Detached steel storage shed located to the rear with access from rear private lane.
Retention of Large detached shed with pitched roof over having vehicular access onto a private laneway to the rear, screened behind a steel framed, timber clad gates attached to rendered block pillars.
1. Remove existing flat roof and tiled roof canopy to ground floor Accommodation and construct new first floor extension with pitched roof over to side of existing dwelling 2. Remove existing porch structure and tiled roof and construct new porch to replace existing. 3. All above with associated site works.
The construction of a single storey extention to the front of existing 2-storey mid terrace and all associated site works.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Single storey side garage for demolition. Construction of 2 storey side extension with ground floor front extension and rear first floor extension with pitched roofs over and with 2 roof lights over in rear slope of roof.
Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.
Ground floor partial front extension; ground floor side extension with 3 rooflights over; ground floor rear extension with 1 rooflight over; all with pitched roofs over; dormer roof window on rear slope of roof at attic level.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Installation of new railing to front of building including pedestrian gate; installation of new access control system to car park; 2 new standalone illuminated identity signs; revisions to landscaping and associated site development and facilitating works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
(a) the demolition (total area approx. 4,319.9 sqm) of the existing buildings on site and the existing front boundary treatment; and (b) the construction of a new residential and mixed use scheme of 242 apartment units in 5 blocks (Blocks A to E) ranging from 4 to 7 storeys in height as follows: Block A (5 storeys) comprising 40 apartments (4 one bed, 31 two bed and 5 three bed units); Block B and C (7 storeys) comprising 102 apartments (45 one bed and 57 two bed units); Block D (5 - 7 storeys) comprising 36 apartments (16 one bed and 20 two bed units); Block E (4 - 5 storeys) comprising 64 apartments (31 one bed and 33 two bed units); Block D will accommodate a Childcare Facility/creche of approx. 465sqm at ground floor level; The proposal will also provide for a café of approx. 50.9 sqm at the ground floor of Block C. Residential amenity areas will be provided in the form of a reception of approx. 125.1sqm, resident lounge of approx. 45sqm, a letting office of approx. 11.8sqm, a rentable room/studio space of 39sqm, a public gym of approx; 128.5sqm and a public co-working space of approx. 128.4sqm, all at the ground floor level of Blocks B & C; Each residential unit will be afforded with private open space in the form of a balcony or terrace. Communal open space of 1,797.4sqm is proposed in the form of 2 roof top terraces at Blocks D and E, courtyard space at ground level, outdoor seating and planting and pedestrian and cyclist links; Public open space of 1,400sqm is also proposed in the courtyard area, fully accessible to the general public and includes outdoor seating, paved areas, a lawn area, and play areas in addition to an outdoor seating area to the front of the proposed café at Block C; A total of 136 car parking spaces are provided at ground floor level, including 7 Accessible spaces at surface level; and 426 bicycle spaces (Visitor and Resident in bike stands and secure stacked bike spaces) are proposed; The development shall be served via a new vehicular access point from Broomhill Road; Upgrade works are proposed to the vehicular access point to facilitate the proposed development and to provide for improved access and egress for the overall development. New pedestrian and cyclist access points will be provided on to Broomhill Road from the site; The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; boundary treatment; internal roads and footpaths; waste storage areas and electrical services and all associated site development works; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Construction of one dormer window in the main roof to the rear.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Modification to existing entrance gate and installation of ramp; dock leveller and buffer seals to existing vehicular building entrance and all associated ancillary site works.
Attic conversion with dormer roof to rear and all associated site works.
Construction of a non-habitable attic conversion with a dormer roof to the rear and all ancillary works necessary to facilitate the development.
Modifications to dwelling incorporating relocation of entrance door to front elevation; insertion of a single entrance door and associated blockwork in lieu of existing up and over door to garage; new pitched tiled roof over existing single storey element to dwelling; modification to window and door openings at ground floor level on rear elevation; increase in width of existing vehicular entrance.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
Retention of conversion from garage to utility room and removal of front wall.
Demolition of an existing building, 2 new portacabins, a power wash enclosure, fences, gantry and fuel dispensers, revisions to internal site layout to include new vehicular and pedestrian movement arrangements. revised bund walls, relocated stepped access route of tank farm and bottom loading skid, construction of new forecourt fuel area with 2 pump dispensers, new payment building, new single storey office building, new services area with 2 car parking spaces, 12 staff car parking spaces and 8HGV/Tanker parking spaces, all other associated underground and overground infrastructure, drainage, lighting, landscaping, and site development works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Ground floor front extension with pitched roof over, pitched roof over existing single storey side of dwelling & garage conversion to playroom.
Widening of existing vehicular access
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.
Extension of existing dwelling to include first floor extension over existing single storey side extension, 2no. dormer roof windows to rear of the existing roof structure, 2no. roof-light windows to rear of roof, 2no. roof-light windows to front of roof, internal alterations to existing layout, alterations to front, rear and side elevations and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Front extension to the existing garage converting the space into a gym and office, new windows to the side of the garage and access door to the rear garden, including all associated site works.
Ground floor extension to the rear of the house with pitched and flat roofs. Associated internal modification and site works.
Two-storey, 4 bedroom detached dwelling with vehicular access and 2 off-street, parking spaces and all associated site works at side garden plot.
For the construction of new attic room with en-suite and new rear dormer roof structure and associated works.
New dormer roof structure in existing rear concrete tiled roof structure with two no. ventilated rooflights, convert existing attic area into a non-habitable attic area and internal alterations
Retention of a single-storey flat roof garden room to the rear of the dwelling, with ancillary use and existing connections to water & electricity, all for purposes incidental to the enjoyment of the main dwelling.
The construction of a single storey 1 bedroom house (approx. 52 sq./m) with associated private open space and private car parking for social / older persons use on undeveloped lands of 0.192 hectares located off Old Bawn Way, Tallaght, Dublin 24. The development will also provide for all associated service connections and site works above and below ground.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.