For development which will consist of the construction of a two storey building incorporating 3 ground floor apartments, 3 first floor apartments, common areas and access ways, parking, hard and soft landscaping, connection to existing public services along with all other necessary ancillary works
To demolish a double garage along with ancillary site works
For material change of use of existing funeral home into a residential townhouse including all ancillary works
For the erection of 14 no. floodlighting poles (5m high) with a floodlighting average spread of 7.4 Lux at path level and an average of 6.0 Lux at the lower car park and 37 no. (1m high) 6w LED Bollards
To change use from existing restaurant, to office use for ground floor portion of property
To replace a 12m wooden pole with a 21m high telecommunications monopole together with antennas, dishes and associated telecommunications equipment, enclosed by security fencing
For development which will consist of the construction of telecommunications infrastructure comprised of; an 18 metre monopole support structure (21.1m overall structure height to top of omni antennas) carrying antennas, dishes and associated telecommunications equipment, together with new ground level equipment cabinets, fencing and all associated site works. The proposal includes the removal of an existing 10 metre wooden pole with emergency services equipment to be replaced onto the new support structure
For the construction of a single storey extension to the existing dwelling with a detached single storey garage and all ancillary works
Of revised site boundaries as constructed from that previously granted - File Ref P02-673
For development which will consist of the demolition of an existing single storey extension to the side of the dwelling and demolition of a single storey boiler house to the rear of the dwelling, the construction of a single storey extension to the side of the dwelling, construction of a single storey extension to the rear of the dwelling, thermal upgrade to the existing dwelling and ancillary site works
To carry out the folllowing development: Extension of the existing burial ground at Carrowmore, Scarriff, Co Clare. The proposed development will include: 1. Circa 167 double plots and 10 single plots, 2. Access road improvedments including turning bays, 3. Footpaths, 4. Drainage, 5. Tarmacadam finish to existing parking areas, 6. 2 no. Columbarium Walls and Shrine, 7. Associated site works. In accordance with the Habitats Directive, Apropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determinated has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
For development which will consist of extensions and alterations to existing dwelling, the provision of a granny flat and all ancillary works
To construct a dwelling house, entrance, waste water treatment system and percolation and associated siteworks
To demolish sheds in rear garden and to construct an extension to rear of private dwelling house, construct new porch to front of private dwelling house along with all associated site works
Of a sunroom and small extension to the dining room both at the side of his house and retention of glass door in lieu of permitted window at the front of his house and all associated site works
To erect a dwelling house, garage, driveway, install a septic tank and percolation area and all associated works
To extend the existing club house building
To erect a dwelling house and private garage and to connect to mains water and sewer and all associated site works
To erect a dwellinghouse and private garage and to connect to mains water and sewer and all associated site works
To replace existing cattle slurry storage facilities with new slatted tank
Of as constructed extensions to the front and side of an existing domestic garage, (including the provision of a garden room), raising the ridge and eaves heights to provide a first floor loft storage space and forming a gable to the front and rear of the extended garage in lieu of hipped roofs
To RETAIN the following development completion of modifications to existing semi-derelict dwelling including an increase in floor area, installation and commissioning of a replacement waste water treatment system, connection to necessary services together with all associated incidental and site works
For the foundations and walls to ground floor level of a garage as constructed, which differs to that granted under planning permission P08-147, and for PERMISSION to extend the foundation, and to construct a garage with hobby room, all with associated site works
To carry out the following development: a) Construct a public car park on green field site in the village centre of Bodyke to include b) Provision of vehicular and pedestrian access from the R352 roadway via alterations to existing access. c) Provision of additional pedestrian access to the car park from the adjacent Bodyke Community Park. d) Provision of cycle parking and repair station. e) Installation of public lighting. f) Connection to existing surface water drainage system, via a proposed rain water garden. g) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project and the screening report accompanies the application. A preliminary examination of the nature, size and location of the development has been carried out pursuant to Article 120(1) of the Planning & Development Regulations, 2000 (as amended) and it has been concluded that there is no real likelihood of significant effects on the environment arising from the proposed deveopment and, accordingly an Environmnetal Impact Assessment is not required
For the demolition of a storey and a half, derelict, detached cottage and for a replacement part two storey, part single storey house, a waste water treatment system and all associated works
For the development of a private garage and polytunnel and associated site works
Of the conversion of old stables to a guest cottage, connection to existing services and all associated site works. The stables area to the rear of Fort Edward House which is a protected structure
To construct a six bay slatted cattle shed with creep area and cattle handling area
To a) RETAIN modifications to dwelling house, b) RETAIN private garage to rear of dwelling house and c) RETAIN site boundaries / site entrance / site layout as constructed along with all associated site works and services. Original planning reference P95/1017
To construct a single storey dwelling house, detached store/plant room, covered car port, PV Solar panels, entrance, boundary walls, connection to existing public foul sewer and all associated site works
To alter and extend dwelling house and associated site works.
To raise the level of the land for agricultural purposes by infilling low lying land with topsoil, subsoil, rock and construction rubble and carry out associated site works in accordance with the submitted details
To construct a dwelling house with ancillary site works
To renovate / alter dwelling, to include removal of part of rear external wall and internal walls, remove lean-to roofs at side and rear and replace with new raised roof, with 3 no. velux type windows and flat roof and to erect new extension at rear, with ancillary works, to provide new internal layout
For 40' Storage Container
To install an all weather pitch and floodlighting and all associated site works
To install a padel ball court and all associated site works
To extend the appropriate period of planning for P18/591 to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
To erect a dwelling house and garage, install an effluent system and all associated site works
Retain existing garden shed and all associated site works to the rear of their house
To construct a dwelling house, entrance, sewage treatment system, bored well, garage/shed for domestic use and all other associated site works
To demolish to derelict dwelling house, construct a dwelling house, waste water treatment system with percolation area and associated site works
To erect a private garage and extend existing driveway to this garage all for private domestic use and all associated site works
To RETAIN effluent treatment system and percolation (installed to replace old septic tank) and all associated site works.
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
Of alterations and extension to derelict cottage, including raising of cottage ridge height, provision of ground and first floor extension, enlarged porch structure to front elevation, removal of front boundary ditch and provision of vehicular entrance. PERMISSION is sought to complete building work to cottage and extension, complete front boundary with appropriate hedge planting and stone wall splayed site entrance, installation of waste water treatment system with percolation area and associated site works
To alter and extend dwelling house and associated site works
Of an existing garage for private domestic use and all associated site works
To construct a 3 bedroom single storey dwelling house, entrance onto public roadway, effluent treatment system and associated works
For development which will consist of side and rear extension to existing dwelling, alterations to existing elevations, replacement of existing sewage treatment system and all ancillary works