRD0017/S3). The proposed development partially amends the Residential Development permitted under Fingal County Council Reg. Ref. F22A/0527. The development, which will have a total Gross Floor Area of 8,028 sq m, will consist of: the construction of a Residential Development comprising 98 No. units including 70 No. two storey houses (35 No. 2 bed units and 35 No. 3 bed units), 4 No. three storey 4 bed houses, and 6 No. two storey maisonette buildings comprising a total of 24 No. 1 bed units. The development will also comprise of: alterations to the access road associated with the Residential Development permitted under Fingal County Council Reg. Ref. F22A/0527; the provision of internal roads and footpaths; pedestrian connections to the Donabate Distributor Road; pedestrian and vehicular connections to the adjoining site to the west (subject to a Live Planning Application for a Large-Scale Residential Development as per Fingal County Council Reg. Ref. LRD0017/S3); 73 No. car parking spaces; 5 No. car club spaces; bicycle and bin stores; hard and soft landscaping; balconies and terraces; boundary treatments; solar panels; 2 No. ESB substations; public lighting; and all other associated site and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development. AI recvd - 26/08/2024 SAI received 29/08/24 CAI Rcvd 01/11/2024
Permission for the construction of a two-storey side and single-storey rear extension along with alterations to the internal layout, alterations to external walls, and all associated site works.
Planning permission to 1. extended ridge line to convert hip roof to gable to extend existing converted attic space, proposed new roof window to front and rear roofs, 2.proposed side door to hall on gable side and additional first floor gable window to front bedroom. 3. Retention for ground floor kitchen window to side gable all with ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure, 1 no. roof window to the front, new access stairs and roof windows to the rear.
Permission for conversion of existing attic space to a play room, home office, study, and two store rooms, comprising of modification of existing structure, new access stairs, a dormer structure with two windows to the rear, and 2. no. skylight windows to the front elevations.
Planning permission for conversion of existing attic space to a bedroom with en-suite, home office, and two store rooms, comprising of modification of existing structure, new access stairs and 2 no. dormer windows to the rear
Permission for conversion of existing attic space to a play room, home office, study, and two store rooms, comprising of modification of existing structure, new access stairs, a dormer structure with two windows to the rear, and 2. no. skylight windows to the front elevations.
Planning permission for conversion of existing attic
NIS Marshall Yards Development Company Limited intend to apply for a 7 No. year permission for development at a 1.56 Ha site in Corballis East, Donabate, Co. Dublin. The site is generally bound to the north by greenfield lands and lands subject to a Live Planning Application for a Residential Development (as per Fingal County Council Reg. Ref. F24A/0169), to the south by lands with an Extant Permission for a Residential Development (as per Fingal County Council Reg. Ref. F22A/0527) and lands subject to a Live Planning Application for a Residential Development (as per Fingal County Council Reg. Ref. F24A/0169), to the east by the Donabate Distributor Road and to the west by lands subject to a Live Planning Application for a Residential Development (as per Fingal County Council Reg. Ref. F24A/0169). The development, which will have a Total Gross Floor Area of 2,582 sq m, will consist of: the construction of a Residential Development comprising 34 No. units including 22 No. two storey houses (10 No. 2 bed units and 12 No. 3 bed units) and 3 No. two storey maisonette buildings comprising 12 No. 1 bed units. The development will also include: vehicular and pedestrian connections to the Donabate Distributor Road, the Residential Development permitted under Fingal County Council Reg. Ref. F22A/0527 on lands to the south and the Residential Development subject to a Live Planning Application (as per Fingal County Council Reg. Ref. F24A/0169) on lands to the west; a pedestrian connection to the adjoining site to the north; 21 No. car parking spaces; bicycle and bin stores; hard and soft landscaping; balconies and terraces; boundary treatments; solar panels; an ESB substation; public lighting; and all other associated site and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development. The Planning Application together with the Natura Impact Statement may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. AI Received 12/02/2025
A 7 No. year permission for development at this 3.50 Ha landholding in Corballis East, Dona bate, Co. Dublin, which comprises 2 No. separate sites divided by the Donabate Distributor Road. The western site (3.34 Ha) is generally bounded to the north by greenfield lands, to the south and east by the Donabate Distributor Road and to the west by greenfield lands (subject to a live Planning Application for a mixed-use development as per An Bord Pleanála Case Reference TA06F.311059). The eastern site (0.16 Ha), which is subject to drainage infrastructure works only, is generally bounded to the north by greenfield lands, to the south by a wastewater pumping station and attenuation storage, to the east by greenfield lands and the Balcarrick Golf Course and to the west by greenfield lands and the Donabate Distributor Road. The development, which will have a total Gross Floor Area of 10,891sq m, will consist of: the construction of 96 No. residential units including 61 No. two storey houses (6 No. 2 bed units and 55 No. 3 bed units ranging in size from 78 sq. m to 117 sq. m) and 7 No. three storey 4 bed houses (150 sq. m), with associated private open space in the form of gardens and/or terraces facing all aspects, and 2 No. three storey duplex buildings comprising a total of 28 No. duplex units (14 No. 2 bed units and 14 No. 3 bed units ranging in size from 78 sq. m to 134 sq. m) with associated balconies/terraces predominantly facing north, south, east and west; and 1 No. two storey creche with associated rooflight to atrium (595 sq. m). The development will also comprise of the following on the western site: a vehicular access from the Donabate Distributor Road; internal roads, footpaths and a shared pedestrian and cyclist link; pedestrian connections to the Donabate Distributor Road; pedestrian and vehicular connections to the adjoining site to the west (subject to a live Planning Application for a mixed use development as per An Bord Pleanála Case Reference TA06F.311059); 166 No. car parking spaces; set down areas; bicycle and bin stores; hard and soft landscaping; boundary treatments; green roof; solar panels; plant; 2 No. ESB substations; lighting; signage; drainage works; and all other associated site and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development. The Planning Application together with the Natura Impact Statement may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. AI Received 14/02/2023 CAI Received 29/05/23
An underground wastewater pump station (a wetwell) with roof level up to 0.35m above ground level; an underground emergency storage tank, capacity 650m3 approx. with roof level up to 0.35m above ground level; An underground water tank, net capacity 6m3 approx. with roof level up to 0.15m above ground level; valve and flowmeter chambers; a chemical dosing facility for odour control; Kiosks; Landscaping, fencing and access off Balcarrick Road. The proposed development includes all necessary ancillary pipework and manholes, diversion of existing utilities; new power supply and water connection for the pump station, ducting, mechanical and electrical services, plant, instrumentation, automation, controls and equipment. It also includes all associated site development works, hardstanding areas and access, site drainage and lifting arrangements. Add Info received 25th March 2020. Add Info deemed Significant 6th April 2020. Revised Public Notices received 21st May 2020.
Planning permission for alterations to previously approved Reg. Ref. F22A/0145, alterations to consist of new gables to roof to allow for coversion of attic into non habitable storage space
Construction of a new detached two storey 3 bedroom house and new vehicular access. AI received 4/11/2022 SAI received 14/12/2022 AMENDED SAI received 21/12/22
Alterations to previously approved planning ref F19B/0186 by modifying first floor extension by extending roof, extending new dormer to side with window to front and side and new porch to front with timber cladding.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 1no. quad panel roof window and 2no. roof windows to the front and flat roof dormer to the rear. AI Received 05/03/2025
Development will consist of 6 No. new detached dwellings in the garden/site of Dun Aoibhinn, New Road, Ballymastone, Donabate, Co. Dublin, K36 A593. All new detached dwellings are 4 No. bed. The existing vehicular entrance to be moved/widened to accommodate the 6No. new detached dwellings & 1 No. existing dwelling and all ancillary works.
Permission for new Dormer to side, new first floor window to rear and remove existing balcony.
Development of a wastewater pumping station on a site of 674 sq.m(0.0674 ha). Above ground, the proposed gravel compound of 320 sq.m will accommodate a 2.7 metre high Control Kiosk of 4.41 sq.m, a 1.35 metre high Wet Kiosk, a 7.6 metre high vent column and external lighting. The proposed compound will be surrounded by a 2.4 metre high plastic-coated welded mesh security fence. Below ground, it is proposed to provide an emergency storage tank (10 metres x 9.6 metres), a c.6 metre deep wet well with submersible pumps, a valve chamber and meter chamber. It is proposed to provide a 51.5 metre long access road with a hammerhead turning facility from the Donabate Distributor Road (under construction). Add Info received 16th December 2019.
NIS Planning permission is sought for a development which will have a Total Gross Floor Area of 7,982 sq m, will consist of: the construction of a Residential Development comprising 96 No. units including 80 No. two storey houses (51 No. 2 bed units and 29 No. 3 bed units), 4 No. three storey 4 bed houses and 3 No. two storey maisonette buildings comprising 12 No. 1 bed units. The development will also include: vehicular and pedestrian connections to the Donabate Distributor Road; internal roads and footpaths; pedestrian connections to the adjoining sites to the north and east; 139 No. car parking spaces; bicycle and bin stores; hard and soft landscaping; balconies and terraces; boundary treatments; solar panels; 2 No. ESB substations; public lighting; and all other associated site and development works above and below ground. The site is generally bound to the north by greenfield lands, to the south by attenuation storage, to the east by greenfield lands and Balcarrick Golf Course, and to the west by Donabate Distributor Road. Additional Information received 22/04/2025 Significant Additional Information received 30/04/2025 Clarification of Additional Information received 31/07/2025
Planning permission for a single storey, flat roof extension to the rear of the existing dwelling. This will comprise of an extended living and kitchen space and 1 NO. additional bedroom. Proposed works also include partial demolition of an existing on site, domestic garage building.
Planning permission is sought for a development consisting of the (i) demolition of an existing detached dog kennels and sheds (100 sq. m.) to the rear of the cottage, (ii) alterations to the existing cottage (84 sq. m.), including part demolition (25 sq. m. demolition) and internal and external modifications, and, (iii) the Construction of a 170.7 sq. m single storey, 3-bedroom extension to the side and rear of existing single storey house, including upgrades to the existing driveway, entrance and rear-garden and all associated site works. The cottage will now provide 4-bedrooms, within a 229.7 sq.m area. The proposed development will also provide for a new wastewater treatment system, and all associated works.
Permission at 1 New Road,Ballymastone, Donabate, Co. Dublin for a development consisting of the (i) demolition of existing detached dog kennels and sheds (100 sq. m.) to the rear of the cottage, (ii) alterations to the existing cottage, including part demolition and internal and external modifications and, (iii) the Construction of a part single storey, part two storey ( 195 sq. m. total proposed extension works), 4- bed extension to the side and rear of existing single storey house (currently 84 sq. m.) including upgrades to the existing driveway, entrance and rear garden and all associated site works. The proposed development will provide for a new wastewater treatment system, and all associated works.
We, Pat Hughes and Catherine Elliot, intend to apply for retention permission for development at 1 New Road, Donabate, Co. Dublin. The development consists of amendments to the development previously approved under Reg. Ref. F23A/0427. The amendments include; a) Internal reconfiguration of the extension to provide a new bedroom at first floor level, increasing the size of the dwelling from the previously permitted single-storey 4-bedroom house to 2-storey 5-bedroom house; b) Elevational changes and fenestration; c) Removal of the previous chimney; d) Blocking up of the original vehicular access and construction of a new vehicular access onto New Road; and e) Construction of a single storey, detached garage/boot room/laundry room located to the rear of the house.
Planning permission is being sought for:
Planning Permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works.
Planning Permission for a single storey extension to the rear and side, alterations to existing rear extension roof, new roof lights, internal alterations, energy upgrades and associated site works.
We McHale Plant Hire Limited intend to apply for Planning Permission for the inclusion of a new foul sewer rising main and portion of gravity foul sewer plus associated decommissioning and removal of an existing on-site wastewater treatment plant at Staffordstown Business Park, Turvey, Donabate, Co. Dublin. The proposed foul sewer rising main will serve the Business Park by forming connection with an existing pump station on site with this rising main routed out of the Business Park down Turvey Avenue public road to the east, 2.5km approx. to a new discharge manhole connected to a proposed gravity foul sewer (ca. 585m long) to subsequently form connection with the existing Uisce Eireann foul sewer on Turvey Avenue adjacent to Turvey Woods Residential Development. The placement of this rising main will result in the decommissioning and removal of the existing treatment plant and associated percolation area in the Business Park.
A development consisting of the construction of 1 no. skills wall and 1 no. single storey storage building, new path and associated site development works. AI received 01/06/21
Planning Permission for an extension to their existing
For the construction of a new 30m high monopole structure with telecommunications equipment attached. Development will also consist of associated ground based equipment units and security fencing. The proposed development will replace the existing telecommunications tower at this location. The development will be carried out within the curtilage of a protected structure.
Retention permission for machinery shed and permission for single storey extension to machinery shed and permission for new single storey detached gym building and hard standing outdoor training space all with associated ancillaries Additional Information received 24/11/2025
The proposed development will consist of: Extensions to and renovation of existing two storey house (c. 75 sqm), consisting of the removal of existing porch (c. 4 sqm), the removal of existing conservatory (c. 6 sqm), 3 no. new windows to the side/west elevation of existing house, internal alterations providing utility room, WC, cloakroom and family room at ground floor level and new bathroom, 1 no. bedroom and study area at first floor level. Extensions to existing house will consist of a single storey extension to the rear/north, providing a kitchen, dining area, and a 2 no. storey extension to the side/east of the existing house providing a new entrance hall and living room at ground floor level, a bedroom with en-suite at first floor level and access to a balcony over the entrance hall off first floor landing area. Total additional floor area of the proposed extensions is c. 107 sqm, repositioning of existing entrance driveway and reconstruction of front boundary wall and associated site development works. AI Rcvd - 2/5/25
A single storey extension to the rear (total area 19.5m2), upgrading works to the existing structure including replacement windows through-out and new vertical and sloping combination windows at first floor level, as well as minor internal alterations and all associated site works. AI received 15/3/2022 CAI received 20/6/2022
The development will consist of the retention of an existing elevated timber observation hide ( Known as the North Observation Hide) of 4.3m in height above ground level with a Gross Floor Area of 12.96m2 previously approved under FCC Reg. Ref. F04A/0753.
Planning permission is sought for the construction of a single storey extension to the rear of existing dwelling.
Retention planning permission for the upgrade works to waste water treatment system and associated percolation area to increase volume to accommodate 8 people to rear.
Planning Permission for the renovation and extension of the existing derelict cottage to provide (1) for a 1.5 storey 5-bedroom dwelling (2) Landscaping and Boundary treatments (3) to provide sewerage system and percolation area to EPA standards and all associated works to facilitate the development.
Planning permission is sought for renovation, and extension to existing dwelling house, to include new dormer roofed extension to rear comprising kitchen/dining/living/bathroom accommodation to ground floor, and bedroom / bathroom accommodation to first floor, and associated site works.
The development will consist of a prefabricated lightweight metal frame single-storey workshop building (600sq.m) along with rainwater harvesting.
Retention of changes to approved permission F07B/0430 plus the addition of 1 front (south) facing 1.1 m sq skylight, 4 no. rear (north) facing 1.1 m sq skylights and a rear (north) facing dormer to facilitate attic toilet/shower room 8.6 sqm with new stairs for access.
Permission is sought for modifications to the existing single-story, 2-bedroom dwellinghouse, comprising the construction of a 2-storey extension to the rear (north) of the existing building; demolition of the existing sun room and part of the existing kitchen/dining room, removal of the roof level water tank, along with associated internal revisions to the layout and changes to the existing elevations necessary to facilitate the proposed development The proposal will provide for a 4-bedroom, 2 storey dwelling with roof terrace at first floor level. Permission is also sought for the replacement of the existing septic tank with a new on-site wastewater treatment system and percolation area and all associated site and infrastructural works necessary to facilitate the proposed development. AI Recvd 10/03/2025 SAI Received 31/03/25