Construction of new single storey infill pitched roof hall extension to front (5.26sqm) new slate clad itched roof structure not exceeding 8.50m in height above ground level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing, area 5.67sqm with roof light over & velux window within front storage space to south elevation and all associated site works
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Retention of 3 first floor offices and a mezzanine floor for storage purposes; free standing detached steel framed; 7 bay open fronted shed at rear.
Retention of existing single storey pitched roof hall extension to front (4.86sq) & construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m with roof light over & 'velux' window within front storage space to side/south elevation and all associated site works.
The development will consist of retention permission at first floor rear extension for bedroom 2 and bedroom 3 (total length 6740mm x 800 mm depth) (reference of grant permission SD20B/0307) and retention permission for ground floor utility storage (6.7sqm) wood frame structure with flat roof.
A new double storey rear extension with first floor projecting 1.5m from the rear. The extension will house a kitchen/dining area and extensions to bedrooms. New masonry facade on front elevation. The construction of new slate clad pitched roof structure not exceeding 8.95m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to attic landing level, roof light over and 'Velux' window to front storage space and all associated site works.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground floor level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing level, area 6.67sq.m with roof light over & Velux window within front storage space to side / south elevation and all associated site works.
Construction of pitched roof structure not exceeding 8.950 metres in height above ground level to cover existing flat roof; new dormer roof over stairwell with frosted window to attic landing level; 2 'Velux' windows to rear; 'Velux' window to front storage space; all associated site works.
Construction of a new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof; new dormer roof over stairwell with frosted window to new attic landling level, area 12.27sq.m with roof light over; 'Velux' window within front storage space to south elevation; all associated site works.
(1) Installation of: a free-standing mezzanine structure in the northern warehouse [413 sq.m GFA]; and two-level free-standing mezzanine structures in the central warehouse [1,760 sq.m GFA] and eastern warehouse [2,130 sq.m GFA], including all associated stairwells and service lifts.(2) Amendments to the internal layout of the south western warehouse including: the relocation and modification of the permitted stairwells; the removal of the western entrance lobby; the enlargement of the permitted central service lift; the enlargement of the southern reception lobby.(3) Amendments to the warehouse access doors on the north and east elevations. (4) Provision of: 10 no. additional car parking spaces to the north-east of the building, including 1 no. accessible space; and the repurposing of 2 no. permitted spaces to the west of the building for EV charging spaces.(5) Provision of: 10 no. additional sheltered bicycle parking spaces to the north of the building.(6) Adaptation of the turning head in the north-west corner of the site to facilitate fire tender access, together with all associated landscaping and facilitating works.(7) Modifications to hard and soft landscaping to accommodate the proposed works, with no net loss of permitted trees.(8) All associated site development and services works, above and below ground, on a site of c.0.86ha.
The development will consist of: (1) Permission for works comprising of: (i) Partial change of use from warehouse to office use at ground floor level [c.270sq.m GFA] and refurbishment of the existing first-floor office [c.263sq.m GFA] in the north of the unit. The office space [c.533sq.m Total GFA] will comprise individual offices, meeting rooms, stairwells and circulation areas, storage areas, plant, canteen facilities, and WC facilities - including a new accessible WC on the ground floor. The proposed works will also include the reinstatement of existing windows and an entrance, the opening of blind windows, and the installation of a new window on the west elevation. (ii) Change of use from motor showroom, including ancillary workshop and office / storage areas, to warehousing [c.1,056sq.m + c.1,065sq.m. GFA] in the south of the unit. The proposed works will include the demolition of internal partition walls, floors, stairs, and doorways in the south-east of the unit. The works will also include the removal of a mezzanine level in the south-west of the unit [c.130sq.m.] and the installation of two new free-standing mezzanine levels [1,056sq.m. GFA at first floor level + 1,056sq.m. GFA at second floor level] with associated stairwells and a service lift in the south-west of the unit. (iii) Reconfiguration of the car park layout to the south and west of the unit to accommodate 35 no. car parking spaces, including 2 no. accessible spaces and 7 no. electric vehicle (EV) charging spaces, and a service yard to the north-east of the unit. (iv) Provision of 15 no. bicycle stands under a dedicated shelter located to the north of the unit, providing secure long-term parking for up to 30 no. bicycles, and provision of 2 no. bicycle stands to the west of the unit, providing short-term parking for up to 4 no. bicycles. (v) Repurposing of the external plant room to a bin store. (vi) Reinstatement and rebranding of 2 no. previously permitted pylon signs (Reg. Ref. SD15A/0190), located to the west and south-west of the unit, respectively. (vii) Provision of designated signage zones located above the glazed sections at the south-west corner of the building, as well as above the office and warehouse entrances on the west and south elevations. (viii) Provision of hard and soft landscaping, including the planting of native trees along the southern and western boundaries. (2) Retention permission for the existing pylon sign located at the main entrance to the site in the south-east corner. The pylon sign is to be rebranded. (3) All associated site development and services work on a site of c.0.8609ha.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site and 1 approx. 70sq.m single storey temporary prefab (prefab 02 comprising 1 classroom) adjacent to the north-west boundary of the site and all associated site works.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground floor level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m with roof light over & Velux window within front storage space to side / south elevation and all associated site works.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Erect 850.87sq.m of photovoltaic panels on the roof of existing building with all associated site works.
A single storey ground floor Granny Flat Extension to the rear of existing dwelling with associated site works. Consisting of 1 bedroom, toilet and open plan kitchen, dining pace and living room with a total combined area of approximately 52msq
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Warehouse extension (circa 87sq.m) at rear.
Construction of one dormer window in the main roof to the rear.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to attic landing level, roof light over and Velux window to front storage space and all associated site works.
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
Extend an existing garden shed at rear; raise existing boundary wall at side/rear from 1.305 metres to 1.985 metres.
Permission Sought to extend existing garden shed to rear including the raising of roof from 2.680 meters to 3.385 meters
Construction of proposed first floor Extension above existing garage at gable end of house. Conversion of existing loft area and the construction of a dormer structure with window to rear roof profile also all associated site works.
Alterations to the existing front facade of the existing industrial unit inclusive of external finishes; Proposed facade feature, new windows and new front door; Proposed internal alterations to existing floor plans; Alterations to existing parking lot to include 12 proposed parking spaces inclusive of 1 disabled parking and 2 EV charging point; Proposed new signage and freestanding signage to vehicular entrance inclusive of all associated siteworks.
The construction of a single storey extention to the front of existing 2-storey mid terrace and all associated site works.
Ground Floor Side Extension With Pitched Roof Over
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
The development will consist of a single storey rear extension and a single storey front extension to the existing two storey terraced house and will include internal alterations
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Single storey extension with tiled roof to the front & first floor extension with a tiled roof over existing rear extension to the existing two storey end of terraced dwelling with alterations to existing rear extension tiled roof; new high level window in existing gable wall structure; internal alterations & associate site.
Front extension to the existing garage converting the space into a gym and office, new windows to the side of the garage and access door to the rear garden, including all associated site works.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Construction of a new single storey rear extension (22sq.m) with pitched roof and all associated site works.
Attic conversion with dormer roof to rear and all associated site works.
Remove existing tiled roof to side extension and form new first floor extension over with tiled roof ridge tiles to match existing at same level with external finishes to match existing; proposed new two storey end of terraced dwelling with tiled roof and external finishes to match existing; new front porch; new front driveway; new vehicular access with new dished footpath and associated site works.
Retention of ground floor front extension to living room and porch.
Retention Permission for existing Marshals Hut 8.8M2 and Revised operating hours: Monday 07:30-17:30, Tuesday 07:30-23:30, Wednesday 07:30-23:00, Thursday 07:30-23:00, Friday 07:30-21:00, Saturday 08:00-19:30, Sunday & Bank Holidays - CLOSED, together with all associated works.
Construction of an acoustic wall, 4.5m high with cranked top to north facing (back) & east and west facing (side) boundaries of existing NCT testing centre and revised operating hours to granted permission Ref: PL 06S.245111 together with all associated site works.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
Detached steel storage shed located to the rear with access from rear private lane.
Retention of Large detached shed with pitched roof over having vehicular access onto a private laneway to the rear, screened behind a steel framed, timber clad gates attached to rendered block pillars.
1. Remove existing flat roof and tiled roof canopy to ground floor Accommodation and construct new first floor extension with pitched roof over to side of existing dwelling 2. Remove existing porch structure and tiled roof and construct new porch to replace existing. 3. All above with associated site works.
Demolish single storey garage to side of house; construct new one and half storey, end terrace dwelling with dormer windows to front and rear (85sq.m); alterations to the existing vehicular entrance for the proposed dwelling; new vehicular entrance for existing dwelling and all ancillary site development works.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.