Castlepark Castlelands (Townland) St. Joseph's Road Mallow, Co. Cork
A ten year Permission for the following Large Scale Residential Development (LRD) comprising of the construction of 469 no. residential units to include 305 no. dwelling houses (comprising a mix of 1,2,3 and 4 bed detached, semi-detached, townhouse/terraced and bungalow units) and 164 no. apartment/duplex units (comprising a mix of 1 and 2 bed units), 1 no. creche with a community room, part demolition and refurbishment of the former lodge to provide an interpretive centre and café and all associated ancillary development works including vehicular and pedestrian access (via the existing Castle Park residential estate), drainage, footpaths and cycle lanes, landscaping, amenity and open space areas, boundary treatments, bicycle and car parking, bin and bike storage, plant, public lighting and all other ancillary development at Castlepark, Castlelands (townland), St. Joseph’s Road, Mallow, Co. Cork. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been submitted to the planning authority with the application. The Environmental Impact Assessment Report and Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Local Authority. The application may be inspected online at the following website set up by the applicant: www.castlelandslrd.ie.Decision record indexed
Change of use from Bistro (Vacant Unit) and Retail (Vacant Unit), as previously approved under planning reference 55046/04 & 55020/09, to 1no. unit to be used as offices, where services will be provided to visiting members of the general public, being the ground floor of an existing 3-storey over basement mixed use building.Decision record indexed
Permission for Retention of existing dwelling house (change of layout from that previously granted under Planning Reg. No. 75/245), rear extension and revised vehicular access location and permission for decommissioning existing septic tank and installation of new packaged wastewater treatment system and polishing filter.Decision record indexed
Unit No. 13 Market Square New Road Mallow, Co. Cork
Change of use of the ground floor unit from the existing commercial/ retail use to office use. The proposed development consists of internal modifications to the ground floor unit and its incorporation into the existing principal office use of the building, signage and all ancillary site development works.Decision record indexed
Castlepark, Castlelands(townland) St. Joseph's Road Mallow co.Cork
Permission for the construction of 99 no. residential units (comprising 95 no. 2-,3-,4- bed semi-detached house and townhouses and 4 no. 1- and 3-bed duplex/apartment units), creche and all associated ancillary site development works including vehicular access, parking, footpaths, drainage, amenity areas, and wastewater treatment plant. A Natura Impact Statement will be submitted to the planning authority with the application.Decision record indexed
Permission for 1)subdivision of an existing building to form two separate units, 2) change of use of one unit from fitness centre to a retail/workshop for a picture framing business, 3) construction of a single storey extension to the side of the existing building to provide an entrance/reception area for customers to the picture framing business, 4) alterations to elevations to existing buildings, 5) Erection of associated signage on the buildingDecision record indexed
Grove Cottage St. Joseph's Road, Castlelands Mallow Co.Cork
Permission for alterations & extensions to an existing dwelling as follows 1) a single storey flat roof side extension, 2)a pitched roof front porch extension, 3) an upper floor bay window extension to the rear, 4) alterations to sizes & positions of existing external window, door & rooflight openings to the front, side & rear - including forming new openings & blocking up existing openings, 5) the addition of concrete barges to all existing pitched roofs, 6) the removal of chimney & 7) all other associated site works. Permission is further sought for retention of the following a) a first floor extension on the western side, b) roof lights to the front & rear, c) the entire tiled roof finish - originally proposed to be slate, d) the dashed render external wall finish - originally proposed to be brick & e) a detached domestic use shedDecision record indexed
Permission for retention of changes made to roof, front and side elevations of the side extension previously granted planning permission (Pl.Reg.No. 16/7118) which was completed in 2017.Decision record indexed
Permission for the retention of the existing dwelling house, domestic storage shed, all as constructed with all associated site and ancillary worksDecision record indexed
Permission for retention of 1) existing livestock shed with underground slatted slurry storage tanks and associated concrete apron, 2) existing agricultural shed used for the purpose of a dry feed store, 3) existing agricultural mixed use shed being part livestock housing, part machinery housing and part feed storage with ancillary walled yard with concrete surface and associated site works.Decision record indexed
Unit No. 17, Market Square Mallow Town Mallow Co. Cork
Development comprising of change of use of the ground floor unit of No. 17 Market Square from the existing commercial/retail use to use as active community day service/meeting hub. The proposed development will also consist of internal modifications to the ground floor unit, new signage and all associated site worksDecision record indexed
Permission for change of use from office space to residential use, to include a total of three apartments, consisting of one 3 bedroom apartment on the ground floor of number 1 Landscape Terrace, one 2 bedroom apartment on the first floor, which spans across numbers 1 & 2 Landscape Terrace and one 2 bedroom apartment on the second floor, which spans across Numbers 1 & 2 Landscape Terrace and to carry out associated alterations to elevations of both buildings, as well as alterations to a section of the ground floor of number 2 Landscape Terrace to allow for revised stairs design.Decision record indexed
Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.Decision record indexed
A residential development comprising the construction of 85 number dwelling houses and all associated ancillary development works including vehicular access, parking, footpaths, foul and storm water drainage (including the provision of a surface water attenuation tank), landscaping and amenity areas at Annebella (townland), Mallow, Co.Cork. Extension of Duration to Permission granted under Planning Ref. No. 21/6648, 15/6970, Bord Pleanala Appeal reference no. PL04.247607Grounds not yet categorised
The construction of a single-storey extension onto rear of dwelling house and the alteration of elevations to rear and south side of dwelling house.Decision record indexed
To erect a 30m telecommunications support structure carrying antenna and dishes and, together with associated ground equipment cabinets and associated equipment, extension to existing access track and site works within a Coillte forest.Decision record indexed
Permission for large-scale residential development (LRD), the construction of a residential development of 102 no. residential units comprising of 36 no. dwelling houses and 66 no. apartment/duplex/maisonette units, a two storey creche facility and all ancillary site development works. The proposed 36 no. dwelling houses will all be 3 bedroom mid and end terrace units. The proposed 66 no. apartment/duplex/maisonette units consist of 17 no. 3 bedroom units, 33 no. 2 bedroom units and 16 no. 1 bedroom units. 32 no. of the proposed apartment/duplex/maisonette units will be accommodated in 8 no. 2 storey buildings in southern and central areas of the site, with the remaining 34 no. apartment/duplex/maisonette units being accommodated in a 1-3 storey apartment building to the north of the site. The proposed development facilitates pedestrian and cycle connections to the existing Woodview Drive residential development to the east and the residential development to the west permitted by An Bord Pleanála reference 312640-22, which is currently under construction. Access to the proposed development will be provided via the internal road network of the Annabella Park residential development. The proposed development provides for upgrades to the existing internal road network and public realm of the Annabella Park residential development including new footpaths, public lighting and traffic calming measures. Other ancillary site development works include landscape and amenity areas, public open spaces, servicing and drainage proposals (including SuDs measures), bicycling parking, bin storage facilities and an ESB substation. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. LRD Website: www.AnnabellaLRD.ieDecision record indexed
Ballyclough AGI (Above Ground Installation) West End Annabella Mallow, Co. Cork
The development will consist of replacing approximately 155m of existing 2.4m high chainlink fence and associated access/emergency gates with 155m of new 2.4m high green palisade security fencing/gates and all associated site work at an existing above ground natural gas installation.Decision record indexed
Permission to demolish existing 2 storey rear extension to existing dwelling and to construct a new 2 storey extension to the rear of same dwelling and all associated site worksDecision record indexed
The corner of William O'Brien Street and Muddy Hil Mallow Co. Cork
The development is located within the ACA (ACA-1) area and consists of the retention of works to include: 1) The change of use of the ground floor public bar, lounge and toilets into a retail unit and 2 No. apartments. 2) The change of use of the first-floor kitchen and lounge area into 3 No. apartments. 3) The change of use of second floor toilets and store into 1 No. apartment. The development also consists retention to the alteration to front/west elevation including an additional door serving the retail unit, alteration to decorative timber facade and signage and the replacement of ground floor windows and doors to aluminium.Grounds not yet categorised
Construction of new dwelling and garage with all associated services and site works. Extension of Duration of Permission granted under Planning Reference: 14/06026.Decision record indexed
Permission for construction of a new attached domestic garage and alteration to side of existing dwelling and new extension to rear of existing dwelling and all associated site works.Decision record indexed
Permission for a change of use of existing ground floor retail unit for use as an extension to existing dental surgery practice and all associated site works and services.Decision record indexed
Permission for retention of change of use of apartment to retail storage area, associated with the Nagle Fireplaces retail unit, which is located directly underneath.Decision record indexed
Shoulders Lane (to rear of no 6 Fair Street East) Mallow Co.Cork
Retention permission for the partial demolition of existing derelict shed and Permission for the following: A) demolition of the remains of the existing derelict shed, and all associated site worksDecision record indexed
Shoulders Lane (to rear of No.6 Fair Street East) Mallow Co. Cork
Retention permission for the partial demolition of existing derelict shed and permission for the following: a) demolition of the remains of an existing derelict shed, b) construction of a 2 storey building comprising of 1no. 1 bed apartment at ground floor and 1no. 1 bed apartment at first floor level, each with own private open area terrace/balcony and associated screening, 2 no. roof lights to rear, rear boundary wall and all associated site works.Grounds not yet categorised
Permission for retention of ground floor rear extension to existing two-storey store and office building. Also, permission for change of use of entire building from store and office to retail, including 1no. off-license retail and 1no. general retail on part of ground floor, and 1no. 3-bedroom apartment on part of ground and entire first floor. The proposed development also includes new first floor extension to proposed apartment, and elevational changes on all elevations including new access door to proposed apartment on side elevation and associated site works.Decision record indexed
Change Of Use Of Existing Building From Retail To Residential / A Dwelling, Including Minor Modifications To The Elevations.Grounds not yet categorised
Permission for change of use of ground floor in existing 3 storey building from commercial use to domestic use as 3 storey dwelling house and all associated site works.Decision record indexed
Permission for retention for existing single storey extension as constructed to front and side of dwelling, 3 no. roof lights to rear roof, gable window, elevational changes to rear façade and all associated modifications to side and front elevations and all associated site worksDecision record indexed
15 and 16 West End Thomas Davis Street Mallow Co. Cork
Permission for renovations, alterations and change of use of derelict building previously used as office to restaurant use with staff facilities, office and events room on first floor and permission for the demolition of existing extensions to rear and construction of new extension to same.Decision record indexed
2nd Floor, Unit 1 Market Square, William O'Brien Street Mallow Co.Cork
Permission on the 2nd floor of existing mixed use building for change of use of office space to residential to include 2 no. apartments and for permission on the 2nd floor for material alteration to existing internal stairway enclosure to accommodate same and all associated site worksDecision record indexed
Permission for reclamation of land for agricultural use by filling low lying area with imported clean soil including a temporary passageway to facilitate reclamation and all associated site works.Grounds not yet categorised
Permission to install a new pedestrian access entrance door to the east elevation of the existing building with all associated site and ancillary worksDecision record indexed
Alteration/modification of the previously permitted (Ref: 21/6805) internal alterations, refurbishment and change of use of the apartment and office building (Protected Structures Reg. No’s 100,101 & 102). The proposed amendments include: (1) Provision of 2 No. additional residential units (1 bed split level) in lieu of the previously permitted management office at basement and ground floor levels (15 No. residential units in total); (2) Amending Unit 04 at ground floor to a 1 bed unit; (3) Provision of new staircase from the ground to basement in No. 5 West End; (4) Internal wall insulation proposed to external walls of basement level; (5) Internal alterations to third floor and provision of 2 No. roof AOVs; (6) Provision of 4 No. additional resident car parking spaces in lieu of the previously permitted staff parking.Grounds not yet categorised
Proposed internal alterations, refurbishment and partial change of use (1082sqm) from office to residential of No’s 5, 6 and 7 West End, Mallow, Co. Cork (Protected Structures Reg, No’s 100, 101 and 102) to provide 13 no. apartments (2 no. studio, 6 no. 1-bed and 5 no. 2-bed) an ancillary split-level management office and ancillary storage areas. External proposals include a new bicycle/refuse store, minor amendments to the existing car park and all associated site works. No alteration to the existing external elevations are proposed.Decision record indexed
The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork
The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).Decision record indexed
142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork
Development, reconstruction and refurbishment of existing 3 storey buildings at no’s 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 4 no. housing units and salon consisting of the following works; The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 Bank Place and a salon to the rear of 142 Bank Place at ground and first floor levels, accessed via Hibernian Way to include; (1) Permission for following: Replacement of rear of slate roof of 142 Bank Place, replacement of existing galvanized roof to the rear of first floor at 142 Bank Place, demolition and rebuilding of upper front and rear facades of 142 Bank Place, replace new windows to match existing at 143 Bank Place, openings in existing party wall between 142 and 143 Bank Place at first and second floor levels, change of use to residential of (14.5 sqm) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings. Change of use of salon (49 sqm), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sqm) to the rear of no 143 Bank Place, construction of second floor extension (14.5 sqm) to the rear of no 142 Bank Place, for access to proposed apartments, Modifications to elevation at first and second floors to the front of no 142 Bank Place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include; removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no 142 Bank Place, construction of first and second floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, Exposure of existing windows in Hibernian Way. The proposed development is within the Mallow town centre architectural conservation area.Decision record indexed
17 The Brambles Castlepark, Castlelands Mallow Co.Cork
Permission for the construction of a single-floor extension to the rear of the existing dwelling to be used as a sitting room, for alterations to the layout and south side elevation of the existing dwelling associated with the construction of the extension and for the replacement of all windows nd front door entrance of the existing dwelling with more energy efficient windows and door.Decision record indexed
Nos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork
Retention permission is sought for plant at roof level. Permission is sought for the provision of a screen for the plant with a maximum height of c.2.539 metres along the edge of the roof on the western elevation.Decision record indexed
Bank Of Ireland, 150 Bank Place Main Street Mallow Co. Cork
Permission to install a new external ATM with associated signage, and proposed new surround panel to the front elevation of the bank building with all associated site works (NIAH protected structure reference number 20815111)Grounds not yet categorised
Permission for the demolition of existing commercial units and 1 no. residential unit, part of a block wall and stone wall and the construction of 9 no. residential units in total consisting of 7 no. town houses, 2 no. apartments, hard landscaping, planters, communal storage area and associated site works. The proposed development is within the Mallow ACA.Decision record indexed
To alter and extend their existing butcher shop and to convert 1st. and 2nd floors into living accommodation. The development will consist of (1) the change of use of existing ground floor public house/late bar at 67 Thomas Davis Street to a retail butcher, commercial kitchen, delicatessen with associated staff facilities and storage, (2) the merging of ground floors at 66 and 67 Thomas Davis Street, (3) the installation of cold rooms and raw meat preparation areas, (4) alterations to elevations of 66 and 67 Thomas Davis Street to form a new shop front, (5) conversion and change of use of existing 1st and 2nd floor office and toilet spaces into 2no. 2 bedroom apartments with access to Thomas Davis Street, (6) removal of existing public house/late bar smoking room to rear of unit 67 Thomas Davis Street to include space in commercial kitchen and (7) all associated site works.Decision record indexed
Nos. 144A (McDonald's Restaurant) and 144B (existing vacant retail unit) Bank Place, Thomas Davis Street Mallow, Co. Cork
The development will consist of the change of use of No. 144B (77.5 sq m) from an existing retail unit to restaurant and the amalgamation of Nos. 144A and 144B to provide an enlarged McDonald’s restaurant (495.5 sq m), the 2 no. units were previously subdivided in the 1990’s and as such, the proposed development will restore the ground floor of the building to its original layout of 1 no. commercial unit. The proposed development also includes associated amendments to the facade of the proposed enlarged restaurant unit with associated signage and digital window poster; amendments to the existing drive thru arrangement principally comprising the replacement of the single drive thru lane with with a 2 no. lane drive thru arrangement with associated signage and menu boards; the relocation of the 4 no. existing accessible car parking spaces to facilitate to the new drive thru arrangement; and 1 no. new car parking space adjacent to the western boundary of the subject site.Decision record indexed