Erect scaffolding in front of the residential dwellings of number 8, 9 & 10 Main Street, Carnew with the view to replace the existing plaster on the exterior walls with new plaster (material to be used - sand, cement)Decision record indexed
Demolish an existing two storey residential property and ancillary structures and to construct a three storey building consisting of the following; a two-bedroom apartment to the ground floor; a three-bedroom two storey duplex apartment to the first and second floor; connection to existing public services; site works boundary treatments and hard landscaping; ancillary worksDecision record indexed
1) permission for retention of part removal of existing wall and formation of hardcore area and 2) permission to construct a new entrance for overflow car park area and all associated site worksDecision record indexed
Former Bank of Ireland Building, Main Street, Carnew
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - change of use from the existing bank to a community-based remote working hub, and all associated refurbishment works to the existing building, and a new, single storey lean-to extension to the rear of the property connected to the existing building by a new pitched roof structure with a glazed entrance and enclosing the existing flat roofed vault, and the erection of a new shopfront and signage at the front of the building including an integrated decorative entrance gate. The aim of the development is to provide an active and vibrant working environment on Carnew Main Street and to promote well-being, inclusion, and community cohesion for those using and interaction with the buildingDecision record indexed
Change of use of store to residential building consisting of 3 no apartmens with slight alterations to elevations and all associated site works to a protected structure (Ref No 47-02)6 conditions indexed
Erect telecommunications equipment comprising a Canister antenna, dish, support poles, brackets and all other associated equipment and site development works, and to remove the existing telecommunications installation comprising two whip style antennas and other associated equipment on the chimney, roof and buildingDecision record indexed
Continuation of use from retail unit to bookmakers office including the installation of satellite dishes, associated shop front signage and all ancillary worksDecision record indexed
RED III application Level 5 - The development will consist of the installation of a small-scale non-ground source heat pump system (air-to-water heat pump) including external heat pump unit(s), heat pump enclosure, associated underground pipework, electrical connections and all ancillary site works. The proposed development is located within the curtilage of a Protected Structure (RPS No. 47-04), and therefore constitutes works to a protected structure.Decision record indexed