THE DEMOLITION OF THE EXISTING TWO-STOREY DWELLING, WITH THE CONSTRUCTION OF A PROPOSED TWO STOREY DWELLING WITH BASEMENT, MODIFICATIONS TO THE EXISTING OUTBUILDING TO INCLUDE RE-ROOFING, THE INSTALLATION OF ROOFLIGHTS, ADJUSTMENTS TO WINDOWS AND DOOR OPENINGS AND ALL INTERNAL MODIFICATIONS. PERMISSION IS ALSO SOUGHT FOR WORKS TO EXISTING SITE ENTRANCES AND BOUNDARIES TO IMPROVE SIGHTLINE VISIBILITY TO BOTH, THE DECOMMISSIONING OF THE EXISTING SEPTIC TANK AND THE PROPOSED INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITEWORKSDecision record indexed
PROPOSED INCREASED FOOTPRINT TO THE EXISTING 2-STOREY DETACHED DWELLING; PROPOSED EXTENSIONS RANGING FROM SINGLE STOREY TO THE NORTH/NORTH-EAST ELEVATION AND 3-STOREY EXTENSIONS TO ALL OTHER ELEVATIONS; INTERNAL AND EXTERNAL MODIFICATIONS TO THE EXISTING DWELLING TO FACILITATE THE DEVELOPMENT; PROPOSED INCREASE IN THE OVERALL HEIGHT OF THE EXISTING HOUSE WITH THE CONSTRUCTION OF A NEW ROOF TO TIE INTO THE PROPOSED EXTENSION. THE PROPOSED DEVELOPMENT ALSO SEES THE CONSTRUCTION OF A NEW ROOF AND ASSOCIATED EXTERNAL WALL AND EXTERNAL ELEVATIONAL TREATMENTS INCLUDING NEW WINDOWS AND DOORS TO FACILITATE THE PROPOSED EXTENSION. PERMISSION IS ALSO SOUGHT FOR REPLACEMENT OF THE EXISTING ON-SITE WASTEWATER TREATMENT SYSTEM WITH A NEW PROPRIETY WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS. NO CHANGES ARE PROPOSED TO THE EXISTING SITE BOUNDARIES OR VEHICULAR ENTRANCE TO THE SITEGrounds not yet categorised
As constructed dwelling. The application will also include retention for existing rear garage. It should be noted that the applicant was granted permission for a single story dwelling on this site. The previous application reference was 02/1160Decision record indexed
(A) DEMOLITION OF EXISTING SLATTED SHED & STORAGE SHED (B) MODIFICATIONS OF EXISTING ENTRANCE (C) CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOMS, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK (D) ERECTION OF MEAL BIN, WATER STORAGE TANK (E) CONSTRUCTION OF LIVESTOCK CUBICLE FACILITY WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
The amendment to the development previously approved under planning Ref: 23/60196 by a) omitting 4 previously approved No. Lean-to Type Houses (Previous Ref: E 1-4), and replacing with 3 No. Portal Frame type houses (Ref: E1-3), and, b) providing for an alteration to the previously approved stock numbers on the pig farm, resulting in an increase in breeding stock and a reduction in production pigs, at Roundhill and Derry Upper, Kilcormac, Co. Offaly. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) relating to this proposed development will be submitted with this planning applicationDecision record indexed
To demolish 4 No. existing pig houses and to construct 6 No. pig houses and extensions to 2 No. existing pig houses, together with all ancillary structures (to include meal storage bin(s)) and associated site works arising from the above proposed development on an existing pig farm. An Environmental Impact Assessment Report (E.I.A.R.) and Natura Impact Statement (N.I.S.) relating to this proposed development will be submitted with this planning application.Decision record indexed
LOUGH BOORA DISCOVERY PARK, LEABEG, BOORA TULLAMORE CO. OFFALY
RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C.5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10-15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MONA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPICATIONDecision record indexed
Construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site worksDecision record indexed
Construction of a new dwelling house, detached garage, new vehicular entrance, new driveway, borewell, waste water treatment system, storm water soakaways, and all associated site worksDecision record indexed
THE ERECTION OF A NEW DORMER STYLE DWELLING, CONNECTION TO A NEW EFFLUENT WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, THE ERECTION OF A NEW DOMESTIC GARGAGE AND ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLITION OF AN EXISTING COTTAGE, THE CONSTRUCTION OF A PROPOSED TWO STOREY DWELLING WITH ATTACHED GRANNY FLAT, THE BLOCKING UP OF THE EXISTING SITE ENTRANCE, AMENDMENTS TO THE EXISTING ROADSIDE BOUNDARY WITH THE CREATION OF A NEW SITE ENTRANCE, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SEPTIC TANK AND PERCOLATION AREADecision record indexed
CONSTRUCTION OF AN EXTENSION TO THE GROUND FLOOR AND FIRST FLOOR OF THEIR EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED MINOR SITE-WORKS AND DRAINAGEDecision record indexed
THE CONSTRUCTION OF A SINGLE STOREY EXTENTION TO THE REAR OF THE EXISTING DWELLING HOUSE, RELOCATION OF THE SEPTIC TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
Erecting a 30m high telecommunications lattice structure together with antennas, dishes, access track and associated telecommunications equipment, all enclosed by security fencing.Decision record indexed
BOORA AVENUE LEA BEG BOORA BLUEBALL, TULLAMORE, CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKSDecision record indexed
The construction of a new single storey detached domestic dwelling, installation of a new septic tank & percolation area and the construction of a new site entrance and all associated site worksDecision record indexed
CONSTRUCTION OF A 280 CUBIC METER WATER STORAGE RESERVOIR AND ALL ASSOCIATED SITE WORKS. THIS APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS).Decision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
THE CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, SINGLE STOREY GARAGE, EFFLUENT TREATMENT SYSTEM WITH A SOIL POLISHING FILTER, ENTRANCE, BORED WELL, AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, INSTALL ETU WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKS. THE SITE IS LOCATED WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE NAMELY LETTYBROOK HOUSEGrounds not yet categorised
(1) CONSTRUCTION OF A NEW FARM BUILDING TO CONTAIN MILKING PARLOUR, DAIRY, ANCILLARY ROOMS, SLATTED AREAS OVER UNDERGROUND EFFLUENT STORAGE TANKS, DRAFTING & HANDLING FACILITIES, (2) ERECTION OF EXTERNAL MILK SILO & WASH BUILDING (3) ERECTION OF EXTERNAL MEAL BIN, (4) CONSTRUCTION OF UNCOVERED LIVESTOCK CUBICLES AREA, (5) CONSTRUCTION OF NEW FARM ROAD; (6) ALL COMPLETED WITH ASSOCIATED SITE WORKS AND FOR THE PURPOSES OF AGRICULTURE ON FARM LANDSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE, INSTALL ETU WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKS. THE SITE IS LOCATED IN THE CURTILAGE OF A PROTECTED STRUCTURE NAMELY LETTYBROOK HOUSEDecision record indexed
A slatted cubicle shed with slurry tank, revisions to existing farm access road to accommodate new building, new slurry tank in existing bedded livestock shed, concrete yards and ancillary worksDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK SYSTEM AND PERCOLATION AREA TOGETHER WITH SITE ENTRANCE AND ALL ANCILLARY WORKSDecision record indexed
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKSDecision record indexed
LOWERTON BEG, LOWERTON MORE AND CURRAGHMEELAGH TD.'S, BLUEBALL TULLAMORE CO. OFFALY
DEMOLITION OF EXISTING DWELLING AND DOMESTIC GARAGE AND BUILD NEW REPLACEMENT DWELLING HOUSE, DOMETIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF 1 NO. DWELLING, GARAGE, SEPTIC TANK & PERCOLATION AREA, UTILISING EXISTING ENTRANCE ONTO PUBLIC ROAD & ALL ASSOCIATED SITE WORKSDecision record indexed
Construction of a two-storey dwelling, single storey garage, wastewater treatment system, percolation area, new entrance, driveway and all associated site development worksDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS.Decision record indexed
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 7 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, LANDSCAPING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WIL BE CA. 31.1HA. AN NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATIONDecision record indexed
MOBILE HOME, SHED AND TEMPORARY SEPTIC TANK AND PERMISSION WILL CONSIST OF CONSTRUCTION OF SINGLE STOREY DWELLING HOUSE AND PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ANCILLARY WORKS AND SERVICESGrounds not yet categorised
BOORA BAINNE LEA MORE BLUEBALL, TULLAMORE, CO. OFFALY
THE DEMOLITION OF AN EXISTING SHED AND THE CONSTRUCTION OF A NEW SINGLE STOREY SHED CONTAINING 2 NO. MILK VENDING MACHINES, COLD ROOM, WASH ROOM, CHEMICAL STORE, PLANT ROOM AND OFFICE, ANCILLARY CAR PARKING AREA, NEW GRAVEL ACCESS ROAD OFF EXISTING CAR PARK, SIGNAGE AND ALL ASSOCIATED SITE WORKSDecision record indexed