Alterations to a steel framed agricultural shed as a change to that permitted under 17/1393 and all associated site and ancillary works
Extension and alterations to existing dwelling and garage. The works will include A. Construction of 12.6m2 single storey infill extension to connect existing 30m2 garage (now being converted) to existing 174m2 single storey dwelling. B. Conversion of existing garage to become part of the main dwelling which will contain a new bedroom and study and alterations and modifications to external elevations including 2 new rooflights. C. Minor alterations and modifications to existing dwelling layout and elevations and all associated site works
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346
(1) Retention permission of existing garage, plant rooms and first floor pigeon loft. (2) Retention of part built single story vintage car storage building and Permission to complete same with a flat green roof. (3) All associated site works
As constructed garage and location of effluent treatment unit
Existing extensions to front and rear of existing house and retention of change of use from residential to short-term letting use and associated works
Increased ridge height and first floor habitable floor area along with minor alterations and revisions to the elevations and internal layout of the existing dwelling originally approved under P.R.R. 07/1500 along with retention permission for the domestic garage & site development works including the retaining wall & concrete yard
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Single storey dwelling, wastewater treatment system to EPA standards, garage, entrance and associated works
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
New agricultural entrance
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
1. as constructed dwelling, garage & boiler house. 2. Retention permission for revised boundaries and as constructed driveway. 3. Permission for extension to the front elevation. 4. Permission to remove existing bay window and replace with a new bay window. 5. Permission for new window on the front elevation. 6. Permission for 2no. roof lights to the front roof plain. 7. Permission for roof alteration to existing garage. 8. Permission to upgrade existing effluent treatment system to comply with current EPA guidelines
Construct a stable building consisting of 3 No. stables and tack room and all associated site works
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Dwelling, garage, well effluent treatment system, new entrance and associated works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
1. change existing door on front elevation to a window 2. change of door style and removal of window side elevation 3. new window to side elevation 4. construction of an extension to the rear 5. construction of a garage 6. upgrading effluent disposal system to comply with current EPA regulations and associated works
Proposal to replace existing unauthorised log cabin with farm house, garage & waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works
A 12.3 square metre plant room, a 30.0 square metre shed as built, also retention for change of use from attic to 33.7 square metre storage area in attic of house, retention of rooflights, and retention for minor elevation changes to door and windows to house and garage from previous planning permission (952472) and all associated siteworks
1) the construction of single and two storey extensions to the existing house 2) changes to all elevations 3) retention of garage as constructed 4) retention of conversion of part of garage to home office 5) retention of detached sunroom 6) upgrade of effluent system to current EPA standards and all ancillary site works
1)permission for retention of existing calf house 2) permission for retention of existing slatted tank and permission to construct extension to existing cubicle shed to cover existing slatted tank, concrete aprons and all associated site works
Existing commercial parking depot & permission to extend the existing commercial storage facility along with all associated site development works
1. a three part extension to the rear and side of this dwelling house consisting of the erection/construction of: a) Three enclosing wooden panelled elevation walls and a roof to an existing ground floor over basement rear/ southern balcony to form a new room, the footprint of which extends beyond the eastern elevation of this dwelling. b) A wooden panelled single storey extension to the western side elevation that now forms an integrated L- shaped ground floor extension A. c) A wooden panelled lean-to roofed out building attached to part of the rear/ southern ground floor elevation thereof
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
(1) excavation works to rear of existing commercial property and construction of concrete wall and (2) placement of a container on lands along with all associated site development works
Erect extension to rear and side of our dwellinghouse, to carry out alterations to same, to revise existing entrance from the public road, to provide a new waste water treatment system on site and to carry out all associated ancillary works.
Installation of ESB Networks' compact modular MV EGIP substation to facilitate the connection of the consented Templerainey East Solar Farm (planning ref: 16/1285) to the electrical distribution system
Demolition of existing unused cow kennel shed and underground slatted slurry storage shed and for construction of a calf rearing shed and underground effluent storage tank and all associated siteworks
Construction of new two storey rear extension, internal layout changes to existing section of dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate works
A 10 year permission for the construction of an energy storage facility within a total site area of 0.48 hA to include containerised battery storage modules on concrete support structures, electrical transformer / inverter stations, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, lightning protection poles and ancillary equipment
1. construction of a porch extension. 2. construction of an extension to rear and side of existing house. 3. conversion of existing attic to habitable space to include 2 new dormer windows to rear. 4. changes to all elevations. 5. upgrade of existing treatment system and percolation area to current EPA standards
A 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy storage modules; lightning protection masts; Perimeter security fencing; Access tracks; undergorund cabling; temporary construction compound; tree plating; drainage infrastructure and all associated ancillary site development works
Proposed erection of a fully serviced dwelling house and domestic garage, new on-site wastewater treatment system and private well to EPA standards, proposed new entrance onto existing lane, together with associated and auxiliary site works
Extended living area to previously granted extension (Ref. No. 20/383) and associated works
154 sqm rear and side dormer style extension to 48 sqm dwelling, front dormer window to roof, proposed front porch, replacement wastewater treatment system to EPA standards in lieu of existing septic tank and associated works
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
The demolition of the 16sqm rear extension (total area of existing house is 64sqm), construction of a single storey render clad extension (approx. 111sqm) to the rear of the retained portion of the existing house, changes to selected window opes, external wall finishes and roof of the existing house, a bored well, a new site specific treatment unit and percolation area replacing an existing septic tank and soak pit and all associated site works
Construct (i) storage shed (ii) reroof existing cubicle shed and extend cubicle shed with slatted tank and all associated site works
(1) change of use from the existing tools storage to a kennels room with 4 no. dog pens, (2) change of use from the existing waste & recycling bins storage area to a kennels room with 2 no. dog pens and to a roofed dog exercise area, (3) erection of 4 no. roofed dog exercise areas, (4) new entrance with fenced lane and to close down existing entrance & (5) all associated site development works
2 no. Glamping pods and new sewage connection to the existing BioCycle wastewater treatment system and associated site development works
The collection, treatment and disposal of effluent as a result of bus washing, all together with associated site works